• Title/Summary/Keyword: Ploss

Search Result 2, Processing Time 0.013 seconds

Voltage collapse proximity index based on system apparent power loss sensitivity and its application to VAR investment (피상전력 손실감도에 의한 전압붕괴 근접도 지표와 무효전력 투자)

  • 이상중;김건중;김원겸;김용배;엄재선
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.44 no.10
    • /
    • pp.1290-1294
    • /
    • 1995
  • In this paper, a new voltage collapse proximity index (VCPI) based on system apparent power loss sensitivity is proposed. The newly proposed index .lambda.$^{Sloss}$ reaches -.inf. at system voltage collapse point and can be represented by .root..lambda.$^{Ploss}$$^{2}$+.lambda.$^{Qloss}$$^{2}$ where .lambda.$^{Ploss}$ and .lambda.$^{Qloss}$ are the VCPI based on the system active and reactive power loss sensitivity respectively. These indices can be used for the system VAR investment. .DELTA.Q [VAR] is invested, step by step, by the priority of the VCPI index given for each bus. The indices use information from normal power flow equations and their Jacobians. Computation time for deriving .lambda.$^{Sloss}$ is almost same as that for power flow calculation. Two case studies prove the effectiveness of the .lambda.$^{Sloss}$ index and the VAR investment algorithm proposed.

  • PDF

A Study on the System Loss Minimizing Algorithm by Optimal Re-location of Static Condenser Using System Power Loss Sensitivity (계통손실 감소를 위한 전력용 콘덴서의 適正 再配置에 대한 연구)

  • 이상중;김건중;정태호;김원겸;김용배
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.44 no.1
    • /
    • pp.21-24
    • /
    • 1995
  • The larger and the more complicated the system size and configuration grow, the more serious the system loss problem becomes. Exessive system loss causes severs system voltage depression, which even may result in system voltage collapse. This paper proposes an effective tool for minimizing the system power loss by optimal re-location of the static condenser based on the system loss sensitivity index .lambda.$_{Q}$. It is possible to determine the optimal location and amount of VAR investment for minimizing the system loss by priority of .lambda.$_{Q}$ index given for each bus. Several computational techniques for avoiding divergency of the load flow solution are proposed. The loss sensitivity index .lambda.$_{Q}$ uses information of normal power flow equations and their Jacobians. Two case studies proved the effectiveness of the algorithm proposed.posed.

  • PDF