전력계통 유지보수 및 운영을 위한 향후 4주의 일 최대 전력수요예측 (Daily Maximum Electric Load Forecasting for the Next 4 Weeks for Power System Maintenance and Operation)

  • 정현우;송경빈
    • 전기학회논문지
    • /
    • 제63권11호
    • /
    • pp.1497-1502
    • /
    • 2014
  • Electric load forecasting is essential for stable electric power supply, efficient operation and management of power systems, and safe operation of power generation systems. The results are utilized in generator preventive maintenance planning and the systemization of power reserve management. Development and improvement of electric load forecasting model is necessary for power system maintenance and operation. This paper proposes daily maximum electric load forecasting methods for the next 4 weeks with a seasonal autoregressive integrated moving average model and an exponential smoothing model. According to the results of forecasting of daily maximum electric load forecasting for the next 4 weeks of March, April, November 2010~2012 using the constructed forecasting models, the seasonal autoregressive integrated moving average model showed an average error rate of 6,66%, 5.26%, 3.61% respectively and the exponential smoothing model showed an average error rate of 3.82%, 4.07%, 3.59% respectively.

Robust feedback-linearization control for axial power distribution in pressurized water reactors during load-following operation

  • Zaidabadi nejad, M.;Ansarifar, G.R.
    • Nuclear Engineering and Technology
    • /
    • 제50권1호
    • /
    • pp.97-106
    • /
    • 2018
  • Improved load-following capability is one of the most important technical tasks of a pressurized water reactor. Controlling the nuclear reactor core during load-following operation leads to some difficulties. These difficulties mainly arise from nuclear reactor core limitations in local power peaking: the core is subjected to sharp and large variation of local power density during transients. Axial offset (AO) is the parameter usually used to represent the core power peaking. One of the important local power peaking components in nuclear reactors is axial power peaking, which continuously changes. The main challenge of nuclear reactor control during load-following operation is to maintain the AO within acceptable limits, at a certain reference target value. This article proposes a new robust approach to AO control of pressurized water reactors during load-following operation. This method uses robust feedback-linearization control based on the multipoint kinetics reactor model (neutronic and thermal-hydraulic). In this model, the reactor core is divided into four nodes along the reactor axis. Simulation results show that this method improves the reactor load-following capability in the presence of parameter uncertainty and disturbances and can use optimum control rod groups to maneuver with variable overlapping.

저압 모의선로에 소형발전원 연계시 특성 (Connected Characteristics for Small Generation Source of Low Voltage Model Grids)

  • 이상우;강진규;이동하;박태준
    • 조명전기설비학회논문지
    • /
    • 제27권2호
    • /
    • pp.45-53
    • /
    • 2013
  • In this paper, we analyze the typical phase voltage and line current waveform characteristics of the distribution system with 3 phase small synchronous generation source in case with load and non-load group, in order to investigate the power quality for end load connected of generation source. As demonstrated by our experimental results, the distortion and power quality of phase voltage and line current waveform were relatively good for low voltage 3 phase model grids connected of 3 phase small synchronous generation source in case with non-load group. However, distortion and power quality of voltage and current waveform was poor for low voltage 3 phase model grids connected to 3 phase small synchronous generation source in the load group with some phase voltage and frequency difference. From the above results, we conclude that the phase voltage and frequency of 3 phase generation source must be identical to that of distribution system source to maximize the power quality. Also, special attention is required in case of having load group or non-load group to 3 phase generation source.

A Hybrid Correction Technique of Missing Load Data Based on Time Series Analysis

  • Lee, Chan-Joo;Park, Jong-Bae;Lee, Jae-Yong;Shin, Joong-Rin;Lee, Chang-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권4호
    • /
    • pp.254-261
    • /
    • 2004
  • Traditionally, electrical power systems had formed the vertically integrated industry structures based on the economics of scale. However, power systems have been recently reformed to increase their energy efficiency. According to these trends, the Korean power industry underwent partial reorganization and competition in the generation market was initiated in 2001. In competitive electric markets, accurate load data is one of the most important issues to maintaining flexibility in the electric markets as well as reliability in the power systems. In practice, the measuring load data can be uncertain because of mechanical trouble, communication jamming, and other issues. To obtain reliable load data, an efficient evaluation technique to adjust the missing load data is required. This paper analyzes the load pattern of historical real data and then the tuned ARIMA (Autoregressive Integrated Moving Average), PCHIP (Piecewise Cubic Interpolation) and Branch & Bound method are applied to seek the missing parameters. The proposed method is tested under a variety of conditions and also tested against historical measured data from the Korea Energy Management Corporation (KEMCO).

계통연계 인버터의 주요 부하 불평형 시 상전류 제어를 통한 부하 상전압 평형 제어 (An Output Voltage Balance Control of Grid Connected Inverter by Phase Current Control at Critical Load Unbalanced Condition)

  • 박태현;김학원;조관열;민준기;최원일
    • 전력전자학회논문지
    • /
    • 제28권1호
    • /
    • pp.22-29
    • /
    • 2023
  • A grid-connected inverter can be used in grid-connected or stand-alone modes. Generally, a grid-connected inverter operates in a grid-connected mode, but the inverter operates in stand-alone mode if grid faults occur. In the stand-alone mode, the grid-connected inverter must supply electric power to a critical load that needs to receive stable power even though grid faults occur. Generally, three-phase loads are used as critical loads, but a single phase is configured in some cases. In these conditions, the critical load is required to unbalance the load power consumption, which makes the three-phase load voltage unbalancd. This unbalanced voltage problem can cause fatal problems to the three-phase critical loads, and thus must be addressed. Hence, this paper proposes an algorithm to solve this unbalanced voltage problem by the individual phase current control. The proposed method is verified using Psim simulation and experiments.

