• 제목/요약/키워드: Potential Cost

검색결과 1,815건 처리시간 0.028초

유연생산시스템에서 절삭공구 비용절감을 위한 가공시간과 팔렛배분의 최적화 (Saving Tool Cost in Flexible Manufacturing Systems: Joint Optimization of Processing Times and Pallet Allocation)

  • 김정섭
    • 한국경영과학회지
    • /
    • 제23권4호
    • /
    • pp.75-86
    • /
    • 1998
  • We address the problem of determining the optimal processing times and pallet/fixture allocation in Flexible Manufacturing systems in order to minimize tool cost while meeting throughput targets of multiple part types. The problem is formulated as a nonlinear program superimposed on a closed queueing network of the FMSs under consideration. A numerical example reveals the potential of our approach for significant cost saving. We argue that our model can be Integrated Into the process planning system of an FMS to generate efficient process plans quickly.

  • PDF

퍼지기반 해양 미생물 이용 수소 제조 공정의 고장유형 및 영향분석 (Fuzzy Based Failure Mode and Effect Analysis (FMEA) of Hydrogen Production Process Using the Thermococcus Onnurineus NA1)

  • 박성호;안준건;김수현;유영돈;장대준;강성균
    • 한국수소및신에너지학회논문집
    • /
    • 제29권4호
    • /
    • pp.307-316
    • /
    • 2018
  • In this study, the failure mode and effect analysis (FMEA) of hydrogen production process by using the Thermococcus onnurineus NA1 was conducted and advanced methodology to compensate the weakness of previous FMEA methodology was applied. To bring out more quantitative and precise FMEA result for bio-hydrogen production process, fuzzy logic and potential loss cost estimated from ASPEN Capital Cost Estimator (ACCE) was introduced. Consequently, risk for releasing the flammable gases via internal leakage of steam tube which to control the operating temperature of main reactor was caution status in FMEA result without applying the fuzzification and ACCE. Moreover, probability of the steam tube plugging caused by solid property like medium was still caution status. As to apply the fuzzy logic and potential loss cost estimated from ACCE, a couple of caution status was unexpectedly upgraded to high dangerous status since the potential loss cost of steam tube for main reactor and decrease in product gases are higher than expected.

랜덤 심볼에 기반한 정보이론적 학습법의 스텝 사이즈 정규화 (Step-size Normalization of Information Theoretic Learning Methods based on Random Symbols)

  • 김남용
    • 인터넷정보학회논문지
    • /
    • 제21권2호
    • /
    • pp.49-55
    • /
    • 2020
  • 랜덤 심볼열을 기반으로 한 정보이론적 학습법 (ITL)은 특정 확률분포를 갖도록 랜덤하게 발생시킨 심볼열을 타겟 데이터로 활용하고, 입력 데이터 사이의 확률분포 거리 최소화를 비용함수로 하여 설계된다. 이 방식의 단점으로, 고정상수를 알고리듬 갱신의 스텝사이즈로 사용하므로 입력 전력의 통계적 추이를 활용할 수 없다. 정보포텐셜 출력(information potential output, IPO)와 연관된 기울기에서는 정보포텐셜 입력(information potential input, IPI)이, 정보포텐셜 오차(information potential error, IPE)와 관련된 기울기에서는 입력자체가 입력으로 작용함을 이 연구에서 밝혀내고, 입력의 전력 추이를 따로 계산하여 스텝사이즈 (step size)를 정규화하도록 제안하였다. 제안된 알고리듬은 충격성잡음과 다중경로 페이딩 환경의 통신시스템 실험에서 기존 방식보다 약 4dB 정도 더 낮은 정상상태 오차 전력, 약 2배 이상 빠른 수렴속도를 나타냈다.

공통중성선 3상4선식 배전선로의 중성선 전위상승에 관한 연구 (Researches on the Potential Rises on the Neutral Line in Three Phase, Four-Wire Distribution Line Systems)

  • 박영문
    • 전기의세계
    • /
    • 제18권6호
    • /
    • pp.23-32
    • /
    • 1969
  • The thesis has derived the formulas and computational algorithms useful for predicting and constraining the potential rises on the neutral line in 3-phase, 4-wire distribution line systems in the case of contact faults and single-line grounding faults. In addition it has suggested economically optimal designing conditions herewith of the distribution line systems in conduction with the potential restraining cost functions.

