• Title/Summary/Keyword: Plant Projects

Search Result 329, Processing Time 0.035 seconds

Environmental Improvement Effect and Social Benefit of Environmental Impact Assessment: Focusing on Thermal Power Plant (환경영향평가를 통한 화력발전소의 환경개선 효과와 사회적 편익)

  • Kang, Eugene;Kim, Yumi;Moon, Nankyoung
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.3
    • /
    • pp.322-333
    • /
    • 2018
  • This study was carried out to measure atmospheric environmental improvement effect and estimate its social benefit of thermal power plants through Environmental Impact Assessment (EIA) for quantitative analysis about operational performances of EIA. In this study, 'EIA outcome' is defined as whether or not the system is implemented, therefore, environmental standard to be followed by each project and consultation contents were compared. In total 60 cases of thermal power plant construction projects that have been consulted over the past 10 years since 2010, major air pollutants have been significantly reduced after the implementation of EIA. The $PM_{10}$ reduced annual 3,745 tons, $NO_2$ by 74,569 tons, and $SO_2$ by 37,647 tons, which were estimated at approximately 240 billion won~5 trillion 967 billion won per year for social benefit. This means the total cost of power plant operations will be cut to 7 trillion 192 billion won~178 trillion 994 billion won over a 30-year period. The reduced amount of air pollutants emitted by energy generation facilities across the country is worth 50%, and its economic value is larger than the annual Current Health Expenditure in Korea. This is meant by the fact that all projects are subject to uniform criteria under the existing relevant regulation, but that each project plans are optimized according to the characteristics of target areas and projects through the process of EIA.

Selecting plant species for landfill revegetation: a test of 10 native species on reclaimed soils

  • Song, Uhram
    • Journal of Ecology and Environment
    • /
    • v.42 no.4
    • /
    • pp.259-264
    • /
    • 2018
  • Background: Revegetating landfills can be a challenging task as the reclaimed soils are typically dry and have low nutrient content. Therefore, selecting suitable plant species is important for initial revegetation. The issue with current practices (in Korea) is that alien plant species have been typically selected for revegetation projects. In this context, this study selects and tests a set of native plant species for landfill revegetation, accompanied by the assessment of the landfill soils. Results: The soil of the landfill (landfill location) was in a very poor condition with high bulk density and low organic matter and nutrient contents. Among 10 tested species, only Brassica campestris showed high coverage and a sufficient number of individuals in study quadrats sown with seeds. Results suggest that plant species with heavy seeds are the only ones that can adapt to the environment of a typical landfill due to the site's aridity and low nutrient content. The reason is due to such species' superior wind resistance and the capacity to provide sufficient energy for the initial growth of the plants for survival in such landfill environment. Conclusions: This study recommends selecting plant species (1) with arid-adapted features and (2) whose seed weight is sufficiently heavy for survival at landfills or areas with a similar condition for future revegetation.

A Quantity Prediction Model for Reinforced Concrete and Bricks in Education Facilities Using Regression Analysis

  • Lee, Jong-Kyun;Kim, Boo-Young;Kim, Jang-Young;Kim, Tae-Hui;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.506-512
    • /
    • 2013
  • Since the amendment of the law on the private sector investment in social infrastructure in January of 2005, the government has been actively promoting Build-Transfer-Lease (BTL) projects. Notably, most new educational facilities have been built as BTL projects. For these facilities, the unit cost per unit area has been applied to predict construction costs. However, since construction costs are mostly managed after the detailed design phase, the costs can be estimated incorrectly. For this reason, cost management is needed in the planning phase, with a sound approximate estimate to prevent the wasteful use of funds. To address this shortcoming, this study aims to develop a quantity prediction model for education facilities using regression analysis in the planning phase. The developed model is focused on the required quantities of reinforced concrete and bricks. In order to achieve the objective, the data of 44 educational facility projects collected from Gyeonggi-do was used in the regression model. This study can be utilized by major stakeholders to accurately predict construction costs by estimating the appropriate quantities of reinforced concrete and bricks in the planning design phase.

A Study on the Environmental Assessment of Development Projects within Management Zones (관리지역 내 개발사업에 대한 환경성 평가방안 연구)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.114-127
    • /
    • 2010
  • This study aimed at reviewing the case examples of environmental assessment of development projects within management zones, identifying problems and improvement opportunities and suggesting the direction of environmental assessment for management zones that are increasingly segmented Findings showed that first, the assessment of environment soundness in management zones must incorporate the national land environmental map and wide-area ecological axes established by the Ministry of Environment. Second, regarding development activities in management zones, rather than an issue of simply destroying natural environment in a development site itself during a development period, an issue of permanently isolating ecosystems from surrounding areas in a mid/long-term perspective and continually polluting water in mid-stream/upstream regions where sites are located must be considered. Third, in the case of development projects with vast areas, existing plant communities will be disturbed and the naturalness of vegetation will gradually decline due to foreign tree species introduced for landscape architecture. Therefore, creating buffer forests at forest boundaries and planting native tree species that are same as nearby tree species must be examined. Last but not least, when assessing the environmental soundness of management zones, it would be crucial to comprehensively review the environmental, social and locational features of management zones, including surrounding areas, and set the direction of environmental assessment accordingly.

