• 제목/요약/키워드: Planning Management

검색결과 6,139건 처리시간 0.03초

재난 지역 다수 조난자 구조를 위한 최적 경로 계획 알고리즘 연구 (A Study on the Optimal Routing Planning Algorithm for Rescue of Multiple Victims in Disaster Area)

  • 김기태;조성진;전건욱
    • 대한안전경영과학회지
    • /
    • 제12권2호
    • /
    • pp.17-23
    • /
    • 2010
  • The large-scale disasters occur to unexpected accidents such as natural disasters(earthquake, typhoon, tsunami, etc.), and human-caused accidents(fire, collapse, terror etc.). Rescue teams perform rescue activities to save many lives in large-scale disaster area. The main purpose of this study is to compose a optimal routing planning for rescue of multiple victims in disaster area. A realistic routing planning with rescue limit time which considers rehabilitation and reconstruction will be suggested in this study. A mathematical programming model and a hybrid genetic algorithm will be suggested to minimize the total spending time. By comparing the result, the suggested algorithm gives a better solution than existing algorithms.

고속철도차량의 유지보수계획 (Rolling Stock Maintenance Scheduling for High-Sneed Railway)

  • 김동희;홍순흠
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 춘계학술대회
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

무인 항공기 생존성 극대화를 위한 이동 경로 계획 알고리즘 선정 (A Selection of Path Planning Algorithm to Maximize Survivability for Unmanned Aerial Vehicle)

  • 김기태;전건욱
    • 대한안전경영과학회지
    • /
    • 제13권2호
    • /
    • pp.103-113
    • /
    • 2011
  • This research is to select a path planning algorithm to maximize survivability for Unmanned Aerial Vehicle(UAV). An UAV is a powered pilotless aircraft, which is controlled remotely or autonomously. UAVs are currently employed in many military missions(surveillance, reconnaissance, communication relay, targeting, strike etc.) and a number of civilian applications(communication service, broadcast service, traffic control support, monitoring, measurement etc.). In this research, a mathematical programming model is suggested by using MRPP(Most Reliable Path Problem) and verified by using ILOG CPLEX. A path planning algorithm for UAV is selected by comparing of SPP(Shortest Path Problem) algorithms which transfer MRPP into SPP.

Research on a simulation-based ship production support system for middle-sized shipbuilding companies

  • Song, Young-Joo;Wo, Jong-Hun;Shin, Jong-Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제1권2호
    • /
    • pp.70-77
    • /
    • 2009
  • Today, many middle-sized shipbuilding companies in Korea are experiencing strong competition from shipbuilding companies in other nations. This competition is particularly affecting small- and middle-sized shipyards, rather than the major shipyards that have their own support systems and development capabilities. The acquisition of techniques that would enable maximization of production efficiency and minimization of the gap between planning and execution would increase the competitiveness of small- and middle-sized Korean shipyards. In this paper, research on a simulation-based support system for ship production management, which can be applied to the shipbuilding processes of middle-sized shipbuilding companies, is presented. The simulation research includes layout optimization, load balancing, work stage operation planning, block logistics, and integrated material management. Each item is integrated into a network system with a value chain that includes all shipbuilding processes.

원가와 긴급 수요를 고려한 주문형 반도체 공장의 생산계획 연구 (A Manufacturing Plan for Make-to-Order Semiconductor Plant Considering Cost and Urgent Demand)

  • 이소원;전형모;이준환;이철웅
    • 산업공학
    • /
    • 제23권1호
    • /
    • pp.12-23
    • /
    • 2010
  • A semiconductor market is one of the most competitive markets in the world. To survive this competition, important targets for production planning are on-time delivery and profit maximization. In our research, we modify the linear programming model for the current production planning by adding new objective functions that maximize the profit. In addition, we propose a production planning process that gives a priority to new products, reflecting daily fluctuations in demand to weekly production planning. We validate our model with real data sets obtained from a major company semiconductor manufacturer and performed the paired t-test to verify the results. The results showed that our model forecasted profit and loss with 93.2% accuracy and improved the due date satisfaction by 10%.