  • PDF

건설업 안전관리 효과분석에 관한 실증적 연구 (An Analysis of Safety Control Effectiveness in Construction)

  • 갈원모;손기상;채준석
    • 한국안전학회지
    • /
    • 제11권1호
    • /
    • pp.121-128
    • /
    • 1996
  • Estimating the cost of injuries and "accidents" to an organization is very important to figure out about how much well each organization has run his company and how much efficiently he has got the results using a certain amount of the expense for safety. Despite the potential usefulness to management of information as to the cost of a company's "accidents", it is not customary accounting practice to make these data available. Of the two general kinds of costs forced on a company by its occupational injuries and "accidents", the insurance cost and uninsured cost, -the former is by far the easier to find out. But actually, this uninsured cost should be figured out at each company. Authors have designed the generalized model to figure out the above problem costs to establish its efficient safety control. One construction company has been a pilot for this study. It is found that efficient safety control cost should be 1.2%~l.3% of total selling amount by analyzing actual data for three years.g actual data for three years.

  • PDF

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • 제16권2호
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

실적공사비 적산 시스템 운영을 위한 실적 자료 관리 시스템 개발(구조 및 재료 \circled1) (Development of the Historical Data Management System for using the Cost Estimate System)

  • 정연철;배연정;윤성수;이정재
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2000년도 학술발표회 발표논문집
    • /
    • pp.239-245
    • /
    • 2000
  • This study is aimed to develop the historical data management system named "ACON"(Actual COst Network system) which can be used for collecting, analysis and modification of the historical data. ACON_Local is used for collecting the historical data at each spot place. It redueces the work potential of managers, spending time and cost. ACON_Analysis is to analyze the collection , modifies the data′s error and updates the historical database. ACON_Network is developed to transfer data from ACON to Web server or opposites. The proposed model, ACON, provide the easy way for the cost estimate system, "HiCOMS" to collect, analyze and modify the historical cost evaluated data, which is used to compose the historical data base.

  • PDF

Cost Analysis of Vertical Greenery in Urban Complex

  • Dong, Nannan;Huang, Fang
    • 국제초고층학회논문집
    • /
    • 제10권1호
    • /
    • pp.29-34
    • /
    • 2021
  • Vertical greenery has become an important technological means to improve the ecological environment condition in urban high-density areas, especially in central areas of Chinese cities. The cost of vertical greenery has significantly increased both in the decision-making process of architectural design and in the assessment of the sustainability potential of urban complexes. The estimation and evaluation of the cost of vertical greenery have become important obstacles to multi-party investment in the construction of vertical greenery. Considering the factors of the building typology and full life-cycle cost, this paper constructs an assessment model of vertical greenery in seven types in urban complex, and suggests an optimized approach to vertical greenery in an urban complex.

SLAM 기술을 활용한 저가형 자율주행 배달 로봇 시스템 개발 (Development of Low Cost Autonomous-Driving Delivery Robot System Using SLAM Technology)

  • 이동훈;박제현;정경훈
    • 대한임베디드공학회논문지
    • /
    • 제18권5호
    • /
    • pp.249-257
    • /
    • 2023
  • This paper discusses the increasing need for autonomous delivery robots due to the current growth in the delivery market, rising delivery fees, high costs of hiring delivery personnel, and the need for contactless services. Additionally, the cost of hardware and complex software systems required to build and operate autonomous delivery robots is high. To provide a low-cost alternative to this, this paper proposes a autonomous delivery robot platform using a low-cost sensor combination of 2D LIDAR, depth camera and tracking camera to replace the existing expensive 3D LIDAR. The proposed robot was developed using the RTAB-Map SLAM open source package for 2D mapping and overcomes the limitations of low-cost sensors by using the convex hull algorithm. The paper details the hardware and software configuration of the robot and presents the results of driving experiments. The proposed platform has significant potential for various industries, including the delivery and other industries.

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • 한국건설관리학회논문집
    • /
    • 제8권5호
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.