It is widely known that the ultra high frequency (UHF) method that detects the electromagnetic wave of the PD pulses in the gas insulated space is one of the most competitive methods for its high sensitivity. From the above point of view, this paper describes the propagation characteristics of GIS PD signals measured with ultra wide band (UWB) GIS PD detecting system in which PD signals are detected into the dual UHF band. The UWB PD detection system consists of the UWB UHF coupler, the UWB low noise amplifier (LNA) and the oscilloscope. The dual bands for PD signals are 0.5-2GHz(full band) and 1-2GHz(high band). As results, propagation characteristics of GIS PD signals were measured in the mock-up GIS bus and it was found that the propagation characteristics of the high band showed a better result in accordance with the infernal configuration of the GIS bus than those of the full band.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.12
/
pp.1699-1704
/
2018
In this paper, proposed a method to improve of control characteristics for power facility using the adaptive sizing of fuzzy inference method. In the use of the controller based the fuzzy logic, a basic mamdani fuzzy controller is applied. However, when the maximum value and the minimum value have to taken, the fuzzy controller can not take a normal value because of formalized grouping form. In this paper, we combine the conventional methods with single valued sets to compensate for the disadvantage caused by the mamdani method control. Simulation results show that the proposed method has better overshoot and steady state arrival time than the conventional control method.
The Journal of the Korea institute of electronic communication sciences
/
v.16
no.5
/
pp.835-844
/
2021
In this paper, a power facility communication control device was designed to autonomously determine and separate the fault section through communication between power facilities in the smart grid distribution system. In the power facility communication control device, the control module was designed as a DSP to measure three-phase voltage and current, and the communication module was designed as an embedded-based Raspberry Pi to determine the fault section and realize the fault section separation through communication between power facilities. Communication between DSP and Raspberry Pi was designed by SPI communication, and communication between Raspberry Pi was designed based on Wi-Fi. Finally, a performance evaluation system based on three power facility communication control devices was built, and simulation verification was conducted for various fault events that may occur on the distribution line. As a result of the test evaluation, it was possible to confirm the effectiveness of the design methodology of the communication control device by showing the required response of the communication control device to all test cases.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2005.05a
/
pp.962-965
/
2005
A high intensity progressive wave tube is installed at Korea Aerospace Research Institute (KARI) for acoustic environmental tests. The test facility has 700 mm x 800 mm cross-sectional area, and provides acoustic environment of 165 dB over the frequency range of $25Hz{\sim}10,000Hz$. The facility consists of a 6 m long acoustic wave tube, acoustic power generation systems, gases nitrogen supply systems, and acoustic control systems. This paper describes how the basic parameters of the facility and power generation systems are controlled to meet the requirement of the test. The shape and length of the tube has been designed by using the size of test objects and the wave propagation characteristics of the tube. The capacity of acoustic power generation systems is determined by the energy conversion of acoustic wave and the efficiency of acoustic modulators. Moreover, the paper introduces test run results of the tube. Overall of 163dB has been generated by using the test facility.
Baek, Jeong-Seok;Jeong, Yeui-Young;Ahn, Sang-Bok;Kim, Wan
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.6
no.4
/
pp.387-398
/
2008
To obtain base-line data in the low- and intermediate-level radioactive waste disposal facility, radiological environment investigation is required at least two years prior to the facility operation near the disposal facility. The investigation has been performed since January 2007 for the Wolsong LILW disposal center. In this paper, investigation procedure and detailed information obtained for six months in 2008 are described. Based on the current results, future investigation planning is also discussed for the radiological environment management of the disposal facility.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2021.05a
/
pp.237-239
/
2021
Failure and malfunction of the unmanned surveillance facility cost can lead to delays occurring until the person in charge arrives at the unmanned surveillance facility, and theft, damage, and information leakage damage caused by intruders. In addition, due to equipment failure and malfunction, additional costs are incurred due to constant inspection by the manager. In this paper, in order to compensate for the malfunction of unmanned facility costs, we propose a system that diagnoses the monitoring facility in real time, displays the contents of the problem, automatically restores the facility power, and informs the person in charge of the situation by text message. The proposed system is a surveillance facility consisting of main facilities such as video equipment (CCTV), sound equipment, floodlights, etc. And SMS server that can send text messages in real time. Through experiments, the effectiveness of the proposed system was verified.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.59
no.1
/
pp.71-76
/
2010
This paper is focused on implementing a real-time data acquisition system that checks power facility status by applying network based technology to Urban Transit substation power facilities and the results of its on-field tests. This system is composed of a sensor part, a measurement part, a transceiver part, a host computer, and a power source part. The system is designed to collect, save, analyze, and display the online state power facility AI (Analog Input). This system measures voltage and current from positive feeders and negative feeders where it is possible to check abnormalities of the substation‘s main power facilities. By monitoring abnormal data of the Urban Transit power facilities real-time and analyzing stored data, establishing procedures of optimized maintenance is possible.
Sergey V. Bedenko ;Igor O. Lutsik;Vadim V. Prikhodko ;Anton A. Matyushin ;Sergey D. Polozkov ;Vladimir M. Shmakov ;Dmitry G. Modestov ;Hector Rene Vega-Carrillo
Nuclear Engineering and Technology
/
v.55
no.7
/
pp.2678-2686
/
2023
This work demonstrates the results of full-scale numerical experiments of a hybrid thorium-containing fuel plant operating in a state close to critical due to a controlled source of D-T neutrons. The proposed facility represented a level of generated power (~10-100 MWt) in a small pilot. In this work, the simulation of the D-T neutron plasma source operation in conjunction with the facility blanket was performed. The fission of fuel nuclei and the formation of spatial-energy release were studied in this simulation, in pulsed and stationary modes of the facility operation. The optimization results of neutronic and fluid dynamics studies to level the emerging offsets of the radial energy formed in the volume of the facility multiplying part due to the pulsed operation of the D-T neutron plasma source were presented. The results will be useful in improving the power control-based subcriticality monitoring method in coupled systems of the "pulsed neutron source-subcritical fuel assembly" type.
Kim, Nam-Dae;Kim, Woo-Jung;Lee, Nam-Ho;Kim, Seok-Kon;Jang, Byung-Tae
KEPCO Journal on Electric Power and Energy
/
v.6
no.3
/
pp.253-257
/
2020
The local information processing devices are devices that process information by converting voltage, current, and digital electric signals from legacy-type power facility into IEC 61850 based data. It acquires and processes the operation information of legacy-type power facility, performs control of power facility, and interlock function using internal logic. In particular, the time to convert data to process input and output information for a device is important because a number of protection relay input and output signals are handled by only one device. This paper introduces test methods and cases for measuring IEC 61850 communication function and input/output data conversion time of local information processing device.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.