• Title/Summary/Keyword: Power transportation capacity

Search Result 80, Processing Time 0.022 seconds

Analysis on the Operation of a Charging Station with Battery Energy Storage System

  • Zhu, Lei;Pu, Yongjian
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.5
    • /
    • pp.1916-1924
    • /
    • 2017
  • Fossil oil, as the main energy of transportation, is destined to be exhausted. The electrification of transportation is a sustainable solution to the energy crisis, since electric power could be acquired from the inexhaustible sun, wind and water. Among all the problems that hinder the development of Electric Vehicle (EV) industry, charging issue might be the most prominent one. In this paper, the service process of a charging station with Battery Energy Storage System (BESS) is analyzed by means of $Cram{\acute{e}}r$ - Lundberg model which has been intensively utilized in ruin theory. The service quality is proposed in two dimensions: the service efficiency and the service reliability. The arrival rate and State of Charge (SOC) upon arrival are derived from 2009 National Household Travel Survey (NHTS). The simulations are performed to show how the service quality is determined by the system parameters such as the number of servers, the service rate, the initial capacity, the charge rate and the maximum waiting time. At last, the economic analysis of the system is conducted and the best combination of the system parameters are given.

Non-Orthogonal Multiple Access (NOMA) to Enhance Capacity in 5G

  • Lim, Sungmook;Ko, Kyunbyoung
    • International Journal of Contents
    • /
    • v.11 no.4
    • /
    • pp.38-43
    • /
    • 2015
  • Non-orthogonal multiple access (NOMA) where all users share the entire time and frequency resource has paid attention as one of the key technologies to enhance the spectral efficiency and the total throughput. Nevertheless, as the number of users and SIC error increase, the inter-user interference and the residual interference due to the SIC error also increase, resulting in performance degradation. In order to mitigate the performance degradation, we propose grouping-based NOMA system. In the proposed scheme, all users are divided into two groups based on the distance between the BS and each user, where one utilizes the first half of the bandwidth and the other utilizes the rest in the orthogonal manner. On the other hand, users in each group share the spectrum in the non-orthogonal manner. Grouping users can reduce both the inter-user interference and residual interference due to the SIC error, so it can outperform conventional NOMA system, especially in case that the number of users and the SIC error increase. Based on that, we also present the hybrid operation of the conventional and the proposed NOMA systems. In numerical results, the total throughput of the proposed NOMA systems is compared with that of the conventional NOMA systems with regard to the number of users and SIC error. It is confirmed that the proposed NOMA system outperforms the conventional NOMA system as the number of users and the SIC error increase.

Experimental research on vertical mechanical performance of embedded through-penetrating steel-concrete composite joint in high-temperature gas-cooled reactor pebble-bed module

  • Zhang, Peiyao;Guo, Quanquan;Pang, Sen;Sun, Yunlun;Chen, Yan
    • Nuclear Engineering and Technology
    • /
    • v.54 no.1
    • /
    • pp.357-373
    • /
    • 2022
  • The high-temperature gas-cooled reactor pebble-bed module project is the first commercial Generation-IV NPP(Nuclear Power Plant) in China. A new joint is used for the vertical support of RPV(Reactor Pressure Vessel). The steel corbel is integrally embedded into the reactor-cabin wall through eight asymmetrically arranged pre-stressed high-strength bolts, achieving the different path transmission of shear force and moment. The vertical monotonic loading test of two specimens is conducted. The results show that the failure mode of the joint is bolt fracture. There is no prominent yield stage in the whole loading process. The stress of bolts is linearly distributed along the height of corbel at initial loading. As the load increases, the height of neutral axis of bolts gradually decreases. The upper and lower edges of the wall opening contact the corbel plate to restrict the rotation of the corbel. During the loading, the pre-stress of some bolts decreases. The increase of the pre-stress strength ratio of bolts has no noticeable effect on the structure stiffness, but it reduces the ultimate bearing capacity of the joint. A simplified calculation model for the elastic stage of the joint is established, and the estimation results are in good agreement with the experimental results.

