• 제목/요약/키워드: Power System Control and Operation

검색결과 1,995건 처리시간 0.032초

UPS시스템의 병렬운전 제어기법 (The Parallel Operation Control Technique of UPS System)

  • 이상훈;이우철;김경환;현동석
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2002년도 추계학술대회 논문집
    • /
    • pp.158-162
    • /
    • 2002
  • The parallel operation system of multiple UPS(Uninterruptible Power Supply) is used to increase power capacity of the system or to secure higher reliability at critical loads. In the parallel operation of the two UPSs, the load sharing control to maintain the current balance between them is a matter of consequence. In this paper, a highly precise load sharing controller is proposed and implemented for the parallel operation system of two UPSs. After that, a good performance of the proposed method is verified by simulation in the parallel operation system with two UPSs.

  • PDF

수력발전소 자동제어설비의 현대화 (The Modernization of Automatic Control facilities of Hydro Power Plant)

  • 권오극;권영준;송영철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.69-70
    • /
    • 2008
  • Automatic control systems(AVR, Governor, Synchronizer) installed $1970{\sim}1980$ in K-water were considered to be rehabilitated around 2000. Moreover, Korea Power Exchange market system was changed from PPA (Power Purchase Agreement) to a bidding system. Therefore, depending on the power quality, the power provider could achieve additional profits. It is the excitation system and governor that have the functions of enhancing power necessities. During the 20 to 30 years of generator operation, there were many major and minor problems. Examples are SCR burnout (Andong: Excitation system), hunting (Imha: governor), field circuit breaker failure (Chungju 1st: excitation system), the rise of leakage current (Chungju 2nd: excitation system), power supply burnout (Chungju 2nd: governor). These are the typical examples of malfunction which hindered the generator operation and, consequently, diminished the profit of power business. In order to satisfy the needs of the power market and prevent malfunctions mentioned above, the rehabilitation of AVRs and governors were executed. A new system was made to have the flexibility of ancillary service (GF, AGC, etc.), PSS function. With user friendly HMI software, it is more convenient for the operator to fulfill suitable maintenance. It was possible to connect SCADA system by opening protocol of AVR, governor for the efficiency of operation and maintenance.

  • PDF

조력용 PC 기반 기동·정지 제어시스템의 최적화 알고리즘과 시제품 하드웨어 설계 (Prototype Hardware Design and Optimal Algorithm of PC Based Start·Stop Control System for Tidal Generation)

  • 김윤상;박철원
    • 전기학회논문지P
    • /
    • 제63권2호
    • /
    • pp.89-94
    • /
    • 2014
  • Tidal generation has become one of environmentally friendly new and renewable future sources of energy. The Sihwa Tidal Power Plant in South Korea, which was imported from abroad by turnkey type in 2011, connected to the power system in 2012, and is currently under commercial operation. However, leading companies are reluctant to disclose their technologies associated with the control systems and are not cooperative in technology transfers, making it a high priority to develop core technologies in South Korea. In order to develop a start stop control system for tidal generation, this paper presents the optimal algorithm for decision making and prototype of hardware design. First, control systems in tidal power, such as plant operation control, data interfaces between systems, monitoring and control points of the control system, are analyzed. The software development and PC based emulator processes for optimization algorithm processing are described. Finally, verification of the algorithm implementation, hardware platform for start stop control device, and implementation of prototype control system were discussed.

비전도성 폐기물 용융처리를 위한 혼합형 플라즈마토치 시스템 특성 연구 (A Study on the Properties of the Dual-mode Plasma Torch System for Melting the Non-conductive Waste)

  • 문영표;최장영
    • 전기학회논문지
    • /
    • 제65권1호
    • /
    • pp.73-80
    • /
    • 2016
  • The preliminary test for the dual mode plasma torch system was carried out to explore the operation properties in advance. The dual mode plasma torch system that is able to operate in transferred, non-transferred, or dual mode is very adequate for melting the mixed wastes including nonconductive materials such as concrete, asbestos, etc. since it exploits both the high efficiency of heat transfer to the melt in transferred mode and stable operation in non-transferred mode. Also, system operation including restarting is reliable and very easy. A stationary melter with a refractory structure was designed and manufactured considering the melting behavior of slags to minimize the refractory erosion. The power supply for the dual mode plasma torch system built with high power insulated gate bipolar transistor (IGBT) modules has functions for both current control and voltage control and is sufficient to suppress the harmonics during the operation of the plasma torch. The power supply provides two different voltages for transferred operation and non-transferred. It is confirmed that the operation voltage in transferred is always higher than non-transferred. The dual mode plasma torch system was successfully developed and is under operation for a melting experiment to optimize operation data.

Analysis of Control Conflict between UPFC Multiple Control Functions and Their Interaction Indicator

  • Wang H. F.;Jazaeri M.;Cao Y. J.
    • International Journal of Control, Automation, and Systems
    • /
    • 제3권spc2호
    • /
    • pp.315-321
    • /
    • 2005
  • Interactions among multiple control functions of a UPFC installed in a power system have been observed in power system simulation and been reported in authors' previous publications [1,2]. This paper presents new analytical results about these observed interactions and concludes that they are due to the control conflict between the series and shunt part of the UPFC, which are connected through the internal common capacitor inside the UPFC. Investigation in the paper reveals, for the first time as far as the authors are aware of, that the linkage pattern of UPFC series and shunt part decides whether the control functions implemented by the UPFC series and shunt part conflict each other or not. This linkage pattern of UPFC series and shunt part can be described by the flow of active power through the UPFC at steady-state operation of the power system. Hence in order to predict the possible interactions among multiple control functions of the UPFC, an interaction indicator is proposed in the paper which is the direction and amount of active power flow through the internal link of the UPFC series and shunt part at steady-state operation of the power system. This proposed interaction indicator can be calculated from power system load flow solution without having to run simulation of the power system with UPFC controllers installed. By using the indicator, the interactions among multiple control functions of the UPFC caused by badly set controller's parameters are excluded. Therefore the indicator only identifies the possible existence of inherent control conflict of the UPFC.

