• Title/Summary/Keyword: Power Balance

Search Result 1,156, Processing Time 0.033 seconds

A Study on Appropriate Military Strength of Unified Korea (Focused on relative balance strategy and conflict scenario) (통일 한국의 적정 군사력에 관한 연구 - 분쟁 시나리오와 상대적 균형전략을 중심으로 -)

  • Hong, Bong-Gi
    • Journal of National Security and Military Science
    • /
    • s.13
    • /
    • pp.687-738
    • /
    • 2016
  • To prepare for the complicated international relationship regarding Korean Peninsula after reunification, this thesis started off with the awareness that Unified Korea should build its international posture and national security at an early stage by determining its appropriate military strength for independent defense and military strategies that Unified Korea should aim. The main theme of this thesis is 'The research on appropriate military strength of the Unified Korean military'. To derive appropriate military strength of Unified Korea, this research focuses on conflict scenario and relative balance strategy based on potential threats posed by neighboring countries, and this is the part that differentiates this research from other researches. First of all, the main objective of the research is to decide appropriate military strength for Unified Korea to secure defense sufficiency. For this, this research will decide efficient military strategy that Unified Korea should aim. Than by presuming the most possible military conflict scenario, this research will judge the most appropriate military strength for Unified Korea to overcome the dispute. Second, after deciding appropriate military strength, this research will suggest how to operate presumed military strength in each armed force. The result of this thesis is as in the following. First, Unified Korea should aim 'relative balance strategy'. 'Relative balance strategy' is a military strategy which Unified Korea can independently secure defense sufficiency by maintaining relative balance when conflicts occur between neighboring countries. This strategy deters conflicts in advance by relative balance of power in certain time and place. Even if conflict occurs inevitably, this strategy secures initiative. Second, when analyzing neighboring countries interest and strategic environment after unification, the possibility of all-out war will be low in the Korean Peninsula because no other nation wants the Korean Peninsula to be subordinated to one single country. Therefore appropriate military strength of the Unified Korean military would be enough when Unified Korea can achieve relative balance in regional war or limited war. Third, Northeast Asia is a region where economic power and military strength is concentrated. Despite increasing mutual cooperation in the region, conflicts and competition to expand each countries influence is inherent. Japan is constantly enhancing their military strength as they aim for normal statehood. China is modernizing their military strength as they aspire to become global central nation. Russia is also enhancing their military strength in order to hold on to their past glory of Soviet Union as a world power. As a result, both in quality and quantity, the gap between military strength of Unified Korea and each neighboring countries is enlarged at an alarming rate. Especially in the field of air-sea power, arms race is occurring between each nation. Therefore Unified Korea should be equipped with appropriate military strength in order to achieve relative balance with each threats posed by neighboring countries. Fourth, the most possible conflicts between Unified Korea and neighboring countries could be summarized into four, which are Dokdo territorial dispute with Japan, Leodo jurisdictional dispute with China, territorial dispute concerning northern part of the Korea Peninsula with China and disputes regarding marine resources and sea routes with Russia. Based on those conflict scenarios, appropriate military strength for Unified Korea is as in the following. When conflict occurs with Japan regarding Dokdo, Japan is expected to put JMSDF Escort Flotilla 3, one out of four of its Japan Maritime Self-Defense Force Escort Fleet, which is based in Maizuru and JMSDF Maizuru District. To counterbalance this military strength, Unified Korea needs one task fleet, comprised with three task flotilla. In case of jurisdictional conflict with China concerning Leodo, China is expected to dispatch its North Sea fleet, one out of three of its naval fleet, which is in charge of the Yellow Sea. To response to this military action, Unified Korea needs one task fleet, comprised with three task flotilla. In case of territorial dispute concerning northern part of the Korean Peninsula with China, it is estimated that out of seven Military Region troops, China will dispatch two Military Region troops, including three Army Groups from Shenyang Military Region, where it faces boarder with the Korean Peninsula. To handle with this military strength, Unified Korea needs six corps size ground force strength, including three corps of ground forces, two operational reserve corps(maneuver corps), and one strategic reserve corps(maneuver corps). When conflict occurs with Russia regarding marine resources and sea routes, Russia is expected to send a warfare group of a size that includes two destroyers, which is part of the Pacific Fleet. In order to balance this strength, Unified Korea naval power requires one warfare group including two destroyers. Fifth, management direction for the Unified Korean military is as in the following. Regarding the ground force management, it would be most efficient to deploy troops in the border area with china for regional and counter-amphibious defense. For the defense except the border line with china, the most efficient form of force management would be maintaining strategic reserve corps. The naval force should achieve relative balance with neighboring countries when there is maritime dispute and build 'task fleet' which can independently handle long-range maritime mission. Of the three 'task fleet', one task fleet should be deployed at Jeju base to prepare for Dokdo territorial dispute and Leodo jurisdictional dispute. Also in case of regional conflict with china, one task fleet should be positioned at Yellow Sea and for regional conflict with Japan and Russia, one task fleet should be deployed at East Sea. Realistically, Unified Korea cannot possess an air force equal to neither Japan nor China in quantity. Therefore, although Unified Korea's air force might be inferior in quantity, they should possess the systematic level which Japan or China has. For this Unified Korea should build air base in island areas like Jeju Island or Ullenong Island to increase combat radius. Also to block off infiltration of enemy attack plane, air force needs to build and manage air bases near coastal areas. For landing operation forces, Marine Corps should be managed in the size of two divisions. For island defense force, which is in charge of Jeju Island, Ulleung Island, Dokdo Island and five northwestern boarder island defenses, it should be in the size of one brigade. Also for standing international peace keeping operation, it requires one brigade. Therefore Marine Corps should be organized into three divisions. The result of the research yields a few policy implications when building appropriate military strength for Unified Korea. First, Unified Korea requires lower number of ground troops compared to that of current ROK(Republic of Korea) force. Second, air-sea forces should be drastically reinforced. Third, appropriate military strength of the Unified Korean military should be based on current ROK military system. Forth, building appropriate military strength for Unified Korea should start from today, not after reunification. Because of this, South Korea should build a military power that can simultaneously prepare for current North Korea's provocations and future threats from neighboring countries after reunification. The core of this research is to decide appropriate military strength for Unified Korea to realize relative balance that will ensure defense sufficiency from neighboring countries threats. In other words, this research should precisely be aware of threats posed by neighboring countries and decide minimum level of military strength that could realize relative balance in conflict situation. Moreover this research will show the path for building appropriate military strength in each armed force.

