• Title/Summary/Keyword: Pipe Connection

Search Result 122, Processing Time 0.027 seconds

Analysis of hydraulic system for seawater desalination plant through piping analysis program (배관 해석 프로그램을 통한 해수담수화 플랜트 수압 시스템 분석)

  • Choi, Jihyeok;Choi, Yongjun;Yang, Heungsik;Lee, Sangho;Choi, June-Seok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.3
    • /
    • pp.221-230
    • /
    • 2020
  • In actual seawater desalination plant, the pressure loss due to frictional force of pipe is about 3~5 bar. Also, the pressure loss at pipe connection about 1~3 bar. Therefore, the total pressure loss in the pipe is expected to be about 4~8 bar, which translates into 0.111 to 0.222 kWh/㎥ of energy when converted into the Specific Energy Consumption(SEC). Reducing energy consumption is the most important factor in ensuring the economics of seawater desalination processes, but pressure loss in piping is often not considered in plant design. It is difficult to prevent pressure loss due to friction inside the pipe, but pressure loss at the pipe connection can be reduced by proper pipe design. In this study, seawater desalination plant piping analysis was performed using a commercial network program. The pressure loss and SEC for each case were calculated and compared by seawater desalination plant size.

The Study on Local Composite Behavior of Connection Member between Steel Pipe Pile and Concrete Footing (강관 말뚝 기초 두부 연결부의 합성거동에 대한 연구)

  • You, Sung-Kun;Park, Jong-Myen;Park, Dae-Yong;Kim, Young-Ho;Kang, Won-Ho
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.2
    • /
    • pp.288-296
    • /
    • 2003
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the related specification, type B-method is provident. To investigate real structural behavior of type B connection, several load tests are done with carefully designed experimental system. The purpose of this experiment is mainly focused on the understanding of actual behavior which can be predicted by design theory. At this research stage, vertical and lateral loading test are done for three types of specimen to review stress concentration, formation and behavior of imaginary RC column in the footing and effect of non-slip device installed in the steel pipe pile. The load resistance mechanism in these specific connection method is predicted based on both experimental results. The three-dimensional finite element modeling is also done for the purpose of comparison between numerical and experimental result. With all the results gained from experiment the structural behavior of imaginary RC column in the design concept is confirmed. The role of non-slip device is very important and it affects the resistance capacity with help of composite action of concrete and steel pipe pile.

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

Deformation Analysis of Carrier Pipe for Cold Shrinkable Joint (CSJ 개발을 위한 캐리어 파이프의 변형해석)

  • Lee, Yang-Chang;Lee, Joon-Seong;Lee, Ho-Jeong;Ryu, Jeong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.1
    • /
    • pp.314-319
    • /
    • 2010
  • This paper represents the results of study on Extra High Voltage Power Cable Connection System Development. The purpose is to evaluate structural safety by numerical analysis for the relaxation of electric field concentration and by structural analysis of Carrier Pipe for easy installation of High Insulating Rubber Sleeve in the field, which is core technique of connection system. According to the results, the thickness of Carrier Pipe needs at least 9mm by optimization analysis of deformation behavior and insulating design & relaxation of electric field concentration. The result of contraction behavior of the connection part can be demonstrated with the same result of electric field relaxation analysis at the boundary of the electrode inserted into the insulating rubber sleeve.

Integrated Expansion Analysis of Pipe-In-Pipe Systems

  • Choi, Han-Suk;Do Chang-Ho
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.5 s.72
    • /
    • pp.9-14
    • /
    • 2006
  • This paper presents an analytical method, application of expansion, mechanical design, and integrated expansion design of subsea insulated pipe-in-pipe (PIP) systems. PIP system consists of a flowline and a casing pipe for the transport of high temperature and high pressure product from the subsea wells. To prevent heat lass from the fiowline, insulation material is applied between the pipes. The fiawline pipe and the casing pipe have mechanical connections through steel ring plate (water stops) and bulkheads. Pipeline expansion is defined by temperature, internal pressure, soil resistance, and interaction force between the flowline and the casing pipe. The results of the expansion analysis, the mechanical design of connection system of the two pipes and tie-in spool design are integrated for the whole PIP system.

Hydraulic Adequacy of Connection Pipes in Water Supply Systems for Contingencies (비상시 용수공급을 위한 상수도 연계관로의 수리적 적정성 평가)

  • Han, Wanseob;Jung, Kwansoo;Kim, Juhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.6
    • /
    • pp.679-687
    • /
    • 2013
  • Although stable and safe drinking water supply to the customers is a basic function of multi-regional water supply systems in Korea, most systems have their vulnerabilities in emergency time due to the branch-type. Application of connections from the other water supply system can provide a solutions for these tentative problems. This paper describes reduction planning of water supply accidents that can minimize a service interruption to customers in multi-regional water supply system by connecting pipe lines between local water supply systems in Mokpo city areas. The result of this study shows that Juam dam multi-regional water supply systems can cover all of the water shortage in southern parts of Jeonnam multi-regional water supply systems by transmitting water through connected pipes between local networks. This can be effective to supply water interactively in various contingencies, when a pipe line accident occurs in southern area of Jeonnam multi-regional water supply systems. On the contrary, southern area of Jeonnam multi-regional water supply systems can cover 99.5 %($62,500m^3/day$) of the water shortage of Juam dam multi-regional water supply systems when service interruptions caused by various pipe accidents occur in the system.

