Data center is an information hub and resource for information-centric society. Since data center houses hundreds to ten thousands servers, networking and communication equipment, and supporting systems energy saving is one of the hottest issues for green data center. Among several solutions for green data center this paper introduces higher voltage direct current (DC) power feeding system. Contrary to legacy alternating current (AC) power feeding system equipped with Uninterruptible Power Supply (UPS), higher voltage DC power feeding system is reported to be a more energy efficient and reliable solution for green data center thanks to less AC/DC and DC/AC conversions. Main focus of this paper is on reliability issue for reliable and continuous operation of higher voltage DC power feeding system. We present different types of configuration of the power feeding systems according to the level of reliability. We analyze the reliability of the power feeding systems based on M/M/1/N+1/N+1 queueing model. Operation of the power feeding system in case of failure is also presented.
The $2{\times}25kv$ AT electric power feeding method in the A.C. electric train adopts the one-phase power feeding method as the standard due to a voltage phase difference, and the distance between the two neighboring substations is 50km due to voltage drop. The one-phase power feeding method makes the system operation feasible, while making it unfavorable for power supply. Moreover, railroad involves large-capacity single-phase load, and if it is expected to continue to rise, it is necessary to research on measures to stabilize the supply of power to railroad cars with the existing facilities. In this study, a parallel power feeding method between neighboring substations is proposed to stabilize the supply of electric power to electric railroad cars under the 2*25kv AT power feeding method and the loop current induced by voltage phase difference between the two neighboring substations during parallel power feeding is investigated.
This paper compares power losses between voltage controlled before and after using power conversion device in AC feeding system. For this purpose we present voltage control procedures and criteria and model high speed line and train using PSCAD/EMTDC to compare power losses in various feeding condition. Power losses of the simulation result in power control before and after in single point feeding system was reduced maximum 0.37 MW(23.8 %) and average 0.23 MW(20.5 %) when one vehicle load operates maximum load condition. When three vehicles operate maximum load condition in one feeder section, power losses after voltage control was reduced 1.03 MW(49.5%) compared to before voltage control. And, power loss of parallel feeding system is reduced the average 0.08 MW(7.2 %) compared to the single feeding system. In conclusion, adaptive voltage control method using power conversion device can reduce power losses compared with existing method.
The railway power feeding system is divided into AC power feeding system and DC power feeding system. In downtown area. DC power feeding system is used and AC power feeding system is used in intercity railway system. AC power feeding system raises a inductive disturbance that is divided into electrostatic induction and electromagnetic induction. Especially, it has a bad effect on communication lines. So inductive disturbance reduction method has been adopted in many system. In this paper, we deals with the inductive disturbance reduction method of railway power feeding system and of sides affected by inductive disturbance.
The electrified railway has various power supply schemes. Although the identical trains are operated in same condition and the impedance of track are equal, the genealogy impedance of track is changed according to composition method of feeding scheme. So, the collection voltage of train and supplying power from railway substation are greatly unlike. For simulation of collection voltage and power supply according to feeding scheme, using 6-port network analysis proposed previously simulate collection voltage and supply power according to feeding scheme(Parallel Post feeding system, normal feeding system and tie feeding system) and compare and investigate each characteristics.
A parallel-feeding AC traction power system increases the power supply capacity and decreases voltage fluctuations, but the circulating power flow caused by the phase difference between the traction substations prevents the system from being widely used. A circuit analysis shows that the circulating power flow increases almost linearly as the phase difference increases, which adds extra load to the system and results in increased power dissipation and load unbalance. In this paper, we suggest a phase shifter for the parallel-feeding AC traction power system. The phase shifter regulates the phase difference and the circulating power flow by injecting quadrature voltage which can be obtained directly from the Scott-connection transformer in the traction substation. A case study involving the phase shifter applied to the traction power system of a Korean high-speed rail system shows that a three-level phase shifter can prevent circulating power flow while the phase difference between substations increases up to 12 degrees, mitigate the load unbalance, and reduce power dissipation.
The power flow analysis of electrified railway is required complicated calculation, because of variable load. Train runs trough rail supplied by electric power therefore, the load value in electrified railway system fluctuates along time. The power flow algorithm in electrified railway system is different from general power system, and the power flow simulation is peformed by the particular simulation software. Powerail is simulation software for analysis of traction power supply system developed by KRRI, in 2008. This consists of load forecasting module, including TPS and time scheduling, and power flow module. This software was verified by measured current under normal feeding condition, however, has not been verified by voltage on the condition of extended feeding. This paper presents the verification of PowerRail based on voltage drop under extended feeding condition. This is performed by comparing simulation result with field test. Field test and simulation is done in commercial railway line.
The power supply system in Korean electrified railway has adopted AT feeding. If a fault occurs in some substation for any reason, the vicinity substation must feed electric power on the outage substation through catenary. So, the feeding distance grows twice of the normal state at extended feeding condition. If substation's feeding distance is longer than normal condition, the catenary impedance and train to supply electric power from the substation. Therefore, the severe voltage drop can occur and power supply shall be not allowed. This paper presents the model of compensator against voltage drop using multi-port network algorithm. Whole traction power supply system can be analyzed with this model. Computer simulation including this model is performed based on real train schedule and increased schedule in case studies.
To make sure of the usefulness of extract of Rubus coreanus Miquel for producing functional feeding honey, we compared some antioxidative indicators of feeding honey using extract of Rubus coreanus Miquel with acacia honey, SueBee Clover honey(USA), feeding honey on the market. The water content of four honeys were 16.6~26.5%, pH were 3.18~3.70, and titratable acidity ranged 0.018~0.022%. The phenolic compound contents of SueBee Clover honey and feeding honey using extract of Rubus coreanus Miquel were 8.3 mg/100 g and 7.3 mg/100 g, respectively, and were significaltly higher thgheacacia honey and feeding honey on the market. The flavonoid contents per 100 g of honey ranged from 2.3 mg(acacia honey) to 15.0 mg(SueBee Clover honey). DPPH anion scavenging activity of four honeys were not high. 0.5~2.0 g/ml of feeding honey using extract of Rubus coreanus Miquel was 16~36% and showed a concentration-reliant figure. At the concentration of 0.25~0.75 mg/ml, the reducing power of four honeys increased concentration-dependently, and the power of 0.25 mg/ml of feeding honey using extract of Rubus coreanus Miquel was corresponding to thgt of $150{\mu}g$/ml of a vitamin C solution. ABTS radical scavenging activity of feeding honey using extract of Rubus coreanus Miquel was 43.3~68.4%; the highest activity amongst all samples. When plotting the dose-response curve, ABTS radical scavenging activity also increased as their concentration increased from 62.5 mg/ml to 500 mg/ml. The heat treatment reduced the phenolic compound contents of acacia honey and feeding honey using extract of Rubus coreanus DPPH anion scavenging activity of feeding honey on the market and feeding honey using extract of Rubus coreanus Miquel did not changed significaltly after heating for 20 min, and the three honey except SueBee Clover honey maintained the reducing power with the same treatment.
This paper analyzed catenary impedance characteristics of relays installed in substation and sectioning post to protect power feeding circuit in the extended power feeding conditions. For this, we modelled AT feeding system using PSCAD/EMTDC and calculated catenary impedance. The relay installed in substation calculated catenary impedance of the extended power feeding area adding catenary impedance of self protection zone. But, the relay installed in sectioning post calculated catenary impedance of the only protection area. Therefore, we confirmed that the more reliable protection way can be utilized using the relay installed in sectioning post.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.