• Title/Summary/Keyword: Plan irregularity

Search Result 41, Processing Time 0.022 seconds

Analysis on the Wartime Airlift Capability of Strategic Materials (전시 전략물자 항공수송 능력분석)

  • Lee, Myung-Wo;Lee, Sang-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.36-50
    • /
    • 2006
  • It is required to transport a considerable amount of wartime strategic materials from US to Korea via airlift operation. This study attempts to formulate the wartime airlift operation model and evaluate the airlift capability of mobilized resources, including civil aircrafts. Although an airlift plan has been annually updated by the Korea Transportation Command, it is necessary to evaluate the feasibility through simulation due to uncertainties in the process of airlift operation. Uncertain parameters are as follows; the inter-arrival time of materials in the US airfields, loading and unloading times, the distribution of aircraft's initial location at the time of mobilization order. The simulation is executed under two scenarios and the results are analyzed through a sensitivity analysis. Simulation result shows that the irregularity of inter-arrival time and the number of mobilized civil aircrafts are the most critical factors in influencing airlift capability.

Investigation of Structural Damage in Bearing Wall Buildings with Pilotis by 2017 Pohang Earthquake (2017 포항지진에 의한 필로티형 내력벽건물의 구조손상 분석)

  • Eom, Tae Sung;Lee, Seung Jae;Park, Hong Gun
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.23 no.1
    • /
    • pp.9-18
    • /
    • 2019
  • In 2017 Pohang Earthquake, a number of residential buildings with pilotis at their first level were severely damaged. In this study, the results of an analytical investigation on the seismic performance and structural damage of two bearing wall buildings with pilotis are presented. The vibration mode and lateral force-resisting mechanism of the buildings with vertical and plan irregularity were investigated through elastic analysis. Then, based on the investigations, methods of nonlinear modeling for walls and columns at the piloti level were proposed. By performing nonlinear static and dynamic analyses, structural damages of the walls and columns at the piloti level under 2017 Pohang Earthquake were predicted. The results show that the area and arrangement of walls in the piloti level significantly affected the seismic safety of the buildings. Initially, the lateral resistance of the piloti story was dominated mainly by the walls resisting in-plane shear. After shear cracking and yielding of the walls, the columns showing double-curvature flexural behavior contributed significantly to the residual strength and ductility.

Seismic response of current RC buildings in Kathmandu Valley

  • Chaulagain, Hemchandra;Rodrigues, Hugo;Spacone, Enrico;Varum, Humberto
    • Structural Engineering and Mechanics
    • /
    • v.53 no.4
    • /
    • pp.791-818
    • /
    • 2015
  • RC buildings constitute the prevailing type of construction in earthquake-prone region like Kathmandu Valley. Most of these building constructions were based on conventional methods. In this context, the present paper studied the seismic behaviour of existing RC buildings in Kathmandu Valley. For this, four representative building structures with different design and construction, namely a building: (a) representing the non-engineered construction (RC1 and RC2) and (b) engineered construction (RC3 and RC4) has been selected for analysis. The dynamic properties of the case study building models are analyzed and the corresponding interaction with seismic action is studied by means of non-linear analyses. The structural response measures such as capacity curve, inter-storey drift and the effect of geometric non-linearities are evaluated for the two orthogonal directions. The effect of plan and vertical irregularity on the performance of the structures was studied by comparing the results of two engineered buildings. This was achieved through non-linear dynamic analysis with a synthetic earthquake subjected to X, Y and $45^{\circ}$ loading directions. The nature of the capacity curve represents the strong impact of the P-delta effect, leading to a reduction of the global lateral stiffness and reducing the strength of the structure. The non-engineered structures experience inter-storey drift demands higher than the engineered building models. Moreover, these buildings have very low lateral resistant, lesser the stiffness and limited ductility. Finally, a seismic safety assessment is performed based on the proposed drift limits. Result indicates that most of the existing buildings in Nepal exhibit inadequate seismic performance.