Development of the Phased Array Ultrasonic Test Technique for the Weld Inspection of Reactor Coolant System 3" Branch Connection Lines in Nuclear Power Plants (원자로냉각재계통 3" 분기관 용접부 위상배열초음파탐상검사(PAUT)기법 개발)

  • Lee, Seung-Pyo;Moon, Yong-Sig;Jung, Nam-Du;Cho, Yong-Bae;Kim, Chang-Soo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.4 no.2
    • /
    • pp.40-45
    • /
    • 2008
  • There exist many types of pipe and component fatigue through vibrations, thermal fatigues or shifting. In some cases of thermal stratification/thermal fatigue, pipes & components are receiving thermal stress by means of material expansion and shrinkage by continuous thermal repetitive variation. Small cracks initially occur on the inside surface by thermal stress. These cracks grow in depth the pipe wall and finally come to a rupture. Pipe parts of susceptibility to thermal stratification and thermal fatigue are now being examined by conventional UT(ultrasonic test) as volumetric examination. It is difficult to fully satisfy the code & standards requirements because 3" weldolet weldments of RCS 16" pipe to 3" branch connection lines have complex structural shape. To solve the problems of conventional UT examination, we made a realistic mock-up and UT calibration block. We performed a simulation of phased array UT utilizing CIVA as NDE(Non-Destructive Examination) simulation software. Also we designed phased array UT transducer and wedge, optimal frequency by using simulation data. We performed phased array UT experiment through mock-up including artificial flaws(notch). The phased array UT technique is finally developed to improve the reliability of ultrasonic test at RCS 16" pipe to 3" branch connection weld.

  • PDF

A New Way of Connecting Method Between Steel Pipe Pile and Concrete Footing (새로운 강관말뚝 머리 보강 공법 개발)

  • 박영호;김낙영;박종면;유성근;김영호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.413-420
    • /
    • 2002
  • Recent experimental research results of connection method between steel pipe pile and concrete footing are provided based on various experimental observations. It gives a shedding light toward developing better and concrete connection method for steel pipe pile at the field application. In this study, the newly developed method is tested for compressive, pull put and combination load including moment with carefully designed monitoring system. The measured data show that new method have at least equivalent or better load resistant capacities compared with those of specified method in Korea Highway Corporation design code. It is also tried to define and investigate the load transfer mechanism for new method.

  • PDF

Experimental Evaluation of Reserve Capacities for Connection Details between Steel Pipe Pile and Concrete Footing of Type-B (Type-B방식의 강관말뚝과 확대기초 연결부 상세에 따른 보유내력의 실험적 평가)

  • Han, Sang-Hoon;Hong, Ki-Nam;Kwon, Yong-Kil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.1
    • /
    • pp.183-192
    • /
    • 2008
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the korea highway bridge code, type-B method is prevalent. In this study, vertical, lateral, and tension loading test are done for two types of type B connection to review stress concentration, formation and behavior of imaginary RC column in the footing. Welding type and hook type as the connection method are considered in this study. Test results show that welding type have the more reserve capacity than hook type and the specimens connected by the welding type behave as the imaginary RC column in the footing. However, the specimens connected by the hook type did not behave as the imaginary RC column in the footing but behave as the hinge.

A Study on Improvement of Connection Method of Underground Parking Lot SP Equipment Water Supply Pipe for Effective Fire Activities (효과적인 소방활동을 위한 지하주차장 스프링클러설비 송수배관 연결방식의 개선에 관한 연구)

  • Son, Gae-Seong;Choi, Ji-Hun;Choi, Don-Mook
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.161-169
    • /
    • 2015
  • A fire sprinkler system is very important to extinguish fire in the building. The sprinkler system initiates sprinkler discharge if the detection system identifies a developing fire and opens the pre-action valve. However, pre-action fire sprinkler systems mainly installed in the underground parking lot at the apartment complex do not properly operate at fire if the connection type of fire sprinkler systems does not properly installed and operated. This study identified the relationship between fire dispersion & damage and the connection type of water supply in the sprinkler system from many fire cases at the apartment complex in South Korea. In addition, this study also identified the water supply differences and characteristics between South Korea and foreign countries. The main purpose of this study is also to improve the water connection types in the sprinkler system that can reduce the potential failures of pre-action valve operation through electrical signal system. The study also suggests the improvement plan for water connection types in pre-action fire sprinkler system that can minimize potential failure of pre-action fire sprinkler system. The suggestions for revising the fire safe standard in South Korea includes letting the water supply pipe of sprinkler system water inlet connect to the second side of pre-action valve and the water flow device that can minimize potential failure of sprinkler system.