• Title/Summary/Keyword: Plant Equipment

Search Result 910, Processing Time 0.025 seconds

A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective - (플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 -)

  • Hong, Daegeun;Lim, Yongtaek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.1
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.

Development of the ISO 15926-based Classification Structure for Nuclear Plant Equipment (ISO 15926 국제 표준을 이용한 원자력 플랜트 기자재 분류체계)

  • Yun, J.;Mun, D.;Han, S.;Cho, K.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.3
    • /
    • pp.191-199
    • /
    • 2007
  • In order to construct a data warehouse of process plant equipment, a classification structure should be defined first, identifying not only the equipment categories but also attributes of an each equipment to represent the specifications of equipment. ISO 15926 Process Plants is an international standard dealing with the life-cycle data of process plant facilities. From the viewpoints of defining classification structure, Part 2 data model and Reference Data Library (RDL) of ISO 15926 are seen to respectively provide standard syntactic structure and semantic vocabulary, facilitating the exchange and sharing of plant equipment's life-cycle data. Therefore, the equipment data warehouse with an ISO 15926-based classification structure has the advantage of easy integration among different engineering systems. This paper introduces ISO 15926 and then discusses how to define a classification structure with ISO 15926 Part 2 data model and RDL. Finally, we describe the development result of an ISO 15926-based classification structure for a variety of equipment consisting in the reactor coolant system (RCS) of APR 1400 nuclear plant.

Introduction of Off-Gas Power Plant and Localization Development of Auxiliary Equipment (부생복합발전 소개와 주요설비 국산화를 위한 연구)

  • Ko, Minseok;Kim, Dohyung;Lee, Dongsu;Lee, Seong-geun
    • 한국연소학회:학술대회논문집
    • /
    • 2013.06a
    • /
    • pp.127-128
    • /
    • 2013
  • Off-gas power plant is a renewable energy power plant which generate electrical energy using the low calorie FOG and BFG as main fuel. This combined cycle power plant is comprised of gas turbines, gas compressors, steam turbines, generators, and auxiliary equipment such as gas mixer, mixing tank, and gas cooler. In this paper, a off-gas power plant and development of its several equipment using CFD are introduced.

  • PDF

A Study on Automatic Space Analysis for Plant Facilities Based on 3D Octree Argorithm by Using Laser Scanning Information

  • Kim, Donghyun;Kwon, Soonwook;Chung, Suwan;Ko, Hyunglyul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.667-668
    • /
    • 2015
  • While the plant projects grow bigger and global attention to the plant is increasing, efficient space arrangement is not working in plant project because of the complex structure in installing the equipment unlike the construction project. In addition to this, presently, problem in installation process caused by the disagreement between floor plan and real spot is rising. Therefore the target of this research is to solve the problems and reaction differences, caused by changing the space arrangement in installing the equipment of plant construction. And this research suggests the equipment arrangement method for construction and related processes. To solve the problem, 3D cloud point data of space and equipment is collected by 3D laser scanning and the space matching is operated. In processing the space matching, data is simplified by applying the octree algorithm. This research simplifies the 3D configuration data acquired by 3D scanner equipment through the octree algorithm, and by comparing this data, identifies the space for target equipment, and finally suggests the algorithm that makes the auto space arrangement of equipment possible in construction site and also suggests the process to actualize this algorithm.

  • PDF

Optimum Design of Packaged Skid for Oil & Gas Plant

  • Choi, Hwang-Keun;Shin, H.
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.269-272
    • /
    • 2006
  • The use of packaged skid in oil and gas plant has increased dramatically over the decades, replacing loose supply equipment. Most equipment is installed on structural skid in manufacturer's shop. As Oil and Gas Plants are constructed at inaccessible area, the demands of packaged skids are increased. The packaged skid have advantages comparing to loose supply equipment in inaccessible area. The packaged skid is small complex plant consists of process, mechanical, piping, instrument, electrical and structural steel. This paper examines advantages and problems of packaged skid, based on previous experience. EPC company consider key factors such as manufacturing period, construction periods, equipment quality and costs.

