• 제목/요약/키워드: Plant Evaluation

검색결과 2,868건 처리시간 0.031초

International regulatory considerations pertaining to the development of stem cell-based veterinary medicinal products

  • Jeon, Byung-Suk;Yi, Hee;Ku, Hyun-Ok
    • Journal of Veterinary Science
    • /
    • 제22권1호
    • /
    • pp.6.1-6.6
    • /
    • 2021
  • Stem cell-based products (SCPs) are an emerging field of veterinary medicine that focuses on the regeneration, repair, or replacement of damaged tissues or organs. However, there are some issues in applying the traditional regulatory guideline for the approval of SCPs as veterinary medicinal products. This article describes the positions of Korea, US, and EU regarding SCPs, and compares the regulatory guidelines of each country for their safety evaluation. Although there are some differences in the regulatory guidelines, similar considerations in identifying the quality of SCPs and their safety has adopted. Overall, these guidelines need to be harmonized among countries.

컴퓨터 시뮬레이션에 의한 미곡 도정공장의 적정설계 및 개발(II) -미곡 도정시스템의 개발 및 성능평가- (Optimal Design and Development of a Rice Mill Pilot Plant by Computer Simulation (II) -Development and Performance Evaluation of a Rice Mill Pilot Plant-)

  • 정종훈;김보곤;최영수
    • Journal of Biosystems Engineering
    • /
    • 제20권3호
    • /
    • pp.262-274
    • /
    • 1995
  • A rice mill pilot plant was designed and developed in the basis of the simulation results on the mill plants. The performance of the developed rice mill plant was evaluated, and the simulation model on the mill system was validated with the experimental data in the mill plant. The results of this study were as followings : 1. A rice mill pilot plant with the capacity of 0.5 t/h was designed and developed. 2. The hulled ratio of the mill plant was 87.3%, and the milled rice recovery and the head rice recovery of the cleaned rice were 74% and 87% , respectively. The degree of milling of the cleaned rice was 10.6% with a high polish. The intensity of the cleaned rice appeared high compared with that of the milled rice in the analysis of whiteness test using an image processing system. 3. The bottleneck, processing time, and production amount of the developed mill system almost coincided with those of the simulation of the rice mill plant. The developed simulation model of the rice mill plant was proven to be applicable to the design of a rice mill plant through experiments.

  • PDF

원자력발전소(原子力發電所) 가동중(稼動中) 검사(檢査)의 시험분석(試驗分析)을 위한 자동화연구(自動化硏究) (I) (A Study of Automation for Examination Analysis of Inservice Inspection for Nuclear Power Plant (I))

  • 김욱
    • 비파괴검사학회지
    • /
    • 제5권1호
    • /
    • pp.34-47
    • /
    • 1985
  • The developing country, KOREA where does not possess the natural resources for traditional energy such as oil and gas, so. The nuclear energy is the most single reliable source available for closing the energy gap. For these reason, It is inavoidable to construct the nuclear power plant and to develop technology related nuclear energy. The rate of operation in large nuclear power facilities depends upon the performance of work system through design and construction, and also the applied technology. Especially, it is the most important element that safety and reliability in operation of nuclear power plant. In view of this aspects, Nuclear power plant is performed severe examinations during preservice and inservice inspection. This study provide an automation of analysis for volumetric examination which is required to nuclear power plant components. It is composed as follows: I. Introduction II. Inservice Inspection of Nuclear Power Plant ${\ast}$ General Requirement. ${\ast}$ Principle and Methods of Ultrasonic Test. ${\ast}$ Study of Flaw Evaluation and Design of Classifying Formula for Flaws. III. Design of Automation for Flaw Evaluation. IV. An Example V. Conclusion In this theory, It is classifying the flaws, the formula of classifying flaws and the design of automation that is the main important point. As motioned the above, Owing to such as automatic design, more time could be allocated to practical test than that of evaluation of defects, Protecting against subjective bias tester by himself and miscalculation by dint of various process of computation. For the more, adopting this method would be used to more retaining for many test data and comparative evaluating during successive inspection intervals. Inspite of limitation for testing method and required application to test components, it provide useful application to flow evaluation for volumetric examination. Owing to the characteristics of nuclear power plant that is highly skill intensive industry and has huze system, the more notice should be concentrated as follows. Establishing rational operation plan, developing various technology, and making the newly designed system for undeveloped sector.

