• Title/Summary/Keyword: Power Fuse

Search Result 95, Processing Time 0.02 seconds

A Study on the Influence of Japanese Tokonoma on Aalto's Art Display Concept in Villa Mairea (1937-39) (알토의 마이레아 저택 미술전시개념에 나타난 일본주택 도꼬노마의 영향에 관한 연구)

  • Kim, Hyon-Sob
    • Journal of architectural history
    • /
    • v.15 no.3
    • /
    • pp.43-57
    • /
    • 2006
  • The Villa Mairea (1937-39) designed by Alvar Aalto (1898-1976) has been studied by many researchers from various viewpoints. However, few studies have devoted their attention to the major issue raised by Aalto at the Yale University lecture and "Mairea" article in arkitekten in 1939. The issue is to fuse art with life in the living room with mobile partition walls that can function both as art exhibition walls and as art storage cabinets at the same time. Through this device, he maintained, the client can change displayed pictures easily according to the situation and so "painting and everyday life can evolve in a more direct manner." This paper argues that Aalto's concept originated from Japanese 'tokonoma' in Tetsuro Yoshida's Das japanische Wohnhaus (1935), which he referred to during the project. Differently from other Japanese features in the house, this tokonoma idea is more than formal, but more decisive than passing in driving the plan. And, whether coincidently or not, his idea exactly corresponds to Japanese aesthetes' and critics' own interpretation of the tononoma as the symbolic centre of Japanese people's everyday life. More importantly, however, this art display concept discloses secret strata of modern architecture during the time when the petrified rationalism was still at its power Even through the tokonoma motif alone, we see diverse trails in modern architecture: fusion of the East and the West, fusion of the traditional and the modern, to say nothing of fusion of art with life.

  • PDF

Microstructural Analysis of STS316L Samples Manufactured by Powder Bed Fusion and Post-heat Treatments (Powder Bed Fusion 공정으로 제조한 STS 316L의 미세조직과 후속 열처리 특성)

  • Song, S.Y.;Lee, D.W.;Cong, D.V.;Kim, J.W.;Lee, S.M.;Joo, S.H.;Kim, Jin-Chun
    • Journal of Powder Materials
    • /
    • v.29 no.1
    • /
    • pp.14-21
    • /
    • 2022
  • In the powder bed fusion (PBF) process, a 3D shape is formed by the continuous stacking of very fine powder layers using computer-aided design (CAD) modeling data, following which laser irradiation can be used to fuse the layers forming the desired product. In this method, the main process parameters for manufacturing the desired 3D products are laser power, laser speed, powder form, powder size, laminated thickness, and laser diameter. Stainless steel (STS) 316L exhibits excellent strength at high temperatures, and is also corrosion resistant. Due to this, it is widely used in various additive manufacturing processes, and in the production of corrosion-resistant components with complicated shapes. In this study, rectangular specimens have been manufactured using STS 316L powder via the PBF process. Further, the effect of heat treatment at 800 ℃ on the microstructure and hardness has been investigated.

A Study on the Fire Risk of High-voltage Cables for Electrical Vehicles (전기차용 고전압 케이블의 화재 위험성에 관한 연구)

  • Sin Dong Kang;Ye Jin Park;Si Hyun Kim;Jae-Ho Kim
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.4
    • /
    • pp.8-14
    • /
    • 2023
  • This study presents the characteristics of short circuits (SCs) caused by excessive currents in high-voltage cables used in electric vehicles and emphasizes the need to calculate the cross-sectional areas of these cables according to the SC current. Three direct current power supplies were connected in parallel to test the SC characteristics caused by excessive currents, and a timer and a magnetic contactor were used to deliver the conduction time and SC current. A circular infrared-radiation heater was used to test the temperature-dependent SC characteristics, a thermocouple was used to measure the temperature, and a shunt resistor was used to measure the current. As the SC current increased, the fusing time of the cable decreased. Additionally, a high-voltage cable (with an area of 16 mm2 ) used in electric vehicles fused when a current (approximately equal to 55 times the allowable current) flowed for 0.2 s (operating time of the protective device). When the SC current is 10 kA, the cable may fuse during the operating time of the protective device, thus creating a fire hazard. In electric vehicles, the size of the SC current increases in proportion to the capacity of the battery. Thus, the cross-sectional areas of the cables used should be calculated accordingly, and cable operations should be properly coordinated with the surrounding protective devices.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

A Comparative Analysis of Masan's Democratic Movement : The 3·15 Uprising in 1960 and the 10·18 Buma Uprising in 1979. (마산의 민주화운동 비교 분석: 1960년 3·15의거와 1979년 10·18부마항쟁)

  • Chung, Joo-Shin
    • Korea and Global Affairs
    • /
    • v.3 no.2
    • /
    • pp.5-58
    • /
    • 2019
  • The purpose of this article is to bring about 10.26 accident by providing a fuse for the overthrow of the Park Chung-hee administration in the 10.18 Buma uprising. So, first of all, this article has a main purpose in analyzing the comparison between Masan's 3.15 uprising and 10.18 Buma uprising. The purpose of the study is to compare the 3.15 democratic movement in Masan with the 10.18 Buma uprising, given that the incident laid the foundation for the dictator to be overthrown in the event of an anti-dictatorial movement in Masan. The research method of this article is intended to be used as a research method in the 3.15 and 10.18 protests, given that if a person in power conducts election fraud or suppresses anti-government movements in order to maintain the system, it could lead to the destruction of those in power. In the end, the Masan 3.15 uprising and 10.18 uprising failed to reach a direct attempt to overthrow the regime due to unfinished democratic movements, but with the revolution of 4.19 and the massive political transformation of 10.26 Accident, he achieved the leading role theory that allowed the Rhee Syngman and Park Chung-hee administrations. In eradicating authoritarian regimes, however, the historic significance of the democratization movement was that the authoritarian regime eventually brought about the collapse of the regime by making a hard-line stance on election schemes or popular protests over the trap of power boomerang, which causes the regime to collapse.