• Title/Summary/Keyword: Power flow management

Search Result 287, Processing Time 0.032 seconds

A Study on Development of Online Wide Area SynchroPhasor and Voltage Stability Monitoring System using Satellite Network (위성망을 이용한 온라인 광역 동기위상 및 전압안정도 감시 시스템 개발에 관한 연구)

  • Kwon, Dae-Yun;Kim, Tae-Jin;Yoon, Sang-Hyun;Jung, Gwang-Gyun;Oh, Gyu-Whan
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.273-274
    • /
    • 2008
  • Recently, the most wide-area blackout in North America, Canada and Europe had shown us indirectly the importance of Wide-Area Power System Protection and had influence on the direction of domestic electric power industry. After reorganization of the electric power industry in 2001, market incentives controls the power generation, transmission and distribution rather than stability of power grid, and moreover it produce bad results like inefficient facility management and too much competition. In addition, we can easily predict the massive loss of social and economic when the wide-area outage occurs by north direction load flow which is a pending problems of domestic power system and in a changed industry likes hi-tech manufacture and information technology industries. This paper introduces the development of infra systems for prevent wide-area blackout in situations of the power system operations.

  • PDF

Designing dam operations for better aquatic species' habitat and economic outcomes in a regulated river

  • Kang, Hyeongsik;Choi, Byungwoong
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.spc2
    • /
    • pp.823-833
    • /
    • 2019
  • This study presents the impact of natural flow patterns on downstream fish habitat and economic outcomes in the Dal Stream, Korea. The study reach is 3.35 km long, located downstream form the Goesan Dam. To assess such impact, this study performed physical habitat simulations. The River2D model was used for the computation of the flow and the HSI model for the habitat simulation. Two physical habitat variables, flow depth and velocity, were used. The Zacco platypus, Zacco temminckii, Coreoleuciscus splendidus, and Opsariichthys bidens were selected as the target species in the study area. Using the building block approach (BBA), the scenarios for the hydropeaking mitigation were presented. Scenario 1 and scenario 2 were proposed by using the magnitude - duration concept and averaged the hydrologic data over the each month, respectively. Simulation results indicated that the scenarios effects significantly increased by about 18.6% for the weighted usable area (WUA). In addition, hydroelectric power benefits with both scenarios were investigated. It was revealed that the change of storing and releasing water decreased by about 27% for hydroelectric power benefits. In order to increase economic benefits, the scenario was modified with the discharges corresponding to the hydropeaking condition except the flood season. As a result, the hydroelectric power benefits were almost the same, however the aquatic habitat for the target species increased by about 5%. The change of dam re-operations through natural flow patterns provides an opportunity to minimize environmental and economic benefits in order to balance water management.

Traffic-Flow Forecasting using ARIMA, Neural Network and Judgment Adjustment (신경망, 시계열 분석 및 판단보정 기법을 이용한 교통량 예측)

  • Jang, Seok-Cheol;Seok, Sang-Mun;Lee, Ju-Sang;Lee, Sang-Uk;An, Byeong-Ha
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.795-797
    • /
    • 2005
  • During the past few years, various traffic-flow forecasting models, i.e. an ARIMA, an ANN, and so on, have been developed to predict more accurate traffic flow. However, these models analyze historical data in an attempt to predict future value of a variable of interest. They make use of the following basic strategy. Past data are analyzed in order to identify a pattern that can be used to describe them. Then this pattern is extrapolated, or extended, into the future in order to make forecasts. This strategy rests on the assumption that the pattern that has been identified will continue into the future. So ARIMA or ANN models with its traditional architecture cannot be expected to give good predictions unless this assumption is valid; The statistical models in particular, the time series models are deficient in the sense that they merely extrapolate past patterns in the data without reflecting the expected irregular and infrequent future events Also forecasting power of a single model is limited to its accurate. In this paper, we compared with an ANN model and ARIMA model and tried to combine an ARIMA model and ANN model for obtaining a better forecasting performance. In addition to combining two models, we also introduced judgmental adjustment technique. Our approach can improve the forecasting power in traffic flow. To validate our model, we have compared the performance with other models. Finally we prove that the proposed model, i.e. ARIMA + ANN + Judgmental Adjustment, is superior to the other model.

  • PDF

Transient simulation and experiment validation on the opening and closing process of a ball valve

  • Han, Yong;Zhou, Ling;Bai, Ling;Xue, Peng;Lv, Wanning;Shi, Weidong;Huang, Gaoyang
    • Nuclear Engineering and Technology
    • /
    • v.54 no.5
    • /
    • pp.1674-1685
    • /
    • 2022
  • The ball valve is an important device in the pipeline transportation system of nuclear power plants. Its operational stability and safety directly affect the normal working of nuclear power plants. In this study, the transient numerical simulation of the opening and closing process of a ball valve was conducted on the basis of the flow interruption capability experiment of the ball valve by using the moving mesh method and inlet and outlet variable boundary conditions. The flow rate and pressure difference with time of the opening and closing process of the ball valve were studied. The internal flow characteristics of the ball valve under different relative openings were analyzed in conjunction with the typical back-step flow structure. Results show that the transient numerical results agree well with the experimental results. The internal flow characteristics of the ball valve are similar at the same opening during opening and closing process. At small opening, the spool and outlet channels easily form a back-step flow structure. The disappearance and generation of backflow vortices during opening and closing occur at 85% opening and 75% opening, respectively. With the decrease in opening degree, the difference in vortex core area in the flow channel of the ball valve spool in the opening and closing process gradually appears. The research results provide some reference value for the design and optimization of ball valves.

