• 제목/요약/키워드: Power system reliability evaluation

검색결과 353건 처리시간 0.042초

열간 금형재의 마찰용접 최적화와 AE평가 (Friction Welding Optimization of Hot Die Punch Materials and Its AE Evaluation)

  • 오세규;공유식;박일동;유인종
    • 동력기계공학회지
    • /
    • 제4권4호
    • /
    • pp.54-58
    • /
    • 2000
  • The complete joining method for dissimilar hot die punch materials and its real-time evaluation method are not available at present. Brazing method has been used for joining them, but it is known that the welded joint by the brazing has the lower bonding efficiency and reliability than the diffusion welding. The friction welding with a diffusion mechanism in bonding was applied in this study. So, this work was carried out to determine the optimal friction welding conditions and to analyze mechanical properties of friction welded joints of hot die punch materials (STD61 for the blade part of hot die punch) to alloy steel (SCM440 for the shank part of hot die punch) such as plunger. In addition, acoustic emission test was carried out during friction welding to evaluate the weld quality.

  • PDF

위험도 평가기준을 적용한 저수지 최적운영방안 연구(I) (대청댐을 중심으로) (A Study of Optimal Operation Policy using Risk Evaluation Criteria(I) (for the Daechung Multi-purpose Reservoir))

  • 박명기;김재한;정관수
    • 한국수자원학회논문집
    • /
    • 제35권1호
    • /
    • pp.37-49
    • /
    • 2002
  • 이수목적 수량관리를 위한 보장수량과 수력발전 등을 고려한 최적화 기법은 이상가뭄 또는 특이 수문년을 포함하는 경우에는 적용에 한계가 있다. 이러한 관점에서 Hashimoto 등(1982)에 의해 제안된 물부족에 관련된 3가지 평가기준을 혼합정수계획법을 통해 최적화모형에 반영하기 위한 Moy 등(1986)과 Srinivasan 등(1999)에 의해 제시된 바 있다. 그러나 이들 연구는 용수공급용 단일 저수지에 대해 한정되어 발전을 포함하는 다목적댐에 적용할 수 있는 정식화 연구는 부진한 실정이다. 본 연구에서는 다목적댐의 용수공급 및 수력발전 최적화 문제에 위험도 평가기준을 도입하여 운영평가를 위한 정식화 형태를 개선하였으며, 개선된 모형을 금강수계 대청다목적댐에 적용하여 그 실효성을 평가하였다.

Evaluation of effectiveness of fault-tolerant techniques in a digital instrumentation and control system with a fault injection experiment

  • Kim, Man Cheol;Seo, Jeongil;Jung, Wondea;Choi, Jong Gyun;Kang, Hyun Gook;Lee, Seung Jun
    • Nuclear Engineering and Technology
    • /
    • 제51권3호
    • /
    • pp.692-701
    • /
    • 2019
  • Recently, instrumentation and control (I&C) systems in nuclear power plants have undergone digitalization. Owing to the unique characteristics of digital I&C systems, the reliability analysis of digital systems has become an important element of probabilistic safety assessment (PSA). In a reliability analysis of digital systems, fault-tolerant techniques and their effectiveness must be considered. A fault injection experiment was performed on a safety-critical digital I&C system developed for nuclear power plants to evaluate the effectiveness of fault-tolerant techniques implemented in the target system. A software-implemented fault injection in which faults were injected into the memory area was used based on the assumption that all faults in the target system will be reflected in the faults in the memory. To reduce the number of required fault injection experiments, the memory assigned to the target software was analyzed. In addition, to observe the effect of the fault detection coverage of fault-tolerant techniques, a PSA model was developed. The analysis of the experimental result also can be used to identify weak points of fault-tolerant techniques for capability improvement of fault-tolerant techniques

파워디바이스 패키징의 열제어 기술과 연구 동향 (Overview on Thermal Management Technology for High Power Device Packaging)

  • 김광석;최돈현;정승부
    • 마이크로전자및패키징학회지
    • /
    • 제21권2호
    • /
    • pp.13-21
    • /
    • 2014
  • Technology for high power devices has made impressive progress in increasing the current density of power semiconductor, system module, and design optimization, which realize high power systems with heterogeneous functional integration. Depending on the performance development of high power semiconductor, packaging technology of high power device is urgently required for efficiency improvement of the device. Power device packaging must provide superior thermal management due to high operating temperature of power modules. Here we, therefore, review critical challenges of typical power electronics packaging today including core assembly processes, component materials, and reliability evaluation regulations.

산업용 수용가 종별 정전비용 평가 및 분석 (Evaluation and Analysis of Interruption Cost by Industrial Customer Type)

  • 최상봉;남기영;김대경;정성환;류희석;이재덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.435-436
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate power system reliability by using customer interruption costs. This paper presents an evaluation of interruption costs by industrial customer type in Korea using customer survey methodology. When various research results are examined, the customer damage survey methodology becomes much more generalized. Especially, in the case of industrial customers, it is known that the evaluation by customer damage survey is more useful. Accordingly, this paper selected the customer damage survey method to evaluate interruption costs by industrial customer type in Korea considering interruption and customer characteristics.