  • PDF

Applications of online simulation supporting PWR operations

  • Wang, Chunbing;Duan, Qizhi;Zhang, Chao;Fan, Yipeng
    • Nuclear Engineering and Technology
    • /
    • v.53 no.3
    • /
    • pp.842-850
    • /
    • 2021
  • Real Time Simulation (RTS) has long been used in the nuclear power industry for operator training and engineering purposes. And, Online Simulation (OLS) is based on RTS and with connection to the plant information system to acquire the measurement data in real time for calibrating the simulation models and following plant operation, for the purposes of analyzing plant events and providing indicative signs of malfunctioning. An OLS system has been developed to support PWR operations for CPR1000 plants. The OLS system provides graphical user interface (GUI) for operators to monitor critical plant operations for preventing faulty operation or analyzing plant events. Functionalities of the OLS system are depicted through the maneuvering of the GUI for various OLS functional modules in the system.

Seismic Verification of Nuclear Power Plant Equipment Anchorage (원전 기기 정착부의 내진검증 기법 사례연구)

  • 서용표
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.10a
    • /
    • pp.215-223
    • /
    • 2000
  • In this study, the effect of stiffness ratio between base frame and anchorgae is evaluated and the seismic verification of nuclear power plant equipment anchorage is performed for typical equipment. The stiffness ratio between base frame and anchorage is mainly controlled by the effective height of side wall plate. And, the change of that stiffness ratio cause the large shift or ovreturning axis of equipment base. This shift of overturning axis of equipment base is able to reduce the factor of safety about 10%. Therefore, the adequate method for evaluating of effective height of side wall is required as further study.

  • PDF

A Study on the Availability Evaluation with Failure Density Function of Equipment of Small-scale Plant (소규모 플랜트 기자재의 고장밀도함수가 가용도에 미치는 영향 평가)

  • Lee, Hongcheol;Hwang, Inju
    • The KSFM Journal of Fluid Machinery
    • /
    • v.19 no.3
    • /
    • pp.33-36
    • /
    • 2016
  • The investigation on the verification of availability simulation for small-scale plant has been carried out. This study focuses on the availability variation induced by number of equipment and iteration with failure density function. The equipment classification of small-scale plant and failure type and the methodologies on Monte-Carlo simulation are established. The availability deviation with programs showed under Max. 1.7% for the case of normal function. This method could be used to availability evaluation of small-scale plant, but calibration of the failure density function is necessary for general application.

Estimation Model-based Verification and Validation of Fossil Power Plant Performance Measurement Data (추정모델에 의한 화력발전 플랜트 계측데이터의 검증 및 유효화)

  • 김성근;윤문철;최영석
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.17 no.2
    • /
    • pp.114-120
    • /
    • 2000
  • Fossil power plant availability is significantly affected by gradual degradations of equipment as operation of the plant continues. It is quite important to determine whether or not to replace some equipment and when to replace the equipment. Performance calculation and analysis can provide the information. Robustness in the performance calculation can be increased by using verification & validation of measured input data. We suggest new algorithm in which estimation relation for validated measurement can be obtained using correlation between measurements. Input estimation model is obtained using design data and acceptance measurement data of domestic 16 fossil power plant. The model consists of finding mostly correlated state variable in plant state and mapping relation based on the model and current state of power plant.

  • PDF

A Study on the Model of Equipment Layout Verification for Offshore Plant Maintenance Equipment Engineering (해양플랜트 유지보수장치 엔지니어링을 위한 장비 배치 검증수행모델에 관한 연구)

  • Han, Seong Jong;Park, Peom
    • Plant Journal
    • /
    • v.13 no.4
    • /
    • pp.41-47
    • /
    • 2017
  • This paper is a study on validation model that can verify the arrangement of equipment constituting offshore plant using system engineering approach in offshore plant tender stage. In order to design offshore plant topside maintenance equipment, topside layout verification should be preceded. However, there are many errors in the bidding stage due to the FEED results that are not perfect, the verification can not be performed sufficiently due to the limitation of the bidding period and others reasons. Therefore, we propose a validation model that can effectively verify the equipment layout within a limited condition by simplifying the main process in the system engineering process, which is a multidisciplinary approach, and confirmed through the Functional Deployment Model. Also, we verified the validation model for topside equipment deployment through case studies.

  • PDF