• Title/Summary/Keyword: Power load

Search Result 7,496, Processing Time 0.038 seconds

Link Voltage Adjustment Converter Employing Load Power Estimator for Notebook Computer Adaptor

  • Choi, Seong-Wook;Lee, Byoung-Hee;Lee, Keun-Wook;Ryu, Byoung-Woo;Moon, Gun-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2008.06a
    • /
    • pp.348-350
    • /
    • 2008
  • A link voltage adjustment converter employing load power estimator for notebook computer adaptor is proposed. It is consisted of the boost converter as a power factor correction stage and the LLC resonant converter as a DC/DC conversion stage with a newly introduced link voltage adjustment method employing load power estimator, which helps to reduce the transformer size and peak of output voltage ripple, maintaining high efficiency over all the load condition. Experimental results with 85W converter are given to verify the validity of the proposed circuit.

  • PDF

Zero Power Levitation Control of Hybrid Electro-Magnetic Levitation System by Load Observer (부하 상태관측기에 의한 하이브리드 부상 시스템의 제로 파워 부상 제어)

  • Kim, Youn-Hyun;Lee, Ju
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.50 no.6
    • /
    • pp.282-289
    • /
    • 2001
  • This paper introduces the scheme that improve the control performance of electromagnetic levitation system with zero power controller. Magnetic levitation is used widely, but the electromagnetic force has nonlinear characteristics because it is proportioned to a square of the magnetic flux density and it is in inverse proportion to a square of the airgap. So, it is complicate and difficult to control the electromagnetic force. Besides, it is more difficult to control if the equivalent gap is unknown in case of zero power control. Therefore, this paper proposed the hybrid electro-magnetic levitation control method in which the variable load is estimated by using a load observer and its system controlled at a new zero power equilibrium airgap position. Also it is confirmed that the proposed control method improve the control performance through simulation and experiment.

  • PDF

Load Shedding Algorithm Using the Linear Programming for Congestion Problems by a Major Contingency (주요 상정사고로 인한 송전혼잡 문제에 대한 선형계획법을 이용한 부하차단 알고리즘)

  • Shin, Ho-Sung;Kim, Byoung-Su;Song, Kyung-Bin;Han, Seung-Ho;Lee, Hak-Ju;Kwon, Seong-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.30-32
    • /
    • 2005
  • Due to a major contingency, the congestion of the transmission may happen in power systems. In order to manage the congestion problem, load curtailment is one of the ways to resolve the problem. It is essential that the systematic and effective mechanism for the load shedding be developed. In this paper, the load shedding algorithm using the linear programming for the congestion problems by a major contingency is proposed. The simulations of the proposed algorithm are performed for the power system of Korea and their results are presented.

  • PDF

Load Flow Calculation and Short Circuit Faults Transients in Dispersed Generation Systems

  • Hosseini, Seyed Hossein;Shahnia, Farhad;Tizghadam, Saeed
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.800-804
    • /
    • 2005
  • Load flow and short circuit fault transients of a power distribution system with wind turbines as dispersed generation units is presented. Usage of renewable energies such as wind is already a small part of total installed power system in medium and low voltage networks. In this paper, a radial power distribution system with wind turbines is simulated using DIgSILENT PowerFactory software for their influence on load flow and short circuit fault transients. Short fault occurring in dispersed generation systems causes some problems for the system and costumers such as fault level increase or the problems of sudden fluctuations in the current, voltage, power and torque of the double fed induction machine utilized in the wind turbines which have been studied and investigated.

  • PDF

Design Load Analysis of Current Power Rotor and Tower Interaction

  • Jo, Chul H.;Lee, Kang-Hee;Hwang, Su-Jin;Lee, Jun-Ho
    • International Journal of Ocean System Engineering
    • /
    • v.3 no.4
    • /
    • pp.164-168
    • /
    • 2013
  • Tidal-current power is now recognized as a clean power resource. The turbine blade is the fundamental component of a tidal current power turbine. The kinetic energy available within a tidal current can be converted into rotational power by turbine blades. While in service, turbine blades are generally subjected to cyclic fatigue loading due to their rotation and the rotor-tower interaction. Predicting the fatigue life under a hydrodynamic fatigue load is very important to prevent blade failure while in service. To predict the fatigue life, hydrodynamic load data should be acquired. In this study, the vibration characteristics were analyzed based on three-dimensional unsteady simulations to obtain the cyclic fatigue load. Our results can be applied to the fatigue design of horizontal-axis tidal turbines.