  • PDF

A Study on the Fuzzy ELDC of Composite Power System Based on Probabilistic and Fuzzy Set Theories

  • Park, Jaeseok;Kim, Hongsik;Seungpil Moon;Junmin Cha;Park, Daeseok;Roy Billinton
    • KIEE International Transactions on Power Engineering
    • /
    • 제2A권3호
    • /
    • pp.95-101
    • /
    • 2002
  • This paper illustrates a new fuzzy effective load model for probabilistic and fuzzy production cost simulation of the load point of the composite power system. A model for reliability evaluation of a transmission system using the fuzzy set theory is proposed for considering the flexibility or ambiguity of capacity limitation and overload of transmission lines, which are subjective matter characteristics. A conventional probabilistic approach was also used to model the uncertainties related to the objective matters for forced outage rates of generators and transmission lines in the new model. The methodology is formulated in order to consider the flexibility or ambiguity of load forecasting as well as capacity limitation and overload of transmission lines. It is expected that the Fuzzy CMELDC (CoMposite power system Effective Load Duration Curve) proposed in this study will provide some solutions to many problems based on nodal and decentralized operation and control of an electric power systems in a competitive environment in the future. The characteristics of this new model are illustrated by some case studies of a very simple test system.

154 kV 건식형 지중종단접속함의 성능 평가 (Performance Evaluation of 154 kV Separable Dry Type Plug-in Connector)

  • 김석수;박영창;오창수
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2007년도 추계학술대회 논문집
    • /
    • pp.470-471
    • /
    • 2007
  • Underground connectors in 154kV for the connection between power cables and power equipments represent a greater part of power system stability and reliability. This paper presents the performance evaluation of 154kV separable dry type plug-in connector of a company in Japan for transformers and Gas Insulated Switchgear. And the possibility of the application on domestic underground line was considered.

  • PDF

초음파 적외선열화상 기법을 적용한 모터 코어의 신뢰성 평가 (Reliability Evaluation of a Motor Core Applied Ultrasound Infrared Thermography Technique)

  • 정윤수;노치성;이경일;김재열
    • 한국기계가공학회지
    • /
    • 제15권4호
    • /
    • pp.60-66
    • /
    • 2016
  • This study used an ultrasound infrared thermography technique to detect issues in the motor core of typical power equipment. The current defect inspection method of the motor core is often incomplete (due to the limits of visual inspection) and thus the reliability of the motor core is reduced. Therefore, in this study, experiments were carried out to increase the reliability of the test by using an ultrasonic infrared thermal non-destructive inspection method to image the motor core. The ambient temperature of the experimental system was maintained at $25^{\circ}C$. Experiments were carried out to examine a damaged motor core and a defect-free motor core. Experimental results confirm the technique clearly detected defects in the motor core, thereby confirming the possibility of using this technique in the field.

축방향 관통균열이 존재하는 증기발생기 세관의 파손확률 예측 (Failure Probability Estimation of Steam Generator Tube Containing Axial Through-Wall Crack)

  • 문성인;이상민;배성렬;장윤석;황성식;김정수;김영진
    • 한국정밀공학회지
    • /
    • 제22권10호
    • /
    • pp.137-143
    • /
    • 2005
  • The integrity of steam generator tubes in nuclear power plant should be maintained sufficiently during operation. For sake of this, complicated assessment procedures are required such as fracture mechanics analysis, etc. The integrity assessment of tubes has been performed by using conventional deterministic approaches while there are many uncertainties to carry out a rational evaluation. In this respect, probabilistic integrity assessment is considered as an alternative method for integrity assessment. The objectives of this study are to develop an integrity assessment system based on probabilistic fracture mechanics and to predict the failure probability of steam generator tubes containing an axial through-wall crack. The developed integrity assessment system consists of three evaluation modules, which apply first order reliability method, second order reliability method and Monte Carlo simulation method, respectively. The system has been applied to predict failure probability of steam generator tubes and the estimation results showed a promising applicability of the probabilistic integrity assessment system.

최고시험속도 400km/h 동력분산형 고속철도의 종합계측시스템 구성 방안 연구 (A Study of Overall Measurement System for the Power dispersed High Speed Railway with 400km/h of Maximum Test Speed)

  • 이영엽;류상현;김봉래;이준원
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1785-1790
    • /
    • 2010
  • This study examined the overall measurement system for the power dispersed high speed railway with 400km/h of maximum test speed. The measuring system evaluating an efficiency, stability and reliability is important for developing the high speed railway. In order to organize the comprehensive measuring system, it is needed to determined the test item, a number of channel and the specifications of the measurement system. In this study, we made lists for the performance evaluation tests of the next generation high speed railway expected to be developed in the future, and prepared generalization channel sheets for the specification of the overall measurement system. In addition, the specifications for the measuring system were discussed and synthesized.

  • PDF