  • PDF

Mathematics Curriculum Reform and Power: A Case Study

  • Zhang, Xiaogui
    • Research in Mathematical Education
    • /
    • v.11 no.1
    • /
    • pp.53-63
    • /
    • 2007
  • Mathematics curriculum reform is very important, and it can be understood well by power. This paper uses the extended Foucault's power theory as foundations to view mathematics curriculum reform. The research's case is China's ongoing mathematics curriculum reform. Through analyzing the power relationships in China's ongoing mathematics curriculum reform, the paper thinks that power's balance is very important in mathematics curriculum design, because it will affect the designed curriculum.

  • PDF

A Study on the Implementation of High Power Pulse Amplifier with wide-band characteristic (광대역 특성을 가지는 고출력 펄스 전력 증폭기 구현에 관한 연구)

  • Lee, Kyounghak
    • Journal of Satellite, Information and Communications
    • /
    • v.11 no.1
    • /
    • pp.1-5
    • /
    • 2016
  • In this paper, High Power Pulsed Amplifier with wide-band characteristic is implemented for L-band Navigational Aid(NAVAID). Due to the characteristics of L-Band NAVAID, implemented SSPA is demanded characteristics of high RF power, high linearity and high efficiency. Therefore, in this paper, efficiency characteristic is improved by modified class F technique. And linearity characteristic is improved by balance structure using hybrid coupler, $2^{nd}$ & $3^{rd}$ harmonic trap and anti-phase technique using non-linear characteristics of drive amplifier. Implemented SSPA shows that bandwidth of 300MHz, RF Output power of 1.5KW and efficiency of 55%.

High Step-Down Multiple-Output LED Driver with the Current Auto-Balance Characteristic

  • Luo, Quanming;Zhu, Binxin;Lu, Weiguo;Zhou, Luowei
    • Journal of Power Electronics
    • /
    • v.12 no.4
    • /
    • pp.519-527
    • /
    • 2012
  • A high step-down multiple-output LED driver is proposed in this paper. Firstly, the derivation of the driver with dual-output is presented and its operation principle and steady state performance are analyzed in detail. Secondly, a high step-down N-channel LED driver is proposed and its current auto-balance characteristic and step-down ratio are analyzed. Finally, an experimental prototype is built and the experimental results are given. The theoretical analysis and experimental results show that the proposed driver has the following virtues: First, if load balancing is achieved, the voltage gain is 1/N that of a Buck driver, where N is the number of channels. Second, each output automatically has an equal output current, without requiring more current close-loop control circuits than a Buck driver. Last, the voltage stresses of the switches and diodes are lower than those of a Buck driver, meaning that lower voltage switches and diodes can be used, and a higher efficiency can be expected.

A Flyback-Assisted Single-Sourced Photovoltaic Power Conditioning System Using an Asymmetric Cascaded Multilevel Inverter

  • Manoharan, Mohana Sundar;Ahmed, Ashraf;Park, Joung-Hu
    • Journal of Power Electronics
    • /
    • v.16 no.6
    • /
    • pp.2272-2283
    • /
    • 2016
  • This paper proposes a power conditioning system (PCS) for distributed photovoltaic (PV) applications using an asymmetric cascaded multilevel inverter with a single PV source. One of the main disadvantages of the cascaded multilevel inverters in PV systems is the requirement of multiple isolated DC sources. Using multiple PV strings leads to a compromise in either the voltage balance of individual H-bridge cells or the maximum power point tracking (MPPT) operation due to localized variations in atmospheric conditions. The proposed PCS uses a single PV source with a flyback DC-DC converter to facilitate a reduction of the required DC sources and to maintain the voltage balance during MPPT operation. The flyback converter is used to provide input for low-voltage H-bridge cells which processes only 20% of the total power. This helps to minimize the losses occurring in the proposed PCS. Furthermore, transient analyses and controller design for the proposed PCS in both the stand-alone mode and the grid-connection mode are presented. The feasibility of the proposed PCS and its control scheme have been tested using a 1kW hardware prototype and the obtained results are presented.