CLUSTER ANALYSIS FOR REGION ELECTRIC LOAD FORECASTING SYSTEM

  • Park, Hong-Kyu;Kim, Young-Il;Park, Jin-Hyoung;Ryu, Keun-Ho
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.591-593
    • /
    • 2007
  • This paper is to cluster the AMR (Automatic Meter Reading) data. The load survey system has been applied to record the power consumption of sampling the contract assortment in KEPRI AMR. The effect of the contract assortment change to the customer power consumption is determined by executing the clustering on the load survey results. We can supply the power to customer according to usage to the analysis cluster. The Korea a class of the electricity supply type is less than other country. Because of the Korea electricity markets exists one electricity provider. Need to further divide of electricity supply type for more efficient supply. We are found pattern that is different from supplied type to customer. Out experiment use the Clementine which data mining tools.

  • PDF

Development of Load Distribution Controller on the Midnight-Power Boiler (심야전력용 보일러의 부하분산 제어기 개발)

  • Park, Hyun-Chul;Kim, Yeong-Min;Hwang, Jong-Sun;Lim, Byung-Hyun;Kim, Jong-Man
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.05b
    • /
    • pp.132-135
    • /
    • 2003
  • The use of the midnight power faces the crisis of the load peak-cut problem. Which appears at the simultaneous start of the midnight power system. We suggest a control method which uses the characteristics of boiler system. The system used that method consists of 6 heaters and are designed for the load distribution on each heater. Proposed method can take the balance of load during full time of midnight power supplied. The system is composed of measurement part and heater controller. Taking the data of the experience as a reason, the algorithm make the midnight power distribute. Experimental results show the validity of the method and the system proposed.

  • PDF

Power and Heat Load of IT Equipment Projections for New Data Center's HVAC System Design (데이터센터의 공조시스템 계획을 위한 IT장비의 전력 및 발열량 예측에 대한 연구)

  • Cho, Jin-Kyun;Shin, Seung-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.3
    • /
    • pp.212-217
    • /
    • 2012
  • The cooling of data centers has emerged as a significant challenge as the density of IT equipment increased. With the rapid increasing of heat load and cooling system, predictions for electronics power trends have been closely watched. A data center power density projection is needed so that IT organizations can develop data centers with adequate cooling for reasonable lifetimes. This paper will discuss the need for something more than processor and equipment power trend projections which have overestimated the required infrastructure for customers. This projection will use data from a survey of actual enterprise data centers and the ASHRAE projections to formulate a data center server heat load trend projection.

Improvement of Continuation Power Flow System Applying the Optimal Load Shedding Algorithm (최적 부하절체 알고리듬을 적용한 연속조류계산의 향상)

  • Song, Hwa-Chang;Lee, Byong-Jun;Kwon, Sae-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.899-901
    • /
    • 1998
  • Continuation power flow is a tool that can trace the path of the solution from the base stable solution. However, the base stable solution cannot be calculated when the initial system load is too large to operate at a stable operating point. This case is called as unsolvable case. This paper presents implementation of the optimal load shedding algorithm on continuation power flow. It performs steady-state analysis of power systems at unsolvable case that can occur in contingency analysis. Numerical simulation on 20-bus test system demonstrates that the continuation power flow applying the optimal load shedding algorithm is robust at solvable and unsolvable cases.

  • PDF

Design of the Boiler Load Distribution System (보일러 본체 지지장치 하중교정 시스템 설계)

  • Park, Jong-Beom;Bae, Byung-Hong;Lee, Sang-Guk;Choi, Jong-Ki;Baek, Soo-Gon
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.778-780
    • /
    • 2000
  • Due to the long time operation of the thermal power plant boiler. the load redistribution of the sling rods is occurred. To enlarge the sincerity of the boiler. measuring and adjusting the actual load of the sung rods is required. The original targets were reached from the 1-year-study. Survey related to the load distribution system for the boiler, systematic design of the hydraulic unit and hydro cylinder, detailed design of the hydraulic unit and hydro cylinder.

  • PDF