Route Optimization for Energy-Efficient Path Planning in Smart Factory Autonomous Mobile Robot (스마트 팩토리 모빌리티 에너지 효율을 위한 경로 최적화에 관한 연구)

  • Dong Hui Eom;Dong Wook Cho;Seong Ju Kim;Sang Hyeon Park;Sung Ho Hwang
    • Journal of Drive and Control
    • /
    • v.21 no.1
    • /
    • pp.46-52
    • /
    • 2024
  • The advancement of autonomous driving technology has heightened the importance of Autonomous Mobile Robotics (AMR) within smart factories. Notably, in tasks involving the transportation of heavy objects, the consideration of weight in route optimization and path planning has become crucial. There is ongoing research on local path planning, such as Dijkstra, A*, and RRT*, focusing on minimizing travel time and distance within smart factory warehouses. Additionally, there are ongoing simultaneous studies on route optimization, including TSP algorithms for various path explorations and on minimizing energy consumption in mobile robotics operations. However, previous studies have often overlooked the weight of the objects being transported, emphasizing only minimal travel time or distance. Therefore, this research proposes route planning that accounts for the maximum payload capacity of mobile robotics and offers load-optimized path planning for multi-destination transportation. Considering the load, a genetic algorithm with the objectives of minimizing both travel time and distance, as well as energy consumption is employed. This approach is expected to enhance the efficiency of mobility within smart factories.

Sizing of Powertrain in Fuel Cell Hybrid Vehicles (연료전지 하이브리드 자동차의 동력전달계의 용량 선정)

  • Zheng, Chun-Hua;Shin, Chang-Woo;Park, Yeong-Il;Cha, Suk-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.19 no.6
    • /
    • pp.113-118
    • /
    • 2011
  • Fuel Cell Hybrid Vehicle (FCHV) is one of the most promising candidates for the next generation of transportation. It has many outstanding advantages such as higher energy efficiency and much lower emissions than internal combustion engine vehicles. It also has the ability of recovering braking energy. In order to design an FCHV drive train, we need to determine the size of the electric motor, the Fuel Cell System (FCS), and the battery. In this paper, the methodology for the sizing of these components is introduced based on the driveability constraints of the FCHV. A power management strategy is also presented because the battery energy capacity depends on it. The warm-up time of the FCS is also considered in the power management strategy and the simulation result is compared to that without considering the warm-up time.

A Study on the Improvement for EMU Maintenance System of Urban Transit (도시철도 전동차 유지보수체계의 개선에 관한 연구)

  • Kim, Kyu-Joong;Lee, Keun-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.87-92
    • /
    • 2010
  • Urban transit system must secure fast, safe and reliable transportation capacity as a metropolitan mass transit. For this purpose, it is important to make all the sub-systems (which consist of EMU, power feeding, signaling & telecommunication, railway, platform facility, and control system and so on) work well. To operate all the systems effectively and reliably, a maintenance measure optimal to each system's characteristics is needed to be established and executed. So, highly reliable maintenance should be performed. But, EMU maintenance methods suitable to its own model and EMU lines are not yet introduced. This study examined few examples mainly to secure reliability on a maintenance quality in operating method and the features of train maintenance system based on travel distance.

Comprehensive Security and Crisis & Emergency Management for Protecting Critical Infrastructure

  • Lee, Jae-Enn
    • International Journal of Contents
    • /
    • v.5 no.3
    • /
    • pp.71-78
    • /
    • 2009
  • Recently, interest has heightened over 'critical infrastructures' and their reliability in the face of potential terrorist attack. Assault on any of the critical infrastructures as transportation, power, water, telecommunications, and financial services, entails great consequences for their users as well as the other interdependent critical infrastructures. How to protect our vital critical infrastructures is the key question in this paper. The purpose of this article is to suggest the implications for crisis and emergency management to protect the critical infrastructures in our society. For achieving the purpose, we examined the concept of comprehensive security, national crisis, and critical infrastructure and, using the holistic approach, we examined the comprehensive emergency management for suggesting the implications for establishing the critical infrastructure protection system; building up the high reliability organization, organizing and partnering, assessing the risk, preparing first responders, working with private owners of critical infrastructures, working with communities, improving the administrative capacity.