Dynamic Performance Evaluation of New Type PSC Railroad Bridges (신형식 PSC 철도교량의 동적성능 평가)

  • Choi, Sanghyun
    • Journal of the Society of Disaster Information
    • /
    • v.7 no.4
    • /
    • pp.259-265
    • /
    • 2011
  • After the commercial opening of the KTX in 2005, the high speed railroad has been rapidly emerged as the major transportation means due to its high energy efficiency. Recently, the government has announced its plan to build the future transportation system around the high speed railroad. Based on this policy, the existing lines as well as the lines under construction or design are planning to increase design speed. In this paper, the suitability of the mid-span PSC girder bridges for the high speed railroad is evaluated via dynamic analysis. IT, Precom, and WPC girder bridges are considered for the purpose of this study and, for comparison, the identical modeling method and the analysis technique are utilized. The performance indices used for dynamic performance evaluation are the natural frequency, the vertical displacement, the end axial displacement, track irregularity, etc. The KTX train is utilized as a dynamic load, and the dynamic analysis is performed up to the train speed of 420km/hr with the increment of 10km/hr.

A Study on the Dynamic Characteristics on the Test Line for Korean High Speed Train (한국형 고속전철의 주행진동 특성에 관한 연구)

  • 김영국;김석원;박찬경
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.555-560
    • /
    • 2003
  • Korean High Speed Train(KHST) has been tested on the high speed test line in Osung site of Korea High Speed Rail Construction Authority (KHRC). since it was developed as G7 Project Plan In 2002. This paper introduces the dynamic test devices in KHST and shows the comparison between the results of test and theoretical computing results which derive from the new model for KHST dynamic behavior. Previous computer simulation model for KHST was developed to review wether the vehicle system was satisfied with the dynamic performance requirements during the design procedure. But It should be applied the results of the parts test for suspension elements in order to compare between the results of computation and real test. Using VAMPIRE Program made by AEA Technology in UK. the new model also was modified. This paper shows that the static wheel loads calculated from new model is similar to test results. For test on high speed line, we prepared the test devices for evaluating the dynamic performances. which was consisted of the accelerometers( based on Kisler Co.) and the data aquisition systems (based on National instrument Co.), and test program coded by LabView 6i program. These lest devices and programs are flexible to extension the channels for adding sensors and connect to the ethernet network. The acceleration of car bodies, bogie frames and axle boxes were compared between the results of computation and test at 150km/. This paper shows that the results of test were high in high frequency band range but similar frequency band range. It might be considered that these differences were caused by the test which did not performed at constant speed for comparison analysis. Also. It will be able to understand the differences and make better results through a lot of tests planed in future.

  • PDF

An Analysis on the Characteristics of Site Planning and Size of Newly-Built Elementary Schools in Sejong City (세종시 신설 초등학교의 학교규모와 배치특성 분석)

  • Song, Byung-Ha
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.357-366
    • /
    • 2016
  • This study compared 24 newly-built elementary schools in Sejong City regarding the size of the site and school, as well as the outdoor space to improve the site and space programming in school planning. Among the others, one result indicates that the overall number of classes in a school should be reduced to 48, including the affiliated kindergarten, instead of the present number of 50. In addition, the number of classes must be counted in lieu of the number of student by classifying the size of school. In light of the present mean ratio of school building area per site in the city of 24.6%, which is much higher than other comparable city schools, the ratio should be about 20.0% by increasing the sports facility and outdoor spaces. In addition, the deprivation of the area caused by the district-unit-plan and the irregularity of the place should also be considered when determining the size of a school and site.

Comparative analysis of existing reinforced concrete buildings damaged at different levels during past earthquakes using rapid assessment methods

  • Sezer Aynur;Hilal Meydanli Atalay
    • Structural Engineering and Mechanics
    • /
    • v.85 no.6
    • /
    • pp.793-808
    • /
    • 2023
  • Türkiye is located in a region where destructive earthquakes are frequently experienced due to its geological characteristics and geographical location. Therefore, considering the possibility of a devastating earthquake at any time, determining the reinforced concrete (RC) building seismic safety, constructed before or after the current seismic buildings code, is one of the most important issues to be completed firstly. For this purpose, rapid assessment methods developed to quickly determine the seismic safety of buildings are available in the literature. Comparison of the principles of Principles of the Determination of Risky Structures-2019, Column and Wall Index Method, P25 Scoring Method and Improved Discriminant Analysis Method, which are among these methods, have been aimed within the scope of this study. Within the scope of this paper, a total of 43 buildings in the Yalova/Çınarcık region of Türkiye that the damage level was determined by street observation method immediately after the 1999 Kocaeli (Izmit) Earthquake; 15 buildings with heavy damage and 28 buildings with moderate damage were examined by rapid assessment methods. Although the risk detection difference was not separated as a clear line in any of the methods used, the results obtained from the rapid assessment methods are evaluated as being compatible with the detected after earthquake structural seismic behavior of the buildings. The PDRS-2019 and column and wall index method gave the most approximate results. In the results obtained from the analyzes; structural features such as number of floors, frame continuity, soft/weak story irregularity, effective shear strength area, existence of heavy overhangs in plan, type of structural system have been found to be significantly effective on the earthquake behavior of buildings.

A study on the way to improve abnormal noise by applying vehicle fitting type generator (탑재형 발전기 적용에 따른 이상소음 개선 방안에 관한 연구)

  • Kim, Seon-Jin;Kim, Sung-Gon;Yun, Seong-Ho;Shin, Cheol-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.266-274
    • /
    • 2020
  • This paper reports a means of improving the abnormal noise of light tactical vehicles (LTVs) by applying a vehicle fitting type generator (hereinafter called generator). LTVs are classified as having generators, and there are no differences in the noise level. On the other hand, quality improvement was performed in response to unpleasant noise felt by the user (hereinafter called abnormal noise) during vehicle operation. To improve the quality, the generator mounting structure and the phenomenon of the vehicle in the problem were identified. Through this, it was confirmed that the noise caused by the generator installation was the rattle noise. Rattle noise at the engine driving system is normally caused by the transfer of irregular torque generated by the engine power stroke and the backlash by the spline-serration fitting structure between the engine coupler and rotor assembly in a generator. Therefore, this study established an improvement plan to apply a damper coupler to solve the cause of the abnormal noise. Regarding the improved establishment method, the improvement effect was confirmed from the influence of the irregular torque of the engine, noise level, dynamic characteristics analysis, and the endurance test of the parts.

A Study on the Seismic Response of a Non-earthquake Resistant RC Frame Using Inelastic Dynamic Analyses (비선형 동적 해석을 이용한 비내진 상세 RC 골조의 지진거동 특성 분석)

  • Jeong, Seong-Hoon;Lee, Kwang-Ho;Lee, Soo-Kueon
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.3
    • /
    • pp.381-388
    • /
    • 2010
  • In this study, characteristics of the seismic response of the non-earthquake resistant reinforced concrete (RC) frame were identified. The test building is designed to withstand only gravity loads and not in compliance with modern seismic codes. Smooth bars were utilized for the reinforcement. Members are provided with minimal amount of stirrups to withstand low levels of shear forces and the core concrete is virtually not confined. Columns are slender and more flexible than beams, and beam-column connections were built without stirrups. Through the modeling of an example RC frame, the feasibility of the fiber elementbased 3D nonlinear analysis method was investigated. Since the torsion is governed by the fundamental mode shape of the structure under dynamic loading, pushover analysis cannot predict torsional response accurately. Hence, dynamic response history analysis is a more appropriate analysis method to estimate the response of an asymmetric building. The latter method was shown to be accurate in representing global responses by the comparison of the analytical and experimental results. Analytical models without rigid links provided a good estimation of reduced stiffness and strength of the test structure due to bond-slip, by forming plastic hinges closer to the column ends. However, the absence of a proper model to represent the bond-slip poased the limitations on the current inelastic analysis schemes for the seismic analysis of buildings especially for those with round steel reinforcements. Thus, development of the appropriate bond-slip model is in need to achieve more accurate analysis.

A Study on the Present Condition and Improvement of Cultural Heritage Management in Seoul - Based on the Results of Regular Surveys (2016~2018) - (서울특별시 지정문화재 관리 현황 진단 및 개선방안 연구 - 정기조사(2016~2018) 결과를 중심으로 -)

  • Cho, Hong-seok;Suh, Hyun-jung;Kim, Ye-rin;Kim, Dong-cheon
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.2
    • /
    • pp.80-105
    • /
    • 2019
  • With the increasing complexity and irregularity of disaster types, the need for cultural asset preservation and management from a proactive perspective has increased as a number of cultural properties have been destroyed and damaged by various natural and humanistic factors. In consideration of these circumstances, the Cultural Heritage Administration enacted an Act in December 2005 to enforce the regular commission of surveys for the systematic preservation and management of cultural assets, and through a recent revision of this Act, the investigation cycle has been reduced from five to three years, and the object of regular inspections has been expanded to cover registered cultural properties. According to the ordinance, a periodic survey of city- or province-designated heritage is to be carried out mainly by metropolitan and provincial governments. The Seoul Metropolitan Government prepared a legal basis for commissioning regular surveys under the Seoul Special City Cultural Properties Protection Ordinance 2008 and, in recognition of the importance of preventive management due to the large number of cultural assets located in the city center and the high demand for visits, conducted regular surveys of the entire city-designated cultural assets from 2016 to 2018. Upon the first survey being completed, it was considered necessary to review the policy effectiveness of the system and to conduct a comprehensive review of the results of the regular surveys that had been carried out to enhance the management of cultural assets. Therefore, the present study examined the comprehensive management status of the cultural assets designated by the Seoul Metropolitan Government for three years (2016-2018), assessing the performance and identifying limitations. Additionally, ways to improve it were sought, and a DB establishment plan for the establishment of an integrated management system under the auspices of the Seoul Metropolitan Government was proposed. Specifically, survey forms were administered under the Guidelines for the Operation of Periodic Surveys of National Designated Cultural Assets; however, the types of survey forms were reclassified and further subdivided in consideration of the characteristics of the designated cultural assets, and manuals were developed for consistent and specific information technologies in respect of the scope and manner of the survey. Based on this analysis, it was confirmed that 401 cases (77.0%) out of 521 cases were generally well preserved; however, 102 cases (19.6%) were found to require special measures such as attention, precision diagnosis, and repair. Meanwhile, there were 18 cases (3.4%) of unsurveyed cultural assets. These were inaccessible to the investigation at this time due to reasons such as unknown location or closure to the public. Regarding the specific types of cultural assets, among a total of 171 cultural real estate properties, 63 cases (36.8%) of structural damage were caused by the failure and elimination of members, and 73 cases (42.7%) of surface area damage were the result of biological damage. Almost all plants and geological earth and scenic spots were well preserved. In the case of movable cultural assets, 25 cases (7.1%) among 350 cases were found to have changed location, and structural damage and surface area damage was found according to specific material properties, excluding ceramics. In particular, papers, textiles, and leather goods, with material properties that are vulnerable to damage, were found to have greater damage than those of other materials because they were owned and managed by individuals and temples. Thus, it has been confirmed that more proactive management is needed. Accordingly, an action plan for the comprehensive preservation and management status check shall be developed according to management status and urgency, and the project promotion plan and the focus management target should be selected and managed first. In particular, concerning movable cultural assets, there have been some cases in which new locations have gone unreported after changes in ownership (management); therefore, a new system is required to strengthen the obligation to report changes in ownership (management) or location. Based on the current status diagnosis and improvement measures, it is expected that the foundation of a proactive and efficient cultural asset management system can be realized through the establishment of an effective mid- to long-term database of the integrated management system pursued by the Seoul Metropolitan Government.