An Approach to Improve Romanian Geological Repository Planning

  • Andrei, Veronica;Prisecaru, Ilie
    • Nuclear Engineering and Technology
    • /
    • 제48권2호
    • /
    • pp.495-504
    • /
    • 2016
  • International standards recommend typical phases to be included within any national program for the development of a geological repository dedicated to disposal of the high level radioactive wastes generated in countries using nuclear power. However, these are not universally applicable and the content of each of these phases may need to be adapted for each national situation and regulatory and institutional framework. Several national geological repository programs have faced failures in schedules and have revised their programs to consider an adapted phased management approach. The authors have observed that in the case of those countries in the early phases of a geological repository program where boundary conditions have not been fully defined, international recommendations for handling delays/failures in the national program might not immediately help. This paper considers a case study of the influences of the national context risks on the current planning schedule of the Romanian national geological repository. It proposes an optimum solution for an integrated response to any significant adverse impact arising from these risks, enabling sustainable program planning.

가공 안정성을 고려한 작업설계시스템의 개발 (Development of Operation Planning System Considering Machining Safety)

  • 박병태;서지한;김홍재;오영진
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 추계학술대회
    • /
    • pp.421-427
    • /
    • 2008
  • In manufacturing industry, cutting parameters have an influence on reducing the production cost and time and deciding the quality of a final product However, owing to governmental regulations and the change of owner's cognizance, the machining safety becomes important in those fields relatively. The paper presents an intelligent operation planning system considering machining safety for milling operations. The main issue of the system is to determine the cutting parameters in achieving a balanced consideration of productivity and worker's safety. The detailed algorithm and functions of the developed system is introduced and then discussed.

  • PDF

QUANTITATIVE ANALYSES USING 4D MODELS - AN EXPLORATIVE STUDY

  • Rogier Jongeling;Jonghoon Kim;Claudio Mourgues;Martin Fischer;Thomas Olofsson
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.830-835
    • /
    • 2005
  • 4D models help construction planners to develop and evaluate construction plans. However, current analyses using 4D models are mainly visual and limit the quantitative comparison of construction alternatives. This paper explores the usefulness of extracting quantitative information from 4D models to support time-space analyses. We use two 4D models of an industry test case to illustrate how to analyze 4D content quantitatively (i.e., work space areas and distances between concurrent activities). This paper shows how these two types of 4D content can be extracted from 4D models to support 4D-based-analysis and novel presentation of construction planning information. We suggest further research to formalize the content of 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content will enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the information content for informative presentations of construction planning information.

  • PDF

2010년까지의 진료부문 의사인력수급 추계 (The Supply and Demand Projection of Physicians in the Medical Service Area)

  • 박현애;최정수;류시원
    • 보건행정학회지
    • /
    • 제1권1호
    • /
    • pp.136-152
    • /
    • 1991
  • The study was conducted to project supply and demand of the physicians from year 1991 to year 2010 based on the analysis of supply and demand of the physicians up to year 1989. Results of the study will provide information for the physicians manpower planning of the 7th 5-year Economic Social Development Planning(1992-1996) and contribute to the overall health manpower planning for the 21the century. It is projected that physician will be oversupplied from the very near future based on the current productivity or underestimated based on the optimal productivity. Thus, it is desirable not to change size of training and education during the 7the 5-year planning period and re-examine the status of the physician manpower at the end of the 7th 5-year period taking into consideration medical services utilization pattern, patients' satisfaction, and physicians' productivity.

  • PDF

Automated Safety Planning of Scaffolding-Related Hazards in Building Information Modeling (BIM)

  • Kim, Kyungki;Cho, Yong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.255-258
    • /
    • 2015
  • Scaffolds are frequently used in construction projects. Despite the impact on the entire safety, scaffolds are rarely analyzed as part of the safety planning. While recent advances in BIM (Building Information Modeling) provides opportunity to address potential safety issues in the early planning stages, it is still labor-intensive and challenging to incorporate scaffolds into current manual jobsite safety analysis which is time-consuming and error-prone. Consequently, potential safety hazards related to scaffolds are identified and presented during the construction phase. The objective of this research is to integrate scaffolds into automated safety analysis using BIM. A safety checking system was created to simulate the movements of scaffolds along the paths of crews using the scaffolds. Algorithms in the system automatically identify safety hazards related to activities working on scaffolds. Then, the system was implemented in a commercially available BIM software program for case studies. The results show that the algorithms successfully identified safety hazards that were not noticed by project managers of the projects. The results were visualized in BIM to facilitate early safety communications.

  • PDF