Research of Circuit Working Construction Elevator with Single-guide Rail and Multi-cages

  • Kun Zhang;Kaiqiang Wang;Di Li;Qing Sun;Zhen Ye;Wei Liu
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.137-144
    • /
    • 2022
  • As one of the most important vertical transportation equipment in super high-rise buildings, the construction elevator directly affects the project period, cost, and effectiveness. The paper proposes a new construction elevator with single-guide rail and multi-cages. It can solve the problems of single construction elevator capacity shortage and efficacy decrease with height reduction, the occupancy of plan and elevation position of multiple construction elevators, and extension of total construction period by cycling operation of multi-cages on a single-guide rail. The paper focuses on the design and research of the main components of the equipment, such as the rotating guide rail mechanism, vertical bearing mast tie system, segmented electrical power supply system, group control scheduling system, and safety anti-collision system.

Demand Estimation Methodology for a New Air Route (신규 항공노선에 대한 수요 예측 모델 연구)

  • Choi, Jong Haea;Yoo, Kwang Yui;Lee, Sang Yong
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.2
    • /
    • pp.145-158
    • /
    • 2015
  • A network connectivity has been regarded as a key element to strengthen a business competitive power in the aviation industry, so many airport authorities try to attract the new airlines and scheme out new air routes. With this trend, a study for an induced travel demand estimation methodology is needed. This study introduces a demand estimation method, especially for a new air route to a promising destination. With the results of previous studies, the derived demand is classified into four types - Local, Beyond, Behind and Bridge. The explanatory variables are established for each type of demand and the main independent variables are composed of distance, ratio of detour, and relative capacity compared with other airports. The equations using such variables and statistically significant coefficients are suggested as the model to make an estimation of derived demand for a new route. Therefore this study will be expected to take an initial step for all related parties to be involved more deeply into developing new air routes to enhance network connectivity.

KEPCO-China Huaneng Post-combustion CO2 Capture Pilot Test and Cost Evaluation

  • Lee, Ji Hyun;Kwak, NoSang;Niu, Hongwei;Wang, Jinyi;Wang, Shiqing;Shang, Hang;Gao, Shiwang
    • Korean Chemical Engineering Research
    • /
    • v.58 no.1
    • /
    • pp.150-162
    • /
    • 2020
  • The proprietary post-combustion CO2 solvent (KoSol) developed by the Korea Electric Power Research Institute (KEPRI) was applied at the Shanghai Shidongkou CO2 Capture Pilot Plant (China Huaneng CERI, capacity: 120,000 ton CO2/yr) of the China Huaneng Group (CHNG) for performance evaluation. The key results of the pilot test and data on the South Korean/Chinese electric power market were used to calculate the predicted cost of CO2 avoided upon deployment of CO2 capture technology in commercial-scale coal-fired power plants. Sensitivity analysis was performed for the key factors. It is estimated that, in the case of South Korea, the calculated cost of CO2 avoided for an 960 MW ultra-supercritical (USC) coal-fired power plant is approximately 35~44 USD/tCO2 (excluding CO2 transportation and storage costs). Conversely, applying the same technology to a 1,000 MW USC coal-fired power plant in Shanghai, China, results in a slightly lower cost (32~42 USD/tCO2). This study confirms the importance of international cooperation that takes into consideration the geographical locations and the performance of CO2 capture technology for the involved countries in the process of advancing the economic efficiency of large-scale CCS technology aimed to reduce greenhouse gases