• 제목/요약/키워드: Portal slope

검색결과 26건 처리시간 0.027초

지형과 사교하는 갱구부의 비탈면 최소화 방안 연구 (A Study on the Minimization of Cutting Slope around Tunnel Portal)

  • 정관식;박지훈;김건호;이완재
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.359-371
    • /
    • 2005
  • The Cutting slope is to be minimized when a tunnel meets the contour of slope terrain at a right angle around its portal. However, a tunnel portal has been generally installed at a right angle to the longitudinal axis of a tunnel with no consideration of the intersection angle with the slope terrain. This sometimes tended to cause huge cutting slope that resulted in many disadvantage in terms of safty, economy and environment. Therefore, the minimization of cutting slope is studied by taking the intersection angle into account, and the result is compared with that by the conventional method. In addition a design method for the inclined portal to the tunnel axis is proposed through 3D-FEM analysis, also the applicable ground condition is suggested.

  • PDF

Numerical analysis on stability of express railway tunnel portal

  • Zhou, Xiaojun;Hu, Hongyun;Jiang, Bo;Zhou, Yuefeng;Zhu, Yong
    • Structural Engineering and Mechanics
    • /
    • 제57권1호
    • /
    • pp.1-20
    • /
    • 2016
  • On the basis of the geological conditions of high and steep mountainous slope on which an exit portal of an express railway tunnel with a bridge-tunnel combination is to be built, the composite structure of the exit portal with a bridge abutment of the bridge-tunnel combination is presented and the stability of the slope on which the express railway portal is to be built is analyzed using three dimensional (3D) numerical simulation in the paper. Comparison of the practicability for the reinforcement of slope with in-situ bored piles and diaphragm walls are performed so as to enhance the stability of the high and steep slope. The safety factor of the slope due to rockmass excavation both inside the exit portal and beneath the bridge abutment of the bridge-tunnel combination has been also derived using strength reduction technique. The obtained results show that post tunnel portal is a preferred structure to fit high and steep slope, and the surrounding rock around the exit portal of the tunnel on the high and steep mountainous slope remains stable when rockmass is excavated both from the inside of the exit portal and underneath the bridge abutment after the slope is reinforced with both bored piles and diaphragm walls. The stability of the high and steep slope is principally dominated by the shear stress state of the rockmass at the toe of the slope; the procedure of excavating rockmass in the foundation pit of the bridge abutment does not obviously affect the slope stability. In-situ bored piles are more effective in controlling the deformation of the abutment foundation pit in comparison with diaphragm walls and are used as a preferred retaining structure to uphold the stability of slope in respect of the lesser time, easier procedure and lower cost in the construction of the exit portal with bridge-tunnel combination on the high and steep mountainous slope. The results obtained from the numerical analysis in the paper can be used to guide the structural design and construction of express railway tunnel portal with bridge-tunnel combination on high and abrupt mountainous slope under similar situations.

국내 일반국도 터널 갱구사면 특성 통계 분석 (Statistical Analysis about Characteristics of Tunnel Portal Slopes on the National Highway in Korea)

  • 권오일;백용;구호본;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.745-750
    • /
    • 2005
  • The demand of tunnels has been increased for the linear improvement of general national highway, and road construction and/or enlargement in Korea. Also, the collapses of tunnel portal slope have been increased in recent due to heavy rain caused by global warming. Therefore, it has been risen the requirement of system for the stability of tunnel portal slope in Korea as well as all over the world. The objective of this research is to develop an effective maintenance system for supervising the tunnel portal slope. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed along general national highways.

  • PDF

수평 아치형 터널 갱구부 비탈면의 역학적 거동 (Mechanical Behavior of Tunnel Portal in Horizontal Arch Slope)

  • 양문상;이상덕
    • 한국터널지하공간학회 논문집
    • /
    • 제2권2호
    • /
    • pp.50-61
    • /
    • 2000
  • 터널의 갱구부는 터널에서 3차원 거동을 가장 뚜렷하게 보이는 부분이며 대체로 풍화가 진행되어 거의 토사화되어 있는 취약한 암반에 시공됨에 따라 비탈면은 잠재적인 활동체가 되게 된다. 터널 갱구부 비탈면에서 안정에 위해되는 요인이 발생했을 경우 파괴가 급속히 진행되어 대형사고로 이어질수 있으므로 특별한 안정화 대책이 필요하여 경제적으로 큰 부담이 된다. 이를 해결하기 위한 방안으로 갱구부 비탈면을 수평 아치형으로 굴착하게 되면 굴착량이 줄어서 경제적이고 자연훼손이 줄어들며 보다 안전하고 아름다운 형상을 기대할 수 있다. 그러나 인식부족으로 인하여 이와 같은 시도는 거의 이루어지지 않고 있어서 면벽식 갱구부가 보편화 되어 있는 실정이다. 본 연구에서는 아치형 갱구부 비탈면의 이점을 알아보기 위하여 3차원 수치해석을 ㄷ형과 아치형 비탈면에 대하여 각각 수행하여 그 결과를 서로 비교하였으며 터널 굴진과 암반강성에 따른 갱구부 비탈면의 안정성은 비탈면에서 발생되는 최대전단변형율과 막장면에서 터널굴진에 따른 소성접근도를 분석하여 검토하였다.

