• Title/Summary/Keyword: Power system operation

Search Result 5,485, Processing Time 0.031 seconds

Fuzzy Inference System Based Distance Relay Algorithm Development for Protecting an Underground Power Cable Systems (퍼지추론시스템 기반 지중송전계통 보호용 거리계전 알고리즘 개발)

  • Jung, Chae-Kyun;Oh, Sung-Kwun;Park, Keon-Jun;Lee, Jae-Kyu;Lee, Jong-Beom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.2
    • /
    • pp.172-178
    • /
    • 2008
  • If the fault occurs on the underground power cable systems, the fault current on the sheath has an influence on all sections of cable because it's returned through earth at the directly grounded point and operation point of SVL(Sheath Voltage Limiter) on each insulated joint box. Therefore, the earth resistance and the operation of SVL have an effect on the zero-sequence current, and then the impedance between relaying point and fault point is increased. That causes the overreach of distance relay. For these reasons, the distance relay algorithm for protecting an underground power cable systems hasn't been developed till now. In this paper, new distance relay algorithm is developed for protecting a underground power cable system using fuzzy inference system which is the one of ACI(Advanced Computational Intelligence) techniques. This algorithm is verified by EMTP simulation of real power cable system, and proves to effectively advance the errors

An Operation Status Analysis of Library Building using BEMS Data; Energy Performance Evaluation on Initial Stage of Completion (BEMS 데이터를 활용한 도서관 건물의 운전현황 분석 -준공 초기단계의 건물 에너지 성능 평가)

  • Park, Seong-cheol;Ha, Ju-wan;Kim, Hwan-yong;Song, Young-hak
    • Journal of Korean Institute of Architectural Sustainable Environment and Building Systems
    • /
    • v.12 no.6
    • /
    • pp.669-679
    • /
    • 2018
  • Energy consumption savings in buildings should be reviewed in diverse areas such as air conditioning system and lighting responsible for cooling and heating, and energy management systems such as BAS (Building Automation System) and BEMS (Building Energy Management System) are introduced to improve energy consumption efficiency and to promote economic control of related facilities by integrated management of energy generated and consumption in buildings. The measured building of this study uses regenerative geothermal system. Measured values of heat pump and system COP were 4.7 and 4.2 respectively, and they were found to be higher 11.9% and 23.5% than rated values. As a result of analyzing the air conditioning and lighting energy from the first floor to the fourth floor performing the air conditioning, the second and third floors, which have a high frequency of use, are compared with the first and fourth floors 50% higher energy consumption ratio. On the other hand, the general heat storage system uses the nighttime power of the previous day to store heat and use it the next day. The total number of days of abnormal operation during the summer season is 61 days. The electricity cost corresponding to the abnormal operation is 1,840,641 KRW, and the normal operation using the nighttime power is 1,363,561 KRW, which is difference of 477,080 KRW, 35% increase in cost. We will utilize it as the main data of BEMS through analysis of winter operation characteristics as well as summer operation characteristics.

Investigation of the Voltage Collapse Mechanism in Three-Phase PWM Rectifiers

  • Ren, Chunguang;Li, Huipeng;Yang, Yu;Han, Xiaoqing;Wang, Peng
    • Journal of Power Electronics
    • /
    • v.17 no.5
    • /
    • pp.1268-1277
    • /
    • 2017
  • Three-phase pulse width modulation (PWM) rectifiers are usually designed under the assumption of ideal ac power supply and input inductance. However, non-ideal circuit parameters may lead to a voltage collapse of PWM rectifiers. This paper investigates the mechanism of voltage collapse in three-phase PWM rectifiers. An analytical stability boundary expression is derived by analyzing the equilibrium point of the averaging state space model, which can not only accurately locate the voltage collapse boundary in the circuit parameter domain, but also reveal the essential characteristic of the voltage collapse. Results are obtained and compared with those of the trial-error method and the Jacobian method. Based on the analysis results, the system parameters can be divided into two categories. One of these categories affects the critical point, and other affects only the instability process. Furthermore, an effective control strategy is proposed to prevent a vulnerable system from being driven into the instability region. The analysis results are verified by the experiments.