  • PDF

Comprehensive evaluation method for user interface design in nuclear power plant based on mental workload

  • Chen, Yu;Yan, Shengyuan;Tran, Cong Chi
    • Nuclear Engineering and Technology
    • /
    • 제51권2호
    • /
    • pp.453-462
    • /
    • 2019
  • Mental workload (MWL) is a major consideration for the user interface design in nuclear power plants (NPPs). However, each MWL evaluation method has its advantages and limitations, thus the evaluation and control methods based on multi-index methods are needed. In this study, fuzzy comprehensive evaluation (FCE) theory was adopted for assessment of interface designs in NPP based on operators' MWL. An evaluation index system and membership functions were established, and the weights were given using the combination of the variation coefficient and the entropy method. The results showed that multi-index methods such as performance measures (speed of task and error rate), subjective rating (NASA-TLX) and physiological measure (eye response) can be successfully integrated in FCE for user interface design assessment. The FCE method has a correlation coefficient compared with most of the original evaluation indices. Thus, this method might be applied for developing the tool to quickly and accurately assess the different display interfaces when considering the aspect of the operators' MWL.

350MWe 원자력 발전소의 발전원가 추정 (Power cost evaluation of 350 MWe nuclear power plant)

  • 노윤래
    • 전기의세계
    • /
    • 제16권4호
    • /
    • pp.41-49
    • /
    • 1967
  • This paper covers an estimation and analysis of generating cost of 350MWe nuclear power plant using a pressurized water reactor on the assumption that such a nuclear power plant would be constructed in Korea in or around 1970. For the evaluation of this generating cost, an extensive study has been conducted based on the current information on operating and costing parameters of light water reactors, particularly those of pressurized water reactors. Based on this study, a total generating cost of 7.29 Mills/Kwh was evaluated by operating the plant at 80% plant factor. For this calculation, a steady state method was introduced. It is considered, therefore, that a total generating cost in the beginning of plant operation would be a little higher than 7.29 Mills/Kwh, which has been calculated in the state of equilibrium.

  • PDF

화력발전소 시운전시 인근에 미치는 소음영향 및 대책 (Evaluation and countermeasure for Environmental Noise during Plant Commissioning Process in Thermal Power Plant)

  • 김연환;구재량;김희수;배용채;이현
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 II
    • /
    • pp.897-902
    • /
    • 2001
  • This paper describes the evaluation of noise influence for residental and boundary areas in 75MW thermal power plant. It includes the measurements of noise level around the boundary area of the plant, identification of noise propagating path, and discussion on the measures. Noise assessments are carried out based on the ISO 3744, ISO 9613-1 and ISO 9613-2 to predict the noise distribution of specific locations from the noise sources such as power transformers, flash vent-pipe, I.D.fan, and stack. It is identified the vent-pipe of flash tank in thermal power plant as the root cause of the environmental noise during the plant commissioning process.

  • PDF

1200MW 복합화력 발전소가 부지경계에 미치는 환경소음 예측 (Environmental Noise Evaluation of the Boundary Areas for 1200MW Combined Cycle Power Plant)

  • 이현;김연환;김희수;배용채;김성휘
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 춘계학술대회논문집
    • /
    • pp.1056-1061
    • /
    • 2001
  • This paper describes the evaluation of noise influence of residental and boundary areas from power plant noise sources of 1200MW combined cycle power plant. Noise assessments are carried out by based on the ISO 3744, ISO 9613-1 and ISO 9613-2 to predict the noise distribution to satisfy the recommended noise level at specific locations and to calculate properly the octave noise power of main noise sources such as power transformers. air-intakes, stacks.

  • PDF

제어응용을 위한 지식베이스의 구축 (A Knowledge Base Construction for Control Application)

  • 김도성;이명호
    • 대한전기학회논문지
    • /
    • 제39권7호
    • /
    • pp.720-728
    • /
    • 1990
  • A learning control method is proposed in this paper, using a knowledge base which contains control rules, data, and patterns of the past experience of a plant. The knowledge for plant control is retrieved from measurement data during operation and continually modified after control performance evaluation. A control method is proposed using tinually modified after control performance evaluation. A control method is proposed using fuzzy model of the plant and a recursive statistic decision method of fuzzy subset for control rule generation. Also, the resulting knowledge-based control algorithm has been applied to aprocess and its performance improvement and proper generation of appropriate control rules have been verified.

  • PDF