• Title/Summary/Keyword: Power generation project

Search Result 172, Processing Time 0.033 seconds

The Effect of the MSW-RDF Power Generation and Tipping Fee Sharing in RDF Project (RDF발전효과와 사업비 분담방안)

  • Choe, Gap-Seok;Choe, Yeon-Seok;Kim, Seok-Jun;Gwon, Yeong-Bae
    • 연구논문집
    • /
    • s.32
    • /
    • pp.5-13
    • /
    • 2002
  • This paper deals with the result of an analysis on the effect of the power generation by municipal solid waste(MSW)-refuse derived fuel(RDF) and the introduction of tipping fee sharing between RDF manufacturing and power generation project. As a model case for the MSW generated at small and medium cities in our country, an analysis of the RDF power generation and Tipping fee sharing shows that 1) MSW amount of 7,800* $10^3 $t/y could produce 1,950*$10^3$t/y of RDF 2) Electric power generated by MSW-RDF could supply 290,000 households/year and 98,548 C-t/y of $CO_2$ could be reduced. 3) Tipping Fee should be shared by the considering of the contents of project of both side between RDF Production and power generation.

  • PDF

Improvement of Resident's Participation on Renewable Energy Power Generation Project in Rural Area - Focused on the Rural Solar Power Generation Systems - (농촌지역 신재생에너지 발전사업 주민참여 활성화 연구 - 농촌태양광 시스템을 중심으로 -)

  • Lee, Chul-sung;Kim, Hyuk;Shin, Seung-wook;Park, Mi-lan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.4
    • /
    • pp.107-115
    • /
    • 2022
  • This study investigated the status of resident participation in the policy of supplying new and renewable energy in rural areas. According to the survey, most of the rural residents were well aware of the new and renewable energy supply project promoted by the government. However, it was found that participation in the project was difficult mainly for economic and social reasons. In order to activate the participation of rural residents who can't participate in the renewable energy power generation project for economic and social reasons, it is necessary to develop and promote business models and support policies for power generation projects in which village communities participate. Changes in residents' acceptability due to resident education and operation for solar power systems were analyzed. As a result of the survey, it was found that the satisfaction of rural residents was high when new and renewable energy power generation projects were introduced in rural areas. Therefore, it is thought that the government's goal of increasing farm household income and expanding the supply of new and renewable energy in rural area can be successfully achieved by the improvement of resident acceptability and the increase of the participation rate. Lastly, this study presented a plan to improve the resident acceptability of the renewable energy system by using the rural solar project and survey results.

Design and Construction Experiences of Solar Thermal Chemical Reaction Hybrid Power Generation (태양열 화학반응 복합발전시스템의 설계 및 시공 사례)

  • Lee, Sang-Nam;Kang, Yong-Heack;Kim, Jin-Soo;Yoon, Hwan-Ki;Yu, Chang-Kyun;Kim, Jong-Kyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.688-692
    • /
    • 2007
  • Solar thermal power generation allows additional benefits of cheap thermal storage and easy hybridization with other fossil fuel-driven power generation. KIER has been performing the project for solar thermal chemical reaction hybrid power generation. The project is to build and operate the first solar thermal chemical reaction hybrid power generation system in Korea. For concentrating solar thermal energy $m^2$ dish type concentrator was adapted and a heliostat is installed for reflecting horizontal insolation to the dish concentrator. At the moment building the dish concentrator including mirror and heliostat with sun tracking system was completed and it's performance are being closely evaluated. This paper will introduce some detailed designs and construction procedures which we have experienced so far.

  • PDF

Simulation and Data Sampling Modelling for 1000MW Boiler Process (1000MW 보일러 프로세스의 모델링과 데이터 추출 및 시뮬레이션)

  • Park, Doo-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2007.10a
    • /
    • pp.301-302
    • /
    • 2007
  • Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

  • PDF

A Case Study of Resolving Conflict in Energy Infrastructure Siting by the Solar PV Project

  • Lee, Jonghwan;Shin, Dong-hwi;Han, Soohee;Roh, Jae Hyung
    • Current Photovoltaic Research
    • /
    • v.8 no.3
    • /
    • pp.79-85
    • /
    • 2020
  • The growing demand for new energy infrastructure has often been encountered with the difficulties of siting in power plants and electric transmission lines. Siting such large-scale and complex facilities produces so many-sided issues that it is highly necessary to develop an approach to resolving the related problems and conflicts. This paper introduces how the stakeholders have handled the issues and resolved conflicts with residents opposed the construction of 765 kV transmission line. The solar photovoltaic power generation, called "Hee-Mang Sunlight Power project", is used for persuading residents to agree with constructing high-voltage transmission line and sharing benefits. It is considered how the project performance such as generation output and resident's profits is and proposed what the project should be revised and supplement. The project is shown that the intractable spiting in energy systems can be smartly resolved with cost-effective institutional solutions instead of relatively expensive technical ones.