Implementation and Control of AC-DC-AC Power Converter in a Grid-Connected Variable Speed Wind Turbine System with Synchronous Generator (동기기를 사용한 계통연계형 가변속 풍력발전 시스템의 AC-DC-AC 컨버터 구현 및 제어)

  • Song Seung-Ho;Kim Sung-Ju;Hahm Nyon-Kun
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.54 no.12
    • /
    • pp.609-615
    • /
    • 2005
  • A 30kW electrical power conversion system is developed for a variable speed wind turbine. In the wind energy conversion system(WECS) a synchronous generator with field current excitation converts the mechanical energy into electrical energy. As the voltage and the frequency of the generator output vary according to the wind speed, a 6-bridge diode rectifier and a PWM boost chopper is utilized as an ac-dc converter maintaining the constant dc-link voltage with only single switch control. An input current control algorithm for maximum power generation during the variable speed operation is proposed without any usage of speed sensor. Grid connection type PWM inverter converts dc input power to ac output currents into the grid. The active power to the grid is controlled by q-axis current and the reactive power is controlled by d-axis current with appropriate decoupling. The phase angle of utility voltage is detected using software PLL(Phased Locked Loop) in d-q synchronous reference frame. Experimental results from the test of 30kW prototype wind turbine system show that the generator power can be controlled effectively during the variable speed operation without any speed sensor.

A Study on the Generator Capability Curve (발전기(發電機)의 가능출력곡선(可能出力曲線)에 관한 연구(硏究))

  • Park, Seong-Jin;Nam, Si-Bok
    • Proceedings of the KIEE Conference
    • /
    • 1999.11a
    • /
    • pp.35-42
    • /
    • 1999
  • As our power system has changed the past undeveloped model causing the lacked supply of power to the civilized model that the remained one makes the voltage and the frequency rise at the middle of the night, the leading power factor operation of generators, that is, the under-exited operation is essentially to be needed, so, at a viewpoint of the stability of the power system, it is a very important factor. In this investigation. the equation of curves for each area on the capability curve has been studied at the above-mentioned viewpoint. Also, each capability curve for the operating power stations (Nuclear P/S, Thermal P/S, Hydrolic & pumping-up P/S Gas turbine P/S) has, been presented, and studied whether the leading power factor operational area is able to be expanded or not.

  • PDF

Operation Analysis of UPQC(Unified Power Quality Conditioner) based on H-bridge Modules (H-브리지 모듈로 구성된 UPQC(Unified Power Quality Conditioner)의 동작 분석)

  • Lee Bum-Kyoo;Bae Byung-Yeol;Baek Seung-Tak;Han Byung-Moon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.1
    • /
    • pp.1-7
    • /
    • 2005
  • This paper proposes a novel UPQC(unified power quality conditioner) based on H-bridge modules, isolated through single-phase multi-winding transformers. The dynamic performance of proposed system was analyzed by simulation with PSCAD/EMTDC, assuming that the UPQC is connected with the 22.9kV distribution line. The proposed system can be directly connected to the transmission line without series injection transformers. It has flexibility in expanding the operation voltage by increasing the number of H-bridge modules and can compensate reactive power, harmonics, voltage sag and swell, voltage unbalance. The proposing UPQC has the ultimate capability of improving power quality at the point of installation on power distribution systems.

