Experiments of Combustion Vibration in the Pilot Furnace for Fossil Power Plant under Combustion Test (I) (화력 발전용 시험연소로의 연소시험 중의 연소진동 실험(I))

  • Ju, Young-Ho;Kim, Cheol-Hong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.341-344
    • /
    • 2004
  • This paper presents results of test for combustion vibration in the pilot furnace for fossil power plant under combustion test. We measured static pressure variation in the pilot furnace together with air and fuel flow. From test results, it shows that vibration magnitude is affected by air and fuel flow. Also, a finite element analysis using a commercial S/W is performed to calculate acoustic mode of the pilot furnace. These results show that dominant frequency occurred is related to acoustic natural frequency of furnace. After this, it needs to be studied the relation between dominant frequency of combustion vibration and air flow rate.

  • PDF

Test Run for the Production of Aluminum Hydroxide by Recycling of Waste Aluminum Dross (알루미늄 폐드로스로부터 수산화알루미늄 생산 시운전 결과)

  • Lee Hooin;Park Ryungkyu;Kim Joonsoo
    • Resources Recycling
    • /
    • v.13 no.2
    • /
    • pp.47-53
    • /
    • 2004
  • Waste aluminum dross is a major waste in the aluminum scrap smelters, and some metallic aluminum remains in the waste dross. In the previous study, waste aluminum dross was leached with sodium hydroxide solution to extract the remained aluminum into the solution, and aluminum hydroxide precipitate was recovered from the leached solution. A pilot plant was constructed and tested to demonstrate the developed technology. One thousand tons of waste aluminum dross could be processed, and about five hundred tons of aluminum hydroxide could be produced in the pilot plant. From the test run of the pilot plant, it was confirmed that the developed technology could be employed as a commercial scale and the produced aluminum hydroxide could be used for water treatment agent.

A Pilot Plant Study of Industrial Wastewater Recycling Technology for Disc-Tube Membrane (DISC-TUBE MEMBRANE을 이용한 산업폐수 재활용 기술의 PILOT PLANT적 연구)

  • 김동일;한성욱;김호식;김인환
    • Journal of environmental and Sanitary engineering
    • /
    • v.12 no.3
    • /
    • pp.81-86
    • /
    • 1997
  • In case of Industrial Wastewater, It was various pollutions, high concentration and different physical, chemical properties each other in accordance with classification of wastewater. Therefore, after inquiring into the influence on the membrane of the dissolved pollutants, we should select the membrane of best efficient quality. As results of experiments on pilot plant test, optimum operating pressure for fouling removal was 34BAR, when continues operating was 34 BAR, recovery rate was 75% and permeate water flux was $32.9{\;}{\ell}/hr{\cdot}m^{2}$.

  • PDF

Optimal Design and Development of a Rice Mill Pilot Plant by Computer Simulation (II) -Development and Performance Evaluation of a Rice Mill Pilot Plant- (컴퓨터 시뮬레이션에 의한 미곡 도정공장의 적정설계 및 개발(II) -미곡 도정시스템의 개발 및 성능평가-)

  • 정종훈;김보곤;최영수
    • Journal of Biosystems Engineering
    • /
    • v.20 no.3
    • /
    • pp.262-274
    • /
    • 1995
  • A rice mill pilot plant was designed and developed in the basis of the simulation results on the mill plants. The performance of the developed rice mill plant was evaluated, and the simulation model on the mill system was validated with the experimental data in the mill plant. The results of this study were as followings : 1. A rice mill pilot plant with the capacity of 0.5 t/h was designed and developed. 2. The hulled ratio of the mill plant was 87.3%, and the milled rice recovery and the head rice recovery of the cleaned rice were 74% and 87% , respectively. The degree of milling of the cleaned rice was 10.6% with a high polish. The intensity of the cleaned rice appeared high compared with that of the milled rice in the analysis of whiteness test using an image processing system. 3. The bottleneck, processing time, and production amount of the developed mill system almost coincided with those of the simulation of the rice mill plant. The developed simulation model of the rice mill plant was proven to be applicable to the design of a rice mill plant through experiments.