  • PDF

여수-순천 도로확장공사 구간 $\bigcirc\bigcirc$터널 붕괴사면 지반특성 (Geotechnical characteristics of the collapsed $\bigcirc\bigcirc$tunnel slope in Yeosu-Suncheon area)

  • 김승현;구호본;이정엽;이종현;김승희
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.848-857
    • /
    • 2008
  • In September 2007, the collapses of slopes and landslides are happened at Jeonlanamdo due to heavy rains accompanied with Typoon "Nari". The study area is the tunnel portal slope in new road construction site. This slope consists of pyroclastic rocks and has lots of faults. Particularly, the residual soils of the slope is deteriorated with yellowish mudstone layer as a results of chemical and physical weathering. This has a variety of swelling clay minerals and might be moved easily down at the gentle terrain. The inner factor of $\bigcirc\bigcirc$tunnel portal slope's collapse is the geological weak zone, the convergent topography, the inferiority of drainage and the heavy rain act on the failure as direct trigger.

  • PDF

국내 터널 갱구사면 데이터베이스관리 시스템 개발 및 상태평가 기법에 관한 연구 (Study on development of data base system and pattern analysis of tunnel portal slope in Korea)

  • 백용;권오일;구호본;배규진;이승호
    • 한국터널지하공간학회 논문집
    • /
    • 제6권3호
    • /
    • pp.213-225
    • /
    • 2004
  • 일반 국도의 선형개량사업 및 도로 확포장 사업의 일환으로 터널의 수가 증가하고 있는 실정이다. 최근들어 집중호우 및 이상기후로 인하여 국지적인 강우가 발생하여 갱구사면의 붕괴도 적지 않게 발생하고 있다. 따라서, 국내의 터널 갱구사면 피해 및 유지관리를 효율적으로 대처할 필요성이 대두되었다. 본 연구는 일반국도변에 기설치 운영되고 있는 터널 갱구사면의 현황 및 상태에 대한 조사를 실시하고 수집된 데이터의 효율적인 관리를 위한 데이터베이스 시스템을 개발, 향후 유지관리를 위한 상태평가 기법을 개발하는 것이다. 연구방법으로는 국도변의 터널 갱구사면의 형태를 분석하기 위하여 현장 조사를 통하여 국내의 터널을 진입형태, 갱문형식, 터널 유형 등 기하학적인 형태에 따른 분석을 실시하였다. 수집된 자료의 효율적인 관리를 위해서 그래픽 사용자 인터페이스를 사용하여 입력, 수정 및 조회가 가능한 데이터베이스 관리 시스템을 개발하였고, 조사된 갱구사면의 위험상태에 대한 등급을 분류하기 위한 상태평가 기준표를 제시하고 이에 따른 등급을 분류하였다. 본 상태평가를 이용하여 국도변의 터널 갱구사면을 분류하여 위험 등급에 따라 향후 지속적으로 유지 관리를 실시할 수 있도록 기초자료로 활용하고자 하는 것이 주 목적이다.

  • PDF

급경사 지형에 위치하고 있는 갱구부의 굴착 방안 연구 (A Study on the Excavation of Tunnel Portal Zone Located at High Steep Slope)

  • 김우성;이상은
    • 화약ㆍ발파
    • /
    • 제26권2호
    • /
    • pp.38-44
    • /
    • 2008
  • 최근에 국내의 도로건설계획은 기존도로의 선형을 개량하거나 변경하는 데에 중점을 두므로, 건설하고자 하는 도로는 보다 현재 직선화되고 있는 추세이다. 국내의 지형은 대부분 산악지로 구성되어 있어 도로선형의 직선화에 따라 많은 교량과 터널의 계획이 불가피하며, 일부 산악터널의 갱구부는 터널굴착시 작업공간이 협소한 가파른 지형을 갖는 산안 계곡에 위치하는 경우가 있다. 이와 같이 가파른 지형에 터널 갱구부 굴착시 대안으로 역방향 굴착을 들 수 있는데, 3가지의 중요한 고려사항이 있다. 첫째, 적정한 폭, 높이, 그리고 길이로 Pilot 터널을 계획하는 것이며, 둘째, 터널 갱구부의 편토압에 대한 영향을 평가하는 것이고, 셋째, 갱구부의 얕은 심도의 지반조건에 대한 터널 안전성을 확보하는 것이라고 할 수 있다. 따라서 본 연구는 3차원 수치해석에 의해 얻어진 결과를 토대로 역방향 굴착의 적정성 및 Pilot 터널의 적용 범위를 제안코자 한다. 해석결과 Pilot 터널은 터널 안쪽 $20{\sim}25m$ 지점 전부터 갱구부 쪽으로 굴착하는 것이 적정함을 보이고 있다.

터널 갱구지역 사면안정성 및 산사태 위험도 평가 (Slope stability analysis and landslide hazard assessment in tunnel portal area)

  • 정해근;서용석
    • 한국터널지하공간학회 논문집
    • /
    • 제15권4호
    • /
    • pp.387-400
    • /
    • 2013
  • 본 연구에서는 터널 갱구사면을 대상으로 사면안정성 및 산사태 위험도를 평가하였다. 먼저 사면안정성 해석을 통해 붕괴위험도가 가장 높은 구간을 선정하고 구체적인 붕괴규모를 파악하였다. 해석결과 해발고도 485~495 m인 구간은 강우시 안전율이 0.99로 불안정한 상태로 나타났다. 이 때 붕괴심도는 최대 2.1 m이며 붕괴 길이는 사면의 경사방향으로 18.6 m로 분석되었다. 해당구간에서 사면붕괴 시 파생되는 사태물질의 이동특성을 실시간으로 분석하고 터널 갱구부에 미치는 영향을 파악하고자 산사태 시뮬레이션 해석을 수행하였다. 해석결과 사태물질은 7.74 m/sec의 평균속도를 보이며 주로 계곡부를 따라 산 하부로 이동하는 것으로 분석되었다. 사태물질은 산 하부로 갈수록 점차 확산되며 10초 후에 터널 갱구부 위를 지나고 20.2초 후에 산하부에 도달하는 것으로 분석되었다. 특히 터널 갱구부는 사태물질 이동경로의 중심부에 위치하고 있어 산사태 발생 시 직접적인 피해를 받는 것으로 나타났다.

터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로 (A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site)

  • 백용;구호본;유기정
    • 지질공학
    • /
    • 제12권4호
    • /
    • pp.367-378
    • /
    • 2002
  • 최근 국도가 4차선 선형 개량화 되는 과정에서 일반국도 내 터널 수가 증대되고 있으며 터널 갱구부의 사면 붕괴도 적지 않게 보고되고 있다. 운용중 터널 갱구부 사면 붕괴는 절토사면과는 달리 시공성 및 대책공법 선정의 한계성을 가지고 있다. 본 연구에서는 2002년 4월 발생한 수안보 온천 1, 2터널붕괴 현장을 대상으로 정밀 현장조사를 실시, 안정성 해석에 따른 효율적인 보강공법에 대해 검토한 것이다. 연구방법으로는 붕괴 현장의 정밀 지질조사를 통하여 붕괴 원인 분석 및 지반강도정수 산정을 위하여 현장 조사 및 붕괴 현장에 대한 역해석을 실시 지반강도정수를 추정하였다. 암반사떤의 안정성 해석을 위하여 불연속면의 영향을 고려하여 평사투영법을 실시하였으며, 안전율을 산정을 위하여 Tarlen을 이용한계평형해석을 실시하였다. 연구결과, 수안보 온천 1터널의 경우, 사면경사완화공법을 2터널의 경우는 3개의 영역으로 구분 콘크리트 버트리스 및 보강공법으로 록앵커 시공, 결착식 낙석방 지망을 설치하는 방안이 제시되었다.

터널 입구부 대절토 사면 안정성 사례 연구 (Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal)

  • 박동순;배종섬
    • 지질공학
    • /
    • 제25권1호
    • /
    • pp.115-129
    • /
    • 2015
  • 대단면 터널 입구부의 대절토 사면은 불안정한 응력분포 및 소성변형 가능성으로 인해 잠재적 취약부로 인식되고 있다. 본 사례연구에는 대단면 터널 갱구부 대절토 사면의 강우 후 유실사고 및 원인규명, 복구공법을 분석하여 제시하였다. 대상 현장은 46 mm의 강우 후 암반의 불연속면을 따라 대규모 평면파괴가 발생하였으며, 상부 절토사면의 불안정을 야기하였다. 지질조사 및 매핑 자료 분석 결과, 붕괴 원인은 풍화된 암반의 불연속면에 협재된 충전물과 지반 포화로 인한 절리면 연화(softening)로 판단되었다. 알칼리 장석이 풍부한 화강편마암은 풍화에 취약한 것으로 나타났다. 침하량 계측자료 분석 결과, 붕괴 직전에 급격한 변위량 증가를 관찰하였으며, 향후 사면 계측관리에 활용할 수 있을 것으로 판단된다. 응급복구 대책으로 콘크리트 공동충전 및 외부로부터 압성토 채움을 성공적으로 시행하였다. 항구복구 대책으로 사면부에는 격자블럭 및 지중 앵커 시스템을, 터널 측벽부에는 추가 락볼트 보강 및 그라우팅 공법을 성공적으로 적용하였다. 한계평형해석과 평사투영해석을 통해 원 사면의 불안정성과 보강방법의 유효성을 확인하였다. 본 사례연구는 향후 유사한 대절토 사면에 귀중한 참고자료로 활용될 것으로 기대된다.