Experimental Waveforms of Single-Pulse Soft-Switching PFC Converter

  • Katsunori Taniguchi;Koh, Kang-Hoon;Lee, Hyun-Woo
    • Journal of Power Electronics
    • /
    • v.4 no.1
    • /
    • pp.56-63
    • /
    • 2004
  • A new driving circuit for the SPSS (Single-Pulse Soft-Switching) PFC converter is proposed. The switching device of a SPSS converter switches once in every half cycle of an AC commercial power source. Therefore, it can be solved many problems caused by the high frequency operation. The proposed SPSS converter achieves the soft-switching operation and the EMI noise can be reduced. The resonant capacitor voltage supplies to the resonant inductor even if the input AC voltage is the vicinity of zero cross voltage. Then, the power factor and input current waveform can be improved without delay time. A new driving circuit achieves the operation of SPSS converter by one switching drive circuit. The proposed converter can be satisfied the IEC standard sufficiently

A Study on the 0.5$\mu\textrm{m}$ Dual Gate High Voltage Process for Multi Operation Applications (Multi Operation을 위한 0.5$\mu\textrm{m}$Dual Gate 고전압 공정에 관한 연구)

  • 송한정;김진수;곽계달
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2000.11a
    • /
    • pp.463-466
    • /
    • 2000
  • According to the development of the semiconductor micro device technology, IC chip trends the high integrated, low power tendency. Nowadays, it can be showed the tendency of single chip in system level. But in the system level, IC operates by multi power supply voltages. So, semiconductor process is necessary for these multi power operation. Therefore, in this paper, dual gate high voltage device that operate by multi power supply of 5V and 20V fabricated in the 0.5${\mu}{\textrm}{m}$ CMOS process technology and its electrical characteristics were analyzed. The result showed that the characteristics of the 5V device almost met with the SPICE simulation, the SPICE parameters are the same as the single 5V device process. And the characteristics of 20V device showed that gate length 3um device was available without degradation. Its current was 520uA/um, 350uA/um for NMOS, PMOS and the breakdown voltages were 25V, 28V.

  • PDF

A Study on the Abnormal and Fault Reproduction Method for Smart Monitoring of Thrust Bearing in Wave Power Generation System (파력발전 시스템 쓰러스트 베어링의 스마트 모니터링을 위한 이상 및 고장 운용 재현 방법에 관한 연구)

  • Oh, Jaewon;Min, Cheonhong;Sung, Kiyoung;Kang, Kwangu;Noh, Hyon-Jeong;Kim, Taewook;Cho, Sugil
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.835-842
    • /
    • 2020
  • This paper considers a method of reproducing abnormal and fault operation for smart monitoring of thrust bearing used in wave power generation system. In order to develop smart monitoring technology, abnormal and failure data of actual equipment are required. However, it is impossible to artificially break down the actual equipment in operation due to safety and cost. To tackle this problem, a test bed that can secure data through reproduction of a faulty operating environment should be developed. Therefore, in this study, test bed that can reproduce each situation was developed and the operation result was analysis after identifying the situation to be reproduced through the failure factor analysis of the thrust bearing.

A Study on the Improvement of Subsidy Program for CHP Plant Connected with Capital Region District Heating System (수도권 지역난방연계 열병합발전소의 기반기금 지원과 개선방안)

  • 김창수;이창호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.2
    • /
    • pp.97-103
    • /
    • 2004
  • CHP system supplies electricity and heating together with high efficiency. Current utility's CHP system uses electric power by itself and sells thermal energy to KDHC(Korea District Heating Corporation). CHP's operation cost except sales revenue of heating was covered by the sale revenue of electricity. Thus Electric generation cost in district Heating CHP system has close relationship with the level of heating price. However, after the restructuring of electricity industry, the operation cost could not be covered by sales revenue of heating and electricity. This loss was compensated by energy subsidy program in the electric power industry infrastructure fund. This paper suggests reasonable evaluation and improvement methods of the loss calculation of CHP system utilizing the infrastructure fund efficiency In terms of the direction of support by the fund, it provides the methods to prevent inefficient operation through setting up the upper limit of subsidy and to improve the loss calculation. Moreover, it suggest fixed rate support by heating supply level and reducing subsidy gradually for an efficient operation of CHP system.