WASTE MANAGEMENT IN DECOMMISSIONING PROJECTS AT KAERI

  • Hong Sang-Bum;Park Jin-Ho
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11b
    • /
    • pp.290-299
    • /
    • 2005
  • Two decommissioning projects are carried out at the KAERI (Korean Atomic Energy Research Institute), one for the Korea research reactors, KRR-1 and KRR-2, and another for the uranium conversion plant (UCP). The concept of the management of the wastes from the decommissioning sites was reviewed with a relation of the decommissioning strategies, technologies for the treatment and the decontamination, and the characteristics of waste. All the liquid waste generated from KRR-1 and KRR-2 decommissioning site is evaporated by a solar evaporation facility and all the liquid waste from the UCP is treated together with lagoon sludge waste. The solid wastes from the decommissioning sites are categorized into three groups; not contaminated, restricted releasable and radioactive waste. The not-contaminated waste will be reused and/or disposed at an industrial disposal site, and the releasable waste is stored for the future disposal at the KAERI. The radioactive waste is packed in containers, and will be stored at the decommissioning sites till they are sent to a national repository site. The reduction of the radioactive solid waste is one of the strategies for the decommissioning projects and could be achieved by the repeated decontamination. By the achievement of the minimization strategy, the amount of radioactive waste was reduced and the disposal cost will be reduced, but the cost for manpower, for direct materials and for administration was increased.

  • PDF

Analyzing Public Preference for Community-Based Floating Photovoltaic Projects: A Discrete Choice Experiment Approach (주민참여형 수상태양광 발전사업에 대한 국민 선호도 분석: 선택실험법을 이용하여)

  • Hye Lee, Lee;JongRoul, Woo
    • Current Photovoltaic Research
    • /
    • v.10 no.4
    • /
    • pp.121-132
    • /
    • 2022
  • The need for floating photovoltaic is being emphasized to expand renewable energy but low residents' acceptance is a major obstacle to the deployment of floating photovoltaic. Using the discrete choice experiment, this study analyzed the preferences for community-based floating photovoltaic projects and proposed a method to increase the residents' acceptance of floating photovoltaic projects. The estimates of the marginal willingness to accept (MWTA) of the distance, the coverage ratio, the landscape, the project owner (public institution), and the project owner (large company) are -0.69%p/km, 0.13%p/%p, -0.57%p, -2.95%p, -1.73%p, respectively. According to the result of simulation analysis, the residents' acceptance is significantly higher when the project is operated by a public institution, with a choice probability of 58%, than when the project is operated by a private company, with a choice probability of 29%, 12% for a large and small company, respectively. In addition, as a result of the analysis of the expected returns, the results show that the closer the distance from the residence to the power plant, the higher the expected return.

Lessons Learned from Application of Systems Engineering to Government Funded Project : Case Study (정부지원 과제의 시스템엔지니어링 적용 교훈 : 사례 연구)

  • Kim, Jin Il;Yeum, Choong Sub;Shin, Joong Uk
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.31-38
    • /
    • 2019
  • The systems engineering standard process is intended to be customized for a given project environment and system characteristics. This study describes the experience gained by applying systems engineering to government-funded projects. The characteristics of government funded project are lack of common development process among the participating organizations and mechanism to determine system requirements. This study describes the contents of the systems engineering activities, including development of operational concept, system requirements, verification requirements (test cases), test verification plan, and implementation of system test and lessons learned from these activities.

Development of CPC/COLSS Simulation Model for YGN#3,4 Simulator

  • Kim, Dong-Wook
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1997.05a
    • /
    • pp.251-256
    • /
    • 1997
  • The safety and reliablity of nuclear power plant operations relies heavily on the plant operators ability to respond to various emergency situations. It has become standard industry practice to utilize simulators to improve the safety and reliability of nuclear power plants operations. The simulators built for Younggwang#3("YGN#3"), which is based on the Korean Standard Nuclear Power Plant ("KSNPP")design, has been developed precisely for this purpose. The YGN#3 simulator is the first simulator in Korea to be developed locally and is now operational on site. A particular attention was placed on the development of CPC/COLLS safety system which is unique to the YGN#3. The effort to develop CPC/COLLS simulation model has been successful and plans exist for applying this model to simulator projects in the future.jects in the future.

  • PDF

A Proposal for Role and Mission of Chemical Engineering Professional Engineer in Pint Engineering Industry in the 21st Century (21세기 플랜트엔지니어링 산업에 있어서의 화공기술사의 기대와 역할)

  • 차순철
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.5
    • /
    • pp.28-32
    • /
    • 2000
  • It is about time for Korean plant engineering industry to evaluate what they have achieved in the past and to foresee how this industry will change in the future. Since the IMF infection in the late 1997, Korean engineering industry has become to realize how important it is to formulate plans and solutions in order to be successful in the EPC industry. Korean plant engineering has accomplished remarkable growth in terms of its sales volumes and sizes of petrochemical & refinery plants they have executed, but unfortunately they have not done a nice job of generating sufficient profits. Many Korean engineering companies have carried out million and billion dollars of "projects" where they unfortunately suffered deficits, and as a result, some companies actually went deteriorated and were merged, and acquired by bigger companies. Based on above philosophy, the ten(10) key factors are suggested regarding a proposal for role and mission of chemical engineering professional engineer in plant engineering industry in the 21\\\" century.

  • PDF

Risk Classification and Relational Database Schema in Overseas Power Plant Construction (해외 발전플랜트 리스크 분류체계 및 관계형 데이터베이스 구축 방안)

  • Kim, Min;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.192-193
    • /
    • 2014
  • Due to the decreasing domestic construction market since 2007, Korean construction companies are expanding overseas market. As a result, the international market share by Korea has been continuously increased and achieved 65.2 billion dollars in 2013. Despite of such visible results, profitability concerns are constantly arising. It is pointed out that the low-priced bid competition between Korean construction companies and various unpredictable risks are the most crucial factors which aggravate the profitability in the overseas projects. From this point of view, predicting the risks in advance and controling them could be the most important tasks to improve the profitability. This research proposed 202 risk factors with a hierarchy and relational database schema for power plant construction, which is based on the 24 risk classifications in previous research (Kim & Jung 2013). Proposed risk classification and relational database schema could be utilized as the basic data in risk management system.

  • PDF