A Fast Optimization Algorithm for Optimal Real Power Flow (고속의 유효전력 최적조류계산 알고리즘)

  • Song, Kyung-Bin;Kim, Hong-Rae
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.926-928
    • /
    • 1998
  • A fast optimization algorithm has been evolved from a simple two stage optimal power flow(OPF) algorithm for constrained power economic dispatch. In the proposed algorithm, we consider various constraints such as power balance, generation capacity, transmission line capacity, transmission losses, security equality, and security inequality constraints. The proposed algorithm consists of four stages. At the first stage, we solve the aggregated problem that is the crude classical economic dispatch problem without considering transmission losses. An initial solution is obtained by the aggregation concept in which the solution satisfies the power balance equations and generation capacity constraints. Then, after load flow analysis, the transmission losses of an initial generation setting are matched by the slack bus generator that produces power with the cheapest cost. At the second stage we consider transmission losses. Formulation of the second stage becomes classical economic dispatch problem involving the transmission losses, which are distributed to all generators. Once a feasible solution is obtained from the second stage, transmission capacity and other violations are checked and corrected locally and quickly at the third stage. The fourth stage fine tunes the solution of the third stage to reach a real minimum. The proposed approach speeds up the coupled LP based OPF method to an average gain of 53.13 for IEEE 30, 57, and 118 bus systems and EPRI Scenario systems A through D testings.

  • PDF

The Study on the Field test and Operational Method of a Direct Load Control System for Air conditioner (에어컨부하 직접제어시스템 실증시험 및 운용방안에 관한 연구)

  • Gang, Won-Gu;Kim, Chung-Hwan;Kim, Myong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2825-2827
    • /
    • 2000
  • In electric power industry. load balance has been one of the most fundamental and important management goals. Therefore. the strategy to achieve high quality load management now includes load balance besides the stabilization of electricity supply and quality management of electricity. Amongst many techniques of load management. direct load management has been actively studied and utilized to increase power facility and peak load suppression. Higher peak load situation is appeared during summer than during winter in Korea. and approximately 20% of the peak load is due to the load for air-conditioning. To cope with this peak load problem during summer KEPCO is performing a research project to develop a system to remotely control air-conditioning load using wireless communication. Currently, applicable facilities are limited to small-scale air-conditioning facility that has less than 2KW power capacity. This paper described the 1st year of efforts made in the study.

  • PDF

A parallel control algorithm of 3MW EBOP for Molten Carbonate Fuel Cell(MCFC) power plant (3MW급 연료전지용 EBOP의 병렬제어 알고리즘)

  • Hwang, Tai-Sik;Kim, Hyeong-Su;Kim, Yun-Hyun;Kim, Kwang-Seob
    • Proceedings of the KIPE Conference
    • /
    • 2009.11a
    • /
    • pp.120-122
    • /
    • 2009
  • 발전용 연료전지 시스템은 수소와 산소를 공급받아 직류전기와 열로 변화시키는 연료전지 스택, 연료전지 스택에 연료와 공기를 공급해주는 MBOP(Mechanical Balance Of Plant), 연료전지의 출력을 계통에 연계시키는 EBOP(Electrical Balance Of Plant)로 구성된다. EBOP 시스템은 병렬 연결된 1.5MW PCU(Power Conversion Unit)로 구성되며, 각 PCU는 750kW 인버터가 병렬로 구성된다. 본 논문에서는 4병렬로 구성된 3MW급 연료전지용 EBOP의 병렬제어 알고리즘을 소개한다. 제안한 병렬제어 알고리즘은 과도응답이 빠르고 순환전류가 없는 제어특성을 가진다. 그리고 시뮬레이션과 실험으로 제안한 알고리즘의 성능을 확인한다.

  • PDF

An Imrpoved Gate Control Scheme for Overvoltage Clamping under IGBT Series Connection (IGBT 직렬 연결시 과전압 제한을 위한 게이트 구동기법)

  • Kim, Wan-Jong;Choe, Chang-Ho;Hyeon, Dong-Seok
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.48 no.2
    • /
    • pp.83-88
    • /
    • 1999
  • Series connection of power semiconductor devices is selected in high voltage and high power applications. It is important to prevent the overvoltage from being induced across a device above ratings by the proper voltage balancing in the field of IGBT series connection. In addition, the overvoltage induced by a stray inductance has to be limited in the high power circuit. This paper proposes a new gate control scheme which can balance the voltage properly and limit the overshoot by controlling the slope of collector voltage under the turn-off transient in the series connected IGBTs. The proposed gate control scheme changes the slope of collector voltage by sensing the collector voltage and controlling the gate signal actively. The new series connected IGBT gate driver is made and its validity is verified by the experimental results for series connected IGBT circuit.

  • PDF