대규모 풍력 발전 단지의 최적운영 방안 연구 (A Study on the Optimal Operation Schemes for Large-scale Wind Farm)

  • 전영수;최영도
    • 전력전자학회논문지
    • /
    • 제14권5호
    • /
    • pp.365-371
    • /
    • 2009
  • 국내에서는 풍력 발전 기술 집약에 전력하고 있지만 풍력 발전 단지에 대한 운영 경험은 매우 제한적이며, 연계 기준 수립에 대한 기초가 부족한 실정이다. 따라서 국내 계통의 특성을 고려한 연계 기준 및 최적 운영 방안 수립을 위하여 여러 국가에서 적용하고 있는 풍력 발전 단지의 연계기준 및 최적 운영 방안에 대한 검토가 필요하다. 이에 본 논문은 제주계통을 대상으로 한 모의를 통하여 대규모 풍력 발전 단지의 최적 운영 방안에 대한 필요성을 확인하고 제안한다.

System Construction Method of Parallel Operation System constructed with Three Electric Power Converters

  • Ishikura, Keisuke;Inaba, Hiromi;Kishine, Keiji;Nakai, Mitsuki;Ito, Takuma
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • 제3권4호
    • /
    • pp.451-457
    • /
    • 2014
  • Parallel operation systems have an advantage in that they can be constructed quickly and inexpensively by combining existing electric power converters. However, in this case, there is a peculiar problem in that a cross current flows between the electric power converters. To design a control system more simply and commonalize the core of combination reactors, we reviewed a system construction method for parallel operation systems constructed with three electric power converters.

Type-2 Fuzzy Logic Predictive Control of a Grid Connected Wind Power Systems with Integrated Active Power Filter Capabilities

  • Hamouda, Noureddine;Benalla, Hocine;Hemsas, Kameleddine;Babes, Badreddine;Petzoldt, Jurgen;Ellinger, Thomas;Hamouda, Cherif
    • Journal of Power Electronics
    • /
    • 제17권6호
    • /
    • pp.1587-1599
    • /
    • 2017
  • This paper proposes a real-time implementation of an optimal operation of a double stage grid connected wind power system incorporating an active power filter (APF). The system is used to supply the nonlinear loads with harmonics and reactive power compensation. On the generator side, a new adaptive neuro fuzzy inference system (ANFIS) based maximum power point tracking (MPPT) control is proposed to track the maximum wind power point regardless of wind speed fluctuations. Whereas on the grid side, a modified predictive current control (PCC) algorithm is used to control the APF, and allow to ensure both compensating harmonic currents and injecting the generated power into the grid. Also a type 2 fuzzy logic controller is used to control the DC-link capacitor in order to improve the dynamic response of the APF, and to ensure a well-smoothed DC-Link capacitor voltage. The gained benefits from these proposed control algorithms are the main contribution in this work. The proposed control scheme is implemented on a small-scale wind energy conversion system (WECS) controlled by a dSPACE 1104 card. Experimental results show that the proposed T2FLC maintains the DC-Link capacitor voltage within the limit for injecting the power into the grid. In addition, the PCC of the APF guarantees a flexible settlement of real power exchanges from the WECS to the grid with a high power factor operation.

Conceptual design of autonomous emergency operation system for nuclear power plants and its prototype

  • Kim, Jonghyun;Lee, Deail;Yang, Jaemin;Lee, Subong
    • Nuclear Engineering and Technology
    • /
    • 제52권2호
    • /
    • pp.308-322
    • /
    • 2020
  • This paper presents a conceptual design for a plant-wide autonomous operation system that uses artificial intelligence techniques. The autonomous operation system has the power and ability to perform the control functions needed for the emergency operation of a nuclear power plant (NPP) with reduced operator intervention. This paper discusses the emergency operation and level of automation in an NPP and presents the design requirements for an autonomous emergency operation system (A-EOS). Then, an architecture that consists of several modules is proposed, with descriptions of the functions. Finally, this paper introduces a prototype of the suggested autonomous system that integrates the authors' previous works.

발전 통합 운영 시스템에 관한 연구 (The Study on the Generation Integrated Operating System(GIOS) in KOWACO)

  • 김흥년;김기원
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 D
    • /
    • pp.2254-2256
    • /
    • 2004
  • Korea Water Resources Corporation (KOWACO), the only organization specialized in water resources management in Korea, is planning to establish a centralized control system for a related operation. in the central control room, of decision making as to water management and electric power generation. This plan is intended to convert the existing on-site operation system in each multi-purpose dam across the nation into a central operation system in the Corporations head office, for which Generation Integrated Operating System (GIOS) will be established control center in the Corporations head office and modernized nine (9) power stations. substations (RDAC). This article discusses realization of GTOS, especially real-time operation of hydropower plants and a specific architectural features for system communication.

  • PDF