Risk Analysis of Electrical Fire for Electric Power Installations by Event Tree Analysis (사건수목분석을 통한 수배전설비의 전기화재위험성 분석)

  • Park, Young Ho;Kim, Doo-Hyun;Kim, Sung-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.5
    • /
    • pp.16-21
    • /
    • 2016
  • The purpose of this paper is to conduct ETA on 15 components of power installations: the DS/LBS, LA, MOF, CT, PT, A/V meter, VCB, OCR, COS, PF, Transformer, Condenser(C), Grounding, Cable and Connector. To achieve that, power installations work flow and its components are categorized. Based on performance, human, environmental, management, and safety, this paper drew Initiation events (IE) and End states (ES). ETA is applied to the main functions of each component, and the end states that may occur in one initiation event are suggested. In addition, detailed classification was performed to induce various end states on the basis of the suggested initiation events. If the suggested IEs and ESs are applied on the basis of power installations event cases, it is expected to prevent the same kinds of accident and operate power installations safely.

On-line Optimal EMS Implementation for Distributed Power System

  • Choi, Wooin;Baek, Jong-Bok;Cho, Bo-Hyung
    • Proceedings of the KIPE Conference
    • /
    • 2012.11a
    • /
    • pp.33-34
    • /
    • 2012
  • As the distributed power system with PV and ESS is highlighted to be one of the most prominent structure to replace the traditional electric power system, power flow scheduling is expected to bring better system efficiency. Optimal energy management system (EMS) where the power from PV and the grid is managed in time-domain using ESS needs an optimization process. In this paper, main optimization method is implemented using dynamic programming (DP). To overcome the drawback of DP in which ideal future information is required, prediction stage precedes every EMS execution. A simple auto-regressive moving-average (ARMA) forecasting followed by a PI-controller updates the prediction data. Assessment of the on-line optimal EMS scheme has been evaluated on several cases.

  • PDF

Analysis of Pipe Wall-thinning Caused by Water Chemistry Change in Secondary System of Nuclear Power Plant (원전 2차계통의 수화학 변화가 배관감육에 미치는 영향 분석)

  • Yun, Hun;Hwang, Kyeongmo;Moon, Seung-Jae
    • Corrosion Science and Technology
    • /
    • v.14 no.6
    • /
    • pp.325-330
    • /
    • 2015
  • Pipe wall-thinning by flow-accelerated corrosion (FAC) is a significant and costly damage of secondary system piping in nuclear power plants (NPPs). All NPPs have their management programs to ensure pipe integrity from wall-thinning. This study analyzed the pipe wall-thinning caused by changing the amine, which is used for adjusting the water chemistry in the secondary system of NPPs. The pH change was analyzed according to the addition of amine. Then, the wear rate calculated in two different amines was compared at the steam cycle in NPPs. As a result, increasing the pH at operating temperature (Hot pH) can reduce the rate of FAC damage significantly. Wall-thinning is affected by amine characteristics depending on temperature and quality of water.

Review on the Integrity Evaluation and Maintenance of Wall-Thinned Pipe (감육배관의 건전성평가 및 정비 관련 기술기준 고찰)

  • Lee, Sung Ho;Lee, Yo Seob;Kim, Hong Deok;Lee, Kyoung Soo;Hwang, Kyeong Mo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.11 no.2
    • /
    • pp.51-60
    • /
    • 2015
  • Local wall thinning and integrity degradation caused by several mechanisms, such as flow accelerated corrosion, cavitation, flashing and/or liquid droplet impingement, is a main concern in secondary steam cycle piping system of nuclear power plants in terms of safety and operability. Thinned pipe management program (TPMP) has being developed and optimized to reduce the possibility of unplanned shutdown and/or power reduction due to pipe failure caused by wall thinning. In this paper, newest technologies, standards and regulations related to the integrity assessment, repair and replacement of thinned pipe component are reviewed. And technical improvement items in TPMP to secure the reliability and effectiveness are also presented.

A Study on Prediction of Metal Loss by Flow-Accelerated Corrosion in the CANDU NPP Secondary Piping Systems (침부식에 의한 CANDU형 원전 2차측 배관의 감육 예측에 관한 연구)

  • Shim, S.H.;Song, J.S.;Yoon, K.B.;Hwang, K.M.;Jin, T.E.;Lee, S.H.;Kim, W.S.
    • Proceedings of the KSME Conference
    • /
    • 2001.06a
    • /
    • pp.616-621
    • /
    • 2001
  • Flow-accelerated corrosion(FAC) is a phenomenon that results in metal loss from piping, vessels, and equipment made of carbon steel. FAC occurs only under certain conditions of flow, chemistry, geometry, and material. Unfortunately, those conditions are in much of the high-energy piping in nuclear and fossil-fueled power plants. Also, for domestic NPP secondary pipings whose operating time become longer, more evidences of FAC have been reported. The authors are studying on FAC management using CHECWORKS, computer code developed by EPRI. This paper is on the prediction results of metal loss by FAC in the one of CANDU type NPP secondary piping systems.

  • PDF

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF