• Title/Summary/Keyword: Point of view of the arc

Search Result 69, Processing Time 0.032 seconds

Development of simulator by induced contact loss phenomenon for high-speed train operation (고속전철 주행에 따른 이선현상 모의 시뮬레이터 개발)

  • Kim, Jae-Moon;Kim, Yang-Soo;Kim, Chul-Soo;Chang, Chin-Young;Kim, Youn-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.499-503
    • /
    • 2009
  • In this study, the dynamic characteristic of a contact wire and pantograph suppling electrical power to high-speed trains are investigated from an electrical response point of view. To analysis power line disturbance by induced contact loss phenomenon for high speed operation, a hardware Simulator which considered contact loss between contact wire and the pantograph as well as contact wire deviation is developed. It is confirmed that a contact wire and pantograph model are necessary for studying the dynamic behavior of the pantograph system. One of the most important needs accompanied by increasing the speed of high-speed train is reduced that an arc phenomenon by loss of contact brings out EMI. In case of a high-speed train using electrical power, as comparison with diesel rolling stock, PLD(Power Line Disturbance) such as harmonic, transient voltage and current, EMI, dummy signal injection etc usually occurs. Throughout experiment, it is verified that an arc phenomenon is brought out for simulator operation and consequently conducted noise is flowed in electric circuit by power line disturbance.

  • PDF

Development of Expert System for Water Quality Parameter Estimation Using Avenue (Avenue를 활용한 수질매개변수 추정 전문가 시스템 개발)

  • Bae, Duk-Hyo;Han, Gun-Yeon;Choi, Chul-Gwan
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.2
    • /
    • pp.161-171
    • /
    • 2002
  • It has been known that the accurate estimates of 2-dimensional water quality model parameters are difficult for non-experts due to the complexity of theoretical background and input requirement and complicated inter-relationship between model Parameters. The main goal of this study is to Provide expert system for the optimal estimation of water quality model parameters, which is based on the development of chaining mechanism according to the sensitivity analysis of model parameter interactions and GUI interface system on ArcView Avenue. The selected study area is the 35.3- km main Han river starting from Paldang Dam site to the Point of Indo bridge and the tributary inflows including pollutant data are used for the system application and validation. The estimated main model parameters are 0.367 for transverse dispersion coefficient, 0.074 for and 0.162 for. It also shows that the simulated water quality constituents such as DO and BOD based on the estimated model parameters are well agreed with the observed ones. It can be concluded that the developed GIS-based expert system for water quality model parameter estimation and graphical representation of water quality analysis is useful for the scientific water quality management.

The Landscape Interpretation of Joseon Era Gardens in Old West Village, Seoul through the Locational Investigation (서울 서촌지역 조선조 원림의 위치추적을 통한 경관 해석)

  • Kim, Han-Bai;Lee, Seung-Hee
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.168-182
    • /
    • 2014
  • Several Sungsi Gardens were built up in Old West Village during the period of the Joseon Dynasty. Most of them were painted as True-View landscape painting. This study aims at examining original locations of representative gardens of the Old West Village by empirical investigation of related True-View landscape paintings. It seeks to demonstrate the garden landscape in True-View landscape painting by utilizing ArcGIS, 3D topographic modeling to observe geographical locations and landscape more realistically. After forming 3D topographic modeling of estimated locations of the gardens, location of objects at composition of 3D modeling similar to True-View landscape painting was found by shifting viewpoints. And by overlapping the cadastral map on the modeling, we could verify the current lot number of the garden sites. The interpretation of processes and results are as follows. In the early stage, Chungpunggye garden was built at the very end of Mt. InWang valley. The site is hidden from the outside, and appeared as 'Enclosed Landscape'. In the middle stage, Chunghuigak garden was built between Okryu-dong valley and the surrounding ridge. It appeared as 'Semi-Opened Landscape'. In the late stage, Seowon garden was built at the highest level of the ridge among the research areas. It appeared as 'Prospective Landscape'. In the last period, Songsukwon garden, was built at a point of contact of the ridge end and surrounding residential area. So it appeared as 'Opened Landscape' to the town. In other words, the location, landscape and social function of the gardens in Old West Village had been gradually opened in Joseon Dynasty.

The measurement of three-dimensional temporal behavior according to the pressure in the plasma display panel (플라즈마 디스플레이 패널의 압력별 3차원 시간 분해 측정)

  • Kim, Son-Ic;Choi, Hoon-Young;Lee, Seok-Hyun;Lee, Seung-Gol
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1628-1630
    • /
    • 2002
  • In this paper, we measured 3-dimensional temporal behavior of the light emitted from discharge cell of plasma display panel(PDP) as a function of the pressure using the scanned point detecting system. The detected light signal through the PM tube is sent on the oscilloscope and oscilloscope which is connected to PC with GPIB. The whole system is controlled by a PC. From the temporal behavior results, we could analyze the discharge behavior of panel with Ne-Xe(4%) mixing gas and 300torr, 400torr, 500torr pressure. The top view of panel shows that the discharge moves from inner edge of cathode electrode to outer cathode electrode forming arc type. At the 300torr, initial emission time is very fast. The side view of panel shows that the light is detected up to $150{\mu}m$ height of barrier rib. In the panel of 300torr, emission distribution is wider than the others.

  • PDF

Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc (팬터그래프와 전차선간 최소 이선아크 지속시간에 따른 이선율 변화량 분석)

  • Park, Young;Lee, Kiwon;Kwon, Sam-Young;Park, Chulmin;Kim, Jae-Kwang;Choi, Won Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.855-859
    • /
    • 2014
  • Quality criteria for interaction between a pantograph and overhead contact wire is a most important requirement to assess of the performance for the current collection system. Interaction performance between pantograph and catenary system is subject to approval by the infrastructure manager when a new design and contraction of overhead contact line and pantograph are installed. Among the various performance, percentage of arcing at maximum line speed is a simple test method compared with contact force of pantograph due to direct sensing of pantagraph, calibrations, installations of train, and etc. On the other hand, percentage of arcing is need to reliable arcing detector and general requirements with accordance with EN 50317. In this paper, percentage of arcing are investigated on the function of duration of arc and proposed which is satiable of percentage of arcing. As a results, we proposed which duration of arcs are unsuitable from infrastructures point of view as performance testing for quality of current collection.

A New High Frequency Linked Soft-Switching PWM DC-DC Converter with High and Low Side DC Rail Active Edge Resonant Snubbers for High Performance Arc Welder

  • Kang, Ju-Sung;Fathy, Khairy;Saha, Bishwajit;Hong, Doo-Sung;Suh, Ki-Young;Lee, Hyun-Woo;Nakaoka, Mutsuo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2006.05a
    • /
    • pp.399-402
    • /
    • 2006
  • This paper presents a new circuit topology of dc bus line switch-assisted half-bridge soft switching PWM inverter type dc-dc converter for arc welder. The proposed power converter is composed of typical voltage source half-bridge high frequency PWM inverter with a high frequency transformer link in addition to dc bus line side power semiconductor switching devices fer PWM control scheme and capacitive lossless snubbers. All the active power switches in the half-bridge arm and dc bus lines can achieve ZCS turn-on and ZVS turn-off commutation operation and consequently the total turn-off switching losses can be significantly reduced. As a result, a high switching frequency of using IGBTs can be actually selected more than about 20 kHz. The effectiveness of this new converter topology is proved for low voltage and large current dc-dc power supplies such as arc welder from a practical point of view.

  • PDF

Dual Utility AC Line Voltage Operated Voltage Source and Soft Switching PWM DC-DC Converter with High Frequency Transformer Link for Arc Welding Equipment

  • Morimoto Keiki;Ahmed NabilA.;Lee Hyun-Woo;Nakaoka Mutsuo
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.5B no.4
    • /
    • pp.366-373
    • /
    • 2005
  • This paper presents two new circuit topologies of the dc busline side active resonant snubber assisted voltage source high frequency link soft switching PWM full-bridge dc-dc power converters acceptable for either utility ac 200V-rms or ac 400V-rms input grid. These high frequency switching dc-dc converters proposed in this paper are composed of a typical voltage source-fed full-bridge PWM inverter, high frequency transformer with center tap, high frequency diode rectifier with inductor input filter and dc busline side series switches with the aid of a dc busline parallel capacitive lossless snubber. All the active switches in the full-bridge arms as well as dc busline snubber can achieve ZCS turn-on and ZVS turn-off transition commutation with the aid of a transformer leakage inductive component and consequently the total switching power losses can be effectively reduced. So that, a high switching frequency operation of IGBTs in the voltage source full bridge inverter can be actually designed more than about 20 kHz. It is confirmed that the more the switching frequency of full-bridge soft switching inverter increases, the more soft switching PWM dc-dc converter with a high frequency transformer link has remarkable advantages for its power conversion efficiency and power density implementations as compared with the conventional hard switching PWM inverter type dc-dc power converter. The effectiveness of these new dc-dc power converter topologies can be proved to be more suitable for low voltage and large current dc-dc power supply as arc welding equipment from a practical point of view.

An Algorithm for Determining Firing Sequence of Safe Petri Net Using its Matrix Equation (Safe Petri Net의 상태천이행렬식에 의한 비연속시스템의 점화순서 결정 알고리즘)

  • 황창선;이재만
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.40 no.3
    • /
    • pp.299-307
    • /
    • 1991
  • This paper deals with the determination of a firing sequence of transitions in the reachability problem of Safe Petri Net. The determination problem of a firing sequence is very important from the point of practical view, especially in the control of the discrete systems modelled by Safe Petri Net. The determination method of a firing sequence of transitions by means of the matrix equation for the discrete systems modelled by Safe Petri Net is proposed. First, a construction method of the indicence matrix and the firing rule for Safe Petri Net with self-loop are presented by defining the permissive arc in place of self-loop. Next, we develop a method that can find the enable transitions of Safe Petri Net by means of the matrix equation of Safe Petri Net. Finally, by using this method, we propose an algorithm that determines the firing sequence of transitions of Safe Petri Net.

  • PDF

Determination Grid Cell for Estimation of Radar Relationship (레이더 관계식 산정을 위한 격자망 크기 결정)

  • Lee, Won-Ho;Kim, Jin-Geuk
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.5
    • /
    • pp.3-15
    • /
    • 2006
  • The purpose of the study is to determine grid cell of radar relationship, and to promote the radar data on hydrology field. The study region is the Chungjudam basin with a drainage area of $6,648km^{2}$ located within the 260 km circle under the DWSR-88C C-band umbrella(Kwanak Mt Radar). Grid cell was produced to extract radar reflectivity and rainfall data of the same time and point using Arc-view software package. The grid cell size is to estimate mean correlation coefficient for $1km{\times}1km,\;2km{\times}2km,\;3km{\times}3km$ grid. The result of mean correlation coefficient showed good result(0.57) for the $1km{\times}1km$ grid cell. The 32 rainfall stations Z-R relationship was estimated in Chungjudam basin.

ON THE TANGENT SPACE OF A WEIGHTED HOMOGENEOUS PLANE CURVE SINGULARITY

  • Canon, Mario Moran;Sebag, Julien
    • Journal of the Korean Mathematical Society
    • /
    • v.57 no.1
    • /
    • pp.145-169
    • /
    • 2020
  • Let k be a field of characteristic 0. Let ${\mathfrak{C}}=Spec(k[x,y]/{\langle}f{\rangle})$ be a weighted homogeneous plane curve singularity with tangent space ${\pi}_{\mathfrak{C}}:T_{{\mathfrak{C}}/k}{\rightarrow}{\mathfrak{C}$. In this article, we study, from a computational point of view, the Zariski closure ${\mathfrak{G}}({\mathfrak{C}})$ of the set of the 1-jets on ${\mathfrak{C}}$ which define formal solutions (in F[[t]]2 for field extensions F of k) of the equation f = 0. We produce Groebner bases of the ideal ${\mathcal{N}}_1({\mathfrak{C}})$ defining ${\mathfrak{G}}({\mathfrak{C}})$ as a reduced closed subscheme of $T_{{\mathfrak{C}}/k}$ and obtain applications in terms of logarithmic differential operators (in the plane) along ${\mathfrak{C}}$.