Design and Development Trends of Solar Thermal Power Generation in Korea (국내의 태양열발전 기술개발 동향 및 설계)

  • Kang, Yong-Heack;Kim, Jin-Soo;Kim, Jong-Kyu;Lee, Sang-Nam;Yu, Chang-Kyun;Yoon, Hwan-Ki
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.658-661
    • /
    • 2007
  • KIER have been developing high-temperature solar technology, especially the solar thermal power generation system, since the early of 1990s. In 1994, the first research on high temperature solar technology started with PTC technology. At the moment the most advanced 10kW dish system is under demonstration for 10kW solar thermal power generation. Test results showed about 19.2% solar to electricity average efficiency. Another research activities of KIER is hybrid power generation. For hybridization, solar and LFG(landfill gas) are used. Another hybrid solar system is with solar chemical reaction. In this system, power unit is gas turbine, and the heat content of fuel(like natual gas) is upgraded by solar energy through chemical reaction. The latest project on solar thermal power generation is for 1 MW power tower system. This is the Korea-China Joint project.

  • PDF

Design and Construction Experiences of 10kWe Dish-type Solar Thermal Power Generation System (Dish형 집광장치 이용 10kWe급 태양열 발전시스템 설계 및 시공 사례)

  • Lee, Sang-Nam;Kang, Yong-Heack;Jo, Dok-Ki;Yu, Chang-Kyun;Yoon, Hwan-Ki;Kim, Jin-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.684-687
    • /
    • 2005
  • KIER has been running a demonstration project for 10kWe solar thermal power generation. the project is to build and operate the first solar thermal power generation system in Korea. For concentrating solar thermal energy $40m^2$ dish type concentrator was adapted and a stirling engine is going to be integrated to the system for power production. At the moment building the dish concentrator including mirror and sun tracking system was completed and it's performance are being closely evaluated. This paper will introduce some detailed designs and construction procedures which we have experienced so far.

  • PDF

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

Estimating generation capacity of geothermal power generation pilot plant project (우리나라 지열발전 pilot plant 프로젝트의 발전량 추정)

  • Song, Yoonho;Lee, Tae Jong;Yoon, Woon Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.197.1-197.1
    • /
    • 2011
  • Target generation capacity of geothermal power generation pilot plant project through the Enhanced Geothermal Systems (EGS) with a doublet system down to 5 km depth was estimated. Production and re-injection temperatures of geothermal fluid were assumed $160^{\circ}C$ and $60^{\circ}C$, respectively, based on reservoir temperature of $180^{\circ}C$ calculated from the geothermal gradient of $33^{\circ}C$ in Pohang area. In this temperature range, 0.11 of thermal efficiency of the binary generation cycle is a practical choice. Assuming flow rates of 40 kg/sec, which is possible in current EGS technology, gross power generation capacity is estimated to reach 1.848 MW. Net generation considering auxiliary power including pumping power for geothermal fluid and condensing (cooling) energy of working fluid can be 1.5 MW.

  • PDF

Study on Generation Volume of Floating Solar Power Using Historical Insolation Data (과거 일사량 자료를 활용한 수상태양광 발전량 예측 연구)

  • Na, Hyeji;Kim, Kyeongseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.249-258
    • /
    • 2023
  • Solar power has the largest proportion of power generation and facility capacity among renewable energy in South Korea. Floating solar power plant is a new way to resolve weakness of land solar power plant. This study analyzes the power generation of the 18.7 MW floating solar power project located in Saemangeum, Gunsan-si. Since the solar power generation has a characteristic that is greatly affected by the climate, various methods have been applied to predict solar power generation. In general, variables necessary for predicting power generation are solar insolation on inclined surfaces, solar generation efficiency, and panel installation area. This study analyzed solar power generation using the monthly solar insolation data from the KMA (Korea Meteorological Administration) over the past 10 years. Monte Carlo simulation (MCS) was applied to predict the solar power generation with the variables including solar panel efficiency and insolation. In the case of Saemangeum solar power project, the most solar power generation was in May, the least was in December, the average solar power generation simulated on MCS is 2.1 GWh per month, the minimum monthly power generation is 0.3 GWh, and the maximum is 5.0 GWh.