Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.10
/
pp.34-38
/
2015
Recently, the power supply situation has deteriorated and the plan has issued to utilize of emergency generators for securing standby power. If a part of Emergency Generators was utilized by peak shaving, it can be avoiding over-investment in supply power facility. In this paper we investigate management of Emergency Generator and understand the current situation. So, we verify demand response resource possibility of Emergency Generator.
The Purpose of this study is to explain marital power processes perceived by Korean urban husbands. To do the task, this study examined the possibility of classifying the power processes and the effect of resources by using resource theory and normative resource theory . The main results were as follows. 1) Power precesses are classified into five factors, such as, 'induction'. 'isolation' quarreling' 'carelessness' and 'withdrawal of love'. Induction, which makes control attempts by using verbal, indirect communication strategies, is proved to be the most factor. 2) Power resource variables are proved to be significant in their effects on the power processes. That is, objective are proved to be significant in their effects on the power processes. That is , objective resources are influencing on 'induction' and 'isolation' behavior and subjective variables are influencing on the other control attempts, Thus, it is found that including subjective variables as well as objective ones is very important. Above all, that the concept of the centrality of patriarchy is supported to be an appropriate concept for the study on the marital power processes i8s a fruitful result in research. But the variances explained by resource variables are relatively small. It is suggested. therefore, further study should include more significant subjective resource variables.
This paper proposes a low power resource allocation and scheduling algorithm that minimized power consumption such as DSP circuit in high-level synthesis process. In this paper, we have used list-scheduling method for low power design in scheduling step. Also, it increase possibility to reuse input through resource sharing when assign resource. After scheduling, the resources allocation uses the power function in consideration of the result of calculating average hamming distances and switching activity between two input. First, it obtain switching activity about input value after calculate average hamming distances between two operator and find power value make use of bit pattern of the input value. Resource allocation process assign operator to minimize average hamming distance and power dissipation on all occasions which is allocated at each control step according to increase control step. As comparing the existed method, the execution time becomes fast according to number of operator and be most numberous control step. And in case of power that consume, there is decrease effect from 6% to 8% to be small.
In recent day, many people are interested in wind resource for generation of electric power. Especially, it is made assessment the possibility of generation of electric power by wind resource originated from running cars and buses in downtown or highway. Moreover bus, driven in the exclusive lane, is focused on possibility of generation electric power on highway because median strip makes fast flow way between bus body and median strip and a pattern will appear in the flow way like drag coefficient. But nobody can guess whether the induced flow will increase or decrease and estimate amount of change of drag coefficient. Solving drag coefficient of bus running highway is the point of this paper. To solve this problem, we use the CFD method. The model is a bus simplified without mirror and gates. In order to assess result, the flow analysis surrounding the bus on the flat road where median strip is not installed has been compared with road with median strip. Solving condition is that the driving highway and median strip are running with 100km/h (27.8m/s).
When we urgently need to develop and supply an alternative energy, wind power is growing with much interest because it has relative low cost of power and area of tower. To estimate the wind power resource, it is necessary to make an wind resource map first. On the study of wind resource map in the Korean peninsula, Southern coast was needed to investigate the possibility of developing wind power complex because of good wind resources. In this study, we made a vertical observation to analyze the properties of wind in coastal area. From tethered sonde observation, we knew that synoptic effect had an influence higher in second day than first day. This means local wind circulation is generated on first day but not second day. The local wind made vertical wind shear strong in first day. Also, there was large difference of wind speed between layers at night time by analysis of SODAR observation.
To study the developments and variations of unsafe behaviors in nuclear power plants thus reduce the possibility of human-related accidents, this paper, based on the Game Theory, focused on the changes in benefits of the Department of Management, Operational and Emergency in a nuclear power plant, and established the expected revenue functions of these departments. Additionally, the preventive measures of unsafe behaviors in nuclear power plants were also presented in terms of these 3 departments. Results showed that the violations of the Operation Department (OD) and the Emergency Department (ED) were not only relevant with the factors such as their own risks, costs, and the responsibility-sharing due to accidents, but also affected by the safety investments from the Management Department (MD). Furthermore, results also showed that the accident-induced responsibility-sharing of both the OD and the ED would rise, if the MD increased the investments in safety. As a result, the probability of violation behaviors of these 3 departments would be attenuated consciously, which would reduce the unsafe behaviors in the nuclear power plants significantly.
Journal of the Korean Institute of Telematics and Electronics C
/
v.36C
no.4
/
pp.17-29
/
1999
This paper presents a high level synthesis method targeting low power consumption for data-dominated CMOS circuits (e.g., DSP). The high level synthesis is divided into three basic tasks: scheduling, resource and register allocation. For lower power scheduling, we increase the possibility of reusing an input operand of functional units. For a scheduled data flow graph, a compatibility graph for register and resource allocation is formed, and then a special weighted network is then constructed from the compatibility graph and the minimum cost flow algorithm is performed on the network to obtain the minimum power consumption data path assignment. The formulated problem is then solved optimally in polynomial time. This method reduces both the switching activity and the capacitance in synthesized data path. Experimental results show 15% power reduction in benchmark circuits.
Proceedings of the Korean Institute of Building Construction Conference
/
2005.05a
/
pp.99-104
/
2005
This study is as a part of the new disposal and recycling plans of heat-resource waste of Daegu dyeing, industrial center we tried to examine applicable possibility of crushed thing(waste aggregate) as aggregates for mortar and concrete. To examine applicable possibility of waste aggregate as a lightweight-aggregate for concrete and mortar, we carried this study by mainly property examination of concrete according to replacement ratio of waste aggregate. We carried slump, unit weight, compressive strength and bending strength test according to replacement ratio of waste aggregate. As the result of that, if we use waste aggregate, lightweight of concrete and mortar will be possible. Specially it shows a strength improvement effect of cement hardening according to using this so it is judged that applicable possibility as aggregate for concrete and mortar is very excellent.
Recently effective spectrum resource technologies have been studied using a game theorectical approach for cognitive radio networks. Radio resource management is required an effective scheme because the performance of a radio communication system much depends on it's effectiveness. In this paper, we suggest a game theoretical algorithm for adaptive power control which is required an effect scheme in cognitive radio networks. It will be a distributed network. In the network distributed cognitive radio secondary users require an adaptive power control. There are many results which are suggested some possibility of game theoretical approaches for communication resource sharing. However, we suggest a practical game algorithm to achieve Nash equilibrium of all secondary users using a Nash equilibrium theorem in this paper. Particularly, a game model was analyzed for adaptive power control of a cognitive radio network, which is involved in DSSS (Direct Sequence Spread Spectrum) techniques. In case of K=63 and N=12 in the DSSS network, the number of iteration was less than maximum 200 using the suggested algorithm.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.1
/
pp.26-32
/
2010
This paper proposes a new effective installed reserve rate in order to evaluate reliability of power system considering renewable generators, which include uncertainty of resource supply. It is called EIRR(effective installed reserve rate) in this paper. It is developed with considering capacity credit based on ELCC by using LOLE reliability criterion. While the conventional installed reserve rate index yields over-evaluation reliability of renewable generators, the proposed EIRR describes actual effective installed reserve rate. However, it is not the probabilistic reliability index as like as LOLE or EENS but another deterministic effective reliability index. The proposed EIRR is able to evaluate the realistic contribution to the reliability level for power system considering wind turbine generators and solar cell generators with high uncertainty in resource supply. The case study in model system as like as Jeju power system size presents a possibility that the proposed EIRR can be used practically as a new deterministic reliability index for generation expansion planning or operational planning in future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.