• Title/Summary/Keyword: Power system reliability evaluation

Search Result 353, Processing Time 0.028 seconds

Comprehensive Evaluation of Impacts of Connecting Distributed Generation to the Distribution Network

  • Jin, Wei;Shi, Xuemei;Ge, Fei;Zhang, Wei;Wu, Hongbin;Zhong, Chengyuan
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.621-631
    • /
    • 2017
  • In this paper, we study the various impacts of connecting distributed generation (DG) to the distribution network. The comprehensive evaluation index system (CEIS) of four hierarchies is established, considering economy, reliability and voltage quality, and the calculation methods of different indexes are presented. This paper puts forward an improved triangular fuzzy number analytic hierarchy process (ITFNAHP) to weight the second level indexes (SLI) and the third level indexes (TLI), and calculates the variation coefficient to weight the fourth level indexes (FLI). We calculate the comprehensive weight coefficients based on the weight coefficients of the SLI, TLI and FLI, and then calculate the comprehensive evaluation of satisfaction (CES) of different access schemes. On the basis of the IEEE 33-bus example system, simulations of the calculation methods and the comprehensive evaluation method are carried out under different DG access schemes according to the same total investment cost and the same permeability, respectively, and the simulation results are analyzed and discussed.

A study on the reliability and life of hypoid gear axle (하이포이드 기어 액슬의 신뢰성 및 수명에 관한 연구)

  • Han, S.Y.;Kim, H.S.;Kang, H.Y.;Yang, S.M.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.13 no.3
    • /
    • pp.123-131
    • /
    • 1996
  • This paper presents the development of an algorithm for the reliability and life of a hypoid gear axle system (located in the last section of power train) in heavy vehicles. The algorithm is developed about expecting the reliability and service-life for applied loads on each component in the system using the Weibull's probabilistic distribution and the extended Palmgren's model. The probabilistic method is used to results. Also this model is involved in predicting the failure which is related to the number of load cycles with the approaching load. Then the precious evaluation of the reliability and life in the axle system can be effectively carried out. Thus the general procedures of a reliability and life design, including the mathematical formulation and numerical examples, are illustrated for a hypoid gear axle system.

  • PDF

Development of Reliability Measurement Method and Tool for Nuclear Power Plant Safety Software (원자력 안전 소프트웨어 대상 신뢰도 측정 방법 및 도구 개발)

  • Lingjun Liu;Wooyoung Choi;Eunkyoung Jee;Duksan Ryu
    • The Transactions of the Korea Information Processing Society
    • /
    • v.13 no.5
    • /
    • pp.227-235
    • /
    • 2024
  • Since nuclear power plants (NPPs) increasingly employ digital I&C systems, reliability evaluation for NPP software has become crucial for NPP probabilistic risk assessment. Several methods for estimating software reliability have been proposed, but there is no available tool support for those methods. To support NPP software manufacturers, we propose a reliability measurement tool for NPP software. We designed our tool to provide reliability estimation depending on available qualitative and quantitative information that users can offer. We applied the proposed tool to an industrial reactor protection system to evaluate the functionality of this tool. This tool can considerably facilitate the reliability assessment of NPP software.

Probabilistic Reliability Analysis of Ultrasonic Inspection System about Sizing Performance of Defects in Piping on Nuclear Power Plant (원전 배관 결함의 크기측정성능에 대한 초음파 검사시스템의 확률론적 신뢰도 평가)

  • 김현묵;정지홍;지용우;장경영;박익근;박윤원
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2002.06a
    • /
    • pp.217-224
    • /
    • 2002
  • The performance demonstration round robin test was conducted to quantify the capability of ultrasonic inspection for in-service and to address some aspects of reliability for nondestructive evaluation. The fifteen inspection teams who employed procedures that met or exceeded ASME Sec. XI code requirements detected the piping of nuclear power plant with various cracks to evaluate the capability of detection. With data from PD-RR test, the performance of ultrasonic nondestructive inspection could be assessed using probability of length and depth sizing of cracks.

  • PDF

Reliability Evaluation of a Capacitated Two-Terminal Network (내용을 고려한 무방향 네트워크의 신뢰도 계산)

  • 최명호;윤덕균
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.20
    • /
    • pp.47-53
    • /
    • 1989
  • This paper presents an algorithm CAPFACT to evaluate the reliability of a capacitated two terminal network such as a communication network, a power distribution network, and a pipeline network. The network is good(working) if and only if it is possible to transmit successfully the required system capacity from one specified terminal to the other. This paper defines new Capacitated series-parallel reduction to be applied to a series-parallel structure of the network. New Capacitated factoring method is applied to a non-series-parallel structure. The method is based on the factoring theorem given by Agrawal and Barlow. According to the existing studies on the reliability evaluation of the network that the capacity is not considered, the factoring method using reduction is efficient. The CAPFACT is more efficient than Aggarwal algorithm which enumerated and combined the paths. The efficiency is proved by the result of testing the number of operations and cpu time on FORTRAN compiler of VAX-11/780 at Hanyang University.

