• Title/Summary/Keyword: Power plant scale

Search Result 383, Processing Time 0.025 seconds

A Comparative Case Study of 2016 Gyeongju and 2011 Virginia Earthquakes (2016년 경주지진과 2011년 미국 버지니아지진에 대한 비교 연구 및 사례 분석)

  • Kang, Thomas H.K.;Jeong, Seung Yong;Kim, Sanghee;Hong, Seongwon;Choi, Byong Jeon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.20 no.7_spc
    • /
    • pp.443-451
    • /
    • 2016
  • A Gyeongju earthquake in the magnitude of 5.8 on the Richter scale (the moment magnitude of 5.4), which was recorded as the strongest earthquake in Korea, occurred in September 12, 2016. Compared with the 2011 Virginia earthquake, the moment magnitude was slightly smaller and its duration was 3 seconds, much shorter than 10 seconds of the Virginia earthquake, resulting in relatively minor damage. But the two earthquakes are quite similar in terms of the overall scale, unexpectedness, and social situation. The North Anna Nuclear Power Plant, which is a nuclear power plant located at 18 km away from the epicenter of the Virginia earthquake, had no damage to nuclear reactors because the reactors were automatically shut down as the design basis earthquake value was exceeded. Ground accelerations of the 2016 Gyeongju earthquake did not exceed the threshold value but the manual shutdown was carried out so that Wolsong Nuclear Power Site was not damaged. Damaged historic homestead house and masonry structures due to the Virginia earthquake have been repaired, reinforced, and rebuilt based on a long-term earthquake recovery project. Likewise, it will be necessary to carefully carry out an earthquake recovery planning program to improve overall seismic performance and to reconstruct the historic buildings and structures damaged as a result of the Gyeongju earthquake.

Modeling and Evaluation on the Dispersion of Air Pollutants in the Large Scale Thermal Power Plant (대단위발전소의 대기오염물질 확산에 관한 모델링 및 평가에 관한 연구)

  • Chun, Sang-Ki;Lee, Sung-Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.81-92
    • /
    • 1997
  • This paper presents the results from the comparison analysis and evaluation between the air pollutant dispersion modeling results and the observation data in the area within a 10 km radius from the Boryong thermal power plants. The observation data used in this study were the air pollutant concentrations which had been continuously measured from 8 locations around the Boryong power plants by TMS(tele-monitoring system) for 3 months from September to November, 1996. The short-term and long-term predictions were carried out using ISC3 model and LPDM(Lagrangian Panicle Dispersion Model). The results of ISC3 modeling in a short-term showed highly as 0.7 in a correlation coefficient, but in a long-term showed just 0.54. On the other hand, LPDM showed 0.78 in a correlation coefficient for a long-term, but in a short-term showed highly value than the observation concentrations.

  • PDF

Imperfect Competition and Productivity: Korean Fossil-fueled Power Generation Sector (발전부문의 불완전경쟁과 생산성 변화)

  • Kwon, Oh-Sang;Park, Hojeong
    • Environmental and Resource Economics Review
    • /
    • v.19 no.1
    • /
    • pp.3-21
    • /
    • 2010
  • By the significant structural change in 1999, a partial privatization has occurred in Korean fossil-fuel power generation sector. Under the current price scheme wholesale electricity price is dependent on output size, and hence, may not satisfy the assumption of price-taking producers. The purpose of our study is constructing the productivity change measurements of Korean power generation sector taking into account possibly imperfect competition and variable returns to scale. Our approach based on Harrison (1994) and Levinsohn (1993) derives the plant-level productivity measurements of the period between 2001 and 2007, as well as the measurements of mark-ups and returns to scale. It is shown that the mark-up size is dependent on the plants' fuel type and is decreasing over time. Allowing for imperfect competition and variable returns to scale adjusts the productivity measurements substantially.

  • PDF

The Selection of Human factors Evaluation Criteria for Information Display on VDT using AHP (AHP를 이용한 개량형 정보 표시 평가 항목의 중요도 선정에 관한 연구)

  • 차우창;장성필
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.1
    • /
    • pp.109-120
    • /
    • 2004
  • In large scale complex system such as a nuclear power plant, it is important to select guidelines and/or checklist to evaluate the system performance, especially human performance for visual information while the number of evaluation items of the guidelines and checklist is voluminous. This paper presents the methodology and experiment for the relative weights or priority selection of evaluation items on the advanced information display of main control room in a nuclear power plant. To summarize this, 1) many human factors guidelines of Visual Display Terminal(VDT) displays are collected, 2) the collected guidelines are integrated and unified based on some rules in a way to avoid confusion or errors about work performances of operator groups, 3) using the unified guidelines, the more important items are defined when the advanced information indexes are applied by using the Analytic Hierarchy Process(AHP). For employing the AHP, the decisions and response of many human factors evaluation specialists in this field are collected to get the priority order of the evaluation items of VDT. The result of this paper will be applied for the evaluation of the usability of next generation of nuclear power plant which is focused on the visual information display on VDT.