Study of Peak Load Demand Estimation Methodology by Pearson Correlation Analysis with Macro-economic Indices and Power Generation Considering Power Supply Interruption

  • Song, Jiyoung;Lee, Jaegul;Kim, Taekyun;Yoon, Yongbeum
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1427-1434
    • /
    • 2017
  • Since the late 2000s, there has been growing preparation in South Korea for a sudden reunification of South and North Korea. Particularly in the power industry field, thorough preparations for the construction of a power infrastructure after reunification are necessary. The first step is to estimate the peak load demand. In this paper, we suggest a new peak demand estimation methodology by integrating existing correlation analysis methods between economic indicators and power generation quantities with a power supply interruption model in consideration of power consumption patterns. Through this, the potential peak demand and actual peak demand of the Nation, which experiences power supply interruption can be estimated. For case studies on North Korea after reunification, the potential peak demand in 2015 was estimated at 5,189 MW, while the actual peak demand within the same year was recorded as 2,461 MW. The estimated potential peak demand can be utilized as an important factor when planning the construction of power system facilities in preparation for reunification.

A Phase-shifter for Regulating Circulating Power Flow in a Parallel-feeding AC Traction Power System

  • Choi, Kyu-Hyoung
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권4호
    • /
    • pp.1137-1144
    • /
    • 2014
  • A parallel-feeding AC traction power system increases the power supply capacity and decreases voltage fluctuations, but the circulating power flow caused by the phase difference between the traction substations prevents the system from being widely used. A circuit analysis shows that the circulating power flow increases almost linearly as the phase difference increases, which adds extra load to the system and results in increased power dissipation and load unbalance. In this paper, we suggest a phase shifter for the parallel-feeding AC traction power system. The phase shifter regulates the phase difference and the circulating power flow by injecting quadrature voltage which can be obtained directly from the Scott-connection transformer in the traction substation. A case study involving the phase shifter applied to the traction power system of a Korean high-speed rail system shows that a three-level phase shifter can prevent circulating power flow while the phase difference between substations increases up to 12 degrees, mitigate the load unbalance, and reduce power dissipation.

Load Characteristics of Engine Main Bearing : Comparison Between Theory and Experiment

  • Cho, Myung-Rae;Oh, Dae-Yoon;Ryu, Seung-Hyuk;Han, Dong-Chul
    • Journal of Mechanical Science and Technology
    • /
    • 제16권8호
    • /
    • pp.1095-1101
    • /
    • 2002
  • The load characteristics of engine main bearing are very important in the design of crankshaft and engine block. The stiffness of crankshaft and block, or the optimal dimension of the bearing can be determined according to the load level. This paper presents the load characteristics of engine main bearing. Two components of the main bearing load are measured during engine firing and motoring. The vertical and horizontal load components are measured by using the dynamic load cell mounted in each main bearing cap bolt. The measured main bearing loads are compared with calculated results by using the statically determinate method. The theoretical results, provided in this study, agreed well with the experimental results. The presented results are very useful for achieving optimal design of engine.

저낙차용 수차의 동력전달 스프로켓 휠 이의 하중분포 해석 (Load distribution analysis of a sprocket wheel tooth for a low head hydro-turbine power transmission system)

  • 강용석;김현수;김현진
    • 대한기계학회논문집
    • /
    • 제18권5호
    • /
    • pp.1087-1095
    • /
    • 1994
  • Chain drive power transmission system was developed for a low head hydro-turbine which generates power by energy transformation on the turbine blades attached to chains. Also, experimental and theoretical analysis for the sprocket wheel tooth load distribution were performed. The tooth load was measured by the specially designed load sensor. It was found that the tooth load distribution for the steady state operation was in good accordance with the quasi-static state results showing the peak load at the final meshing tooth. The trend of the experimental results agreed with the theoretical results based on the spring model analysis and difference in the magnitude of the maximum tooth load was considered to be the effect of the variable spring constant due to the moving contact point between the roller and sprocket wheel tooth.

다중회귀모형을 이용한 104주 주 최대 전력수요예측 (Weekly Maximum Electric Load Forecasting Method for 104 Weeks Using Multiple Regression Models)

  • 정현우;김시연;송경빈
    • 전기학회논문지
    • /
    • 제63권9호
    • /
    • pp.1186-1191
    • /
    • 2014
  • Weekly and monthly electric load forecasting are essential for the generator maintenance plan and the systematic operation of the electric power reserve. This paper proposes the weekly maximum electric load forecasting model for 104 weeks with the multiple regression model. Input variables of the multiple regression model are temperatures and GDP that are highly correlated with electric loads. The weekly variable is added as input variable to improve the accuracy of electric load forecasting. Test results show that the proposed algorithm improves the accuracy of electric load forecasting over the seasonal autoregressive integrated moving average model. We expect that the proposed algorithm can contribute to the systematic operation of the power system by improving the accuracy of the electric load forecasting.