  • PDF

Development of Black Box for EV Charging Infra based on Solar Power Generation and ESS (태양광발전 및 ESS 기반 전기차 충전인프라용 블랙박스 개발)

  • Kim, Dong-Wan;Park, Ji-Ho;An, Young-Joo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.160-167
    • /
    • 2018
  • In this paper, a black box, which is provided the reliability and user safety of home battery energy storage system connected with solar energy generation, is developed. In the developed scheme, a status and diagnosis data of battery management system, power conditioning system, solar energy generation and grid is measured. This status and diagnosis data is stored and displayed in the developed black box. In addition, this status and diagnosis data is stored and displayed in a monitoring system and a smart phone of user. A performance evaluation of the developed black box is carried out using emulator of home battery energy storage system connected with solar energy generation. Consequently, the developed black box is proved its superiority of the reliability and user safety.

Development and Reliability Optimization of Economic Analysis Module for Power Generation System from Industrial Waste Heat Recovery (산업폐열 발전시스템 경제성분석 모듈 개발 및 신뢰성 최적화)

  • Ko, Areum;Park, Sungho;Kim, Joon-Young;Cha, Jae-Min
    • Journal of Energy Engineering
    • /
    • v.27 no.4
    • /
    • pp.50-63
    • /
    • 2018
  • The issue of global warming and environmental pollutant has become an international concern due to the widespread use of fossil fuels, and thus waste heat recovery technologies has become important to improve energy utilization. The global market of power generation system using industrial waste heat is rapidly growing at an average rate of 5% due to its advantage of increasing energy efficiency. In order to design an optimal waste heat recovery system, it is necessary to develop a program that offers economic evaluation of each power generating technology according to the heat source conditions. In this paper, the economic analysis module to calculate LCOE is developed and verified the reliability against NETL economic analysis results. As a result of the verification, the error rate is about 6 ~ 7%, which satisfy the accuracy for business feasibility evaluation. In order to enhance the reliability, the module was improved by applying the levelization method used by NETL. As a result of the verification of reliability, the error rate is less than 1% and the accuracy is improved.

Evaluation of Reliability Worth Considering Sustained Interruptions and Voltage Sags (영구정전과 순간전압강하를 고려한 신뢰도 비용 평가)

  • Lee, Hee-Tae;Moon, Jong-Fil;Seol, Kyu-Hwan;Yun, Sang-Yun;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.5
    • /
    • pp.13-20
    • /
    • 2008
  • Power quality problems such as momentary interruptions and voltage sags do not great influence on loads at past. However, the interests in power quality problems increase as the use of sensitive loads with microprocessor like computers increases recently. Accordingly, power system reliability research focusing to sustained interruption and momentary interruption partially needs more accurate evaluation methods including momentary and instantaneous problems. That is, many sensitive loads being tripped by voltage sags result in interruption costs. In this paper, new reliability worth evaluation method is presented considering voltage sags. We calculated the magnitude of voltage sags using fault studies and the duration of voltage sags using the trip time of protective relays for each fault. Moreover, we includes the customer interruption cost resulted from sensitive load trip by voltage sags. Through case studies, we evaluate the effects of voltage sags for permanent faults.

Dependence assessment in human reliability analysis under uncertain and dynamic situations

  • Gao, Xianghao;Su, Xiaoyan;Qian, Hong;Pan, Xiaolei
    • Nuclear Engineering and Technology
    • /
    • v.54 no.3
    • /
    • pp.948-958
    • /
    • 2022
  • Since reliability and security of man-machine system increasingly depend on reliability of human, human reliability analysis (HRA) has attracted a lot of attention in many fields especially in nuclear engineering. Dependence assessment among human tasks is a important part in HRA which contributes to an appropriate evaluation result. Most of methods in HRA are based on experts' opinions which are subjective and uncertain. Also, the dependence influencing factors are usually considered to be constant, which is unrealistic. In this paper, a new model based on Dempster-Shafer evidence theory (DSET) and fuzzy number is proposed to handle the dependence between two tasks in HRA under uncertain and dynamic situations. First, the dependence influencing factors are identified and the judgments on the factors are represented as basic belief assignments (BBAs). Second, the BBAs of the factors that varying with time are reconstructed based on the correction BBA derived from time value. Then, BBAs of all factors are combined to gain the fused BBA. Finally, conditional human error probability (CHEP) is derived based on the fused BBA. The proposed method can deal with uncertainties in the judgments and dynamics of the dependence influencing factors. A case study is illustrated to show the effectiveness and the flexibility of the proposed method.

A Study on Decision of Optimum Installed Reserve Rate using Probabilistic Reliability Criterion (확률론적인 신뢰도기준에 의한 적정설비예비율의 결정에 관한 연구)

  • Park, Jeong-Jae;Choi, Jae-Seok;Yun, Yong-Bum;Jung, Young-Bum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1318-1326
    • /
    • 2008
  • This paper proposes an alternative methodology for deciding an optimum deterministic reliability level (IRR; Installed Reserve Rate) by using probabilistic reliability criterion (LOLE; Loss of Load Expectation). Additionally, case studies using the proposed method induce the characteristics of relationship between the probabilistic reliability index (LOLE) and deterministic reliability index (IRR) for 2008 and 2010 years in Korea power system. The case study presents a possibility that an optimum IRR level in Korea can be assessed using the proposed method. Korea power system has been using the LOLE criterion to determine the adequacy of installed capacity (ICAP) requirement. The criterion in Korea is that the loss of load expectation shall not exceed the available capacity more than five day in ten years (=0.5[days/year]), The probabilistic reliability evaluation and production cost simulation program which is called PRASim is used in order to evaluate the relationship and optimum IRR in this paper.