KEPCO-China Huaneng Post-combustion CO2 Capture Pilot Test and Cost Evaluation

  • Lee, Ji Hyun;Kwak, NoSang;Niu, Hongwei;Wang, Jinyi;Wang, Shiqing;Shang, Hang;Gao, Shiwang
    • Korean Chemical Engineering Research
    • /
    • v.58 no.1
    • /
    • pp.150-162
    • /
    • 2020
  • The proprietary post-combustion CO2 solvent (KoSol) developed by the Korea Electric Power Research Institute (KEPRI) was applied at the Shanghai Shidongkou CO2 Capture Pilot Plant (China Huaneng CERI, capacity: 120,000 ton CO2/yr) of the China Huaneng Group (CHNG) for performance evaluation. The key results of the pilot test and data on the South Korean/Chinese electric power market were used to calculate the predicted cost of CO2 avoided upon deployment of CO2 capture technology in commercial-scale coal-fired power plants. Sensitivity analysis was performed for the key factors. It is estimated that, in the case of South Korea, the calculated cost of CO2 avoided for an 960 MW ultra-supercritical (USC) coal-fired power plant is approximately 35~44 USD/tCO2 (excluding CO2 transportation and storage costs). Conversely, applying the same technology to a 1,000 MW USC coal-fired power plant in Shanghai, China, results in a slightly lower cost (32~42 USD/tCO2). This study confirms the importance of international cooperation that takes into consideration the geographical locations and the performance of CO2 capture technology for the involved countries in the process of advancing the economic efficiency of large-scale CCS technology aimed to reduce greenhouse gases

Seismic isolation of nuclear power plant based on layered periodic foundation

  • Mi Zhao;Qun Chen;Junqi Zhang;Xiuli Du
    • Earthquakes and Structures
    • /
    • v.24 no.4
    • /
    • pp.259-274
    • /
    • 2023
  • In this paper, mechanical properties of periodic foundation made of concrete and rubber are investigated by a parametric study using the finite element method (FEM). Periodic foundation is a special type of seismic isolation foundation used in civil engineering, which is inspired by the meso-scale structure of phononic crystals in solid-state physics. This type of foundation is capable of reducing the seismic wave propagating though the foundation, therefore providing additional protection for the structures. In the FEM analysis, layered periodic foundation is frequently modelled due to its simplicity in numerical modeling. However, the isolation effect of periodic foundation on nuclear power plant has not been fully discussed to the best knowledge of authors. In this work, we construct four numerical models of nuclear power plant with different foundations to investigate the seismic isolation effects of periodic foundations. The results show that the layered periodic foundation can increase the natural period of the nuclear power plant like traditional base isolation systems, which is beneficial to the structures. In addition, the seismic response of the nuclear power plant can also be effectively reduced in both vertical and horizontal directions when the frequencies of the incident waves fall into some specific frequency bandgaps of the periodic foundation. Furthermore, it is demonstrated that the layered periodic foundation can reduce the amplitude of the floor response spectrum, which plays an important role in the protection of the equipment.

CO2 dry-ice cleaning for the removal of air preheater plugging in coal-fired power plant. (석탄 화력발전소의 공기예열기 막힘 제거를 위한 CO2 드라이아이스 세정)

  • Ju, Saerom;Kim, Gyeong-Min;Kim, Do-Jung;Kim, Dong-Won
    • Proceedings of the Korean Institute of Surface Engineering Conference
    • /
    • 2014.11a
    • /
    • pp.204-206
    • /
    • 2014
  • 석탄 화력발전소에는 연소가스의 질소산화물(NOx) 저감을 위한 SCR(selective catalytic reduction)설비가 운전되고 있으며, SCR은 환원제인 암모니아($NH_3$)를 이용하여 연소가스 내에 질소산화물을 물과 질소로 분해하는 역할을 한다. 그러나, 연소가스 중의 일부 삼산화황($SO_3$)과 미반응 암모니아가 결합하여 황산암모늄염(Ammonium bisulfate; $NH_4HSO_4$)을 생성하며, 이는 후단 APH(air preheater)의 열소자에 점착된 후 분진들과 함께 성장하여 막힘을 야기한다. 막힘이 발생된 APH는 연소가스의 흐름을 방해하기 때문에 차압을 증가시키며, 이는 발전효율의 감소뿐만 아니라 급전정지를 초래한다. 이를 해결하기 위하여 $CO_2$ 드라이아이스 세정 방법을 적용하였으며, pilot-scale plant에서 실험을 수행하였다. 또한, 드라이아이스 공정변수인 분사압력과 분사시간을 제어하여 pilot-scale plant의 APH 열소자 표면에 생성되어있는 오염물질들의 제거효율을 관찰한 결과 95 %의 높은 제거효율을 보였다.

  • PDF

A study on the development of a virtual power plant platform for the Efficient operation of small distributed resources (소규모 분산자원의 효율적 운용을 위한 가상발전소 플랫폼 개발)

  • Kim, Hee-Chul;Hong, Ho-Pyo
    • Journal of Digital Convergence
    • /
    • v.19 no.11
    • /
    • pp.365-371
    • /
    • 2021
  • In this study, The Virtual Power Plant (VPP) solution platform considered in this study minimizes the cost and investment risk associated with the construction of power generation and transmission facilities. In addition, it includes a Demand Response (DR) program operation function to meet consumers' electricity demand. With the introduction of VPP, it is possible to provide more eco-friendly and efficient power by responding to changes in consumer load in real time through existing generators and DR programs without large-scale facility investment in power generation and transmission/distribution sectors. In order to link the communication device to the solar power and ESS linkage device, it is necessary to transmit data in the control/state between the device device and the edge system and develop an IoT device and interworking platform (OneM2M).