  • PDF

Gasification melting characteristics of Automobile shredder residue in 5t/d shaft pilot plant (5톤/일 shaft형 pilot plant에서 자동차 폐차 잔재의 가스화 용융 특성)

  • Roh, SeonAh;Kim, WooHyun;Yun, JinHan;Hong, ByeongKwon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.160-160
    • /
    • 2010
  • ELVs (End-of-Vehicles) in Korea incrasease continusely because of increase of used car. Automobile Shredder Residue (ASR) is final product of ELVs (End-of-Vehicles) after recycling. Automobile Shredder Residue are composed of light and heavy fluffs and soil/dust. In this study, 5 ton/day pilot plant of shaft type has been designed and constructed and 15 times of test run were performed. For the stable operation, operation conditions such as the amount of fed ASR and cokes, air flow and temperature in the gasification melting system have been changed and the composition of the produced gas such as $H_2$, CO and $CH_4$ and air pollution compound including dioxin discharged from the stack have been analyzed.

  • PDF

A study on the dye wastewater treatment by Fenton oxidation process (Fenton 산화공법을 적용한 염색폐수처리 연구)

  • Ahn, June-Shu;Park, Tae-Sool;Cho, Jung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.9
    • /
    • pp.4274-4282
    • /
    • 2011
  • In this study, Fenton reaction was studied for the possibility of applying as advanced treatment and its optimal condition for the removal of refractory organics from the dye wastewater. Fenton reaction was applied to remove refractory organics after the bio-treatment (secondary treatment) inside test laboratory and on-site pilot plant. Wastewater from the secondary treatment was used and its $COD_{Mn}$ was measured as 30~50mg/L. After the Fenton reaction, the optimal condition was found as pH 3~3.5, reaction time 2~2.5hr, chemical input ratio of ($FeCl_2$(33%)/$H_2O_2$(35%)) was 3 : 1. When chemical input ratio of ($FeCl_2$(33%)/$H_2O_2$(35%)) was at its optimal, amount of sludge volume ($SV_{2hr}$) was 21~28%. With pilot plant test, removal rate was heavily influenced by the hydraulic retention time(HRT), and optimum value of HRT was 2.0 hr. When pilot plant($2m^3/d$) was placed on-site and operated continuously, it showed steady and fairly good treatment of COD where COD removal rate was 60~70%, treated water showed below 20mg/L.

Evaluation of Field Application for the Developed Retrofitting Process and Analysis of Bacterial Community Structure in Pilot Plant (하수처리장 Retrofit 공정의 현장적용성 평가 및 세균 군집 분포 연구)

  • Kim, Mee-Kyung;Hong, Jun-Hyeok;Kim, Youn-Kwon;Ahn, Tae-Seok;Shin, Eung-Bai
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.28 no.3
    • /
    • pp.240-248
    • /
    • 2006
  • In this study, a retrofitting BNR process that was modified for the economical applicability was proposed and evaluated in the pilot plant($50m^3/d$). At the same time the bacterial community structure was investigated in the pilot plant by using FISH(fluorescent in situ hybridization) method. Economically 16% of the initial construction cost for the proposed process(introduction of a biological nutrient removal process of $60,000m^3/d$ scale basis) was reduced due to the absence of a bioreactor. Water treatment efficiencies and maintenance facilities of the modified process were satisfied with the strengthened discharge permits in Korea throughout a long term pilot plant operating including a winter season. Bacterial populations in the pilot plant and in the control plant(A2/O process, B SIP(Sewage Treatment Plant)) were remained uniformly during the test period, but bacterial structure in the bioreactor was changed drastically. Proportions of ${\beta}$-proteobacteria group including soil bacteria which play a important role in wastewater treatment increased $25{\sim}607%$ in population.

Comparison of Anaerobic Digestion for food wastewater and food waste by HADS Pilot Plant (HADS Pilot Plant를 이용한 음폐수와 음식물쓰레기의 혐기성 소화 비교)

  • Ju, Donghun;Lee, Jungmin;Park, Seongbum;Sung, Hyunje
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.245-245
    • /
    • 2010
  • 우리나라 생활폐기물 중 음식물쓰레기는 가장 많은 부분을 차지하고 있다. 또한, 음식물쓰레기에서 발생되는 음폐수의 발생량은 8,926톤/일에 달하고 있지만, 이 중 극히 일부만이 하수처리장 등에서 병합 처리되고 있고 대부분은 해양 투기되고 있는 실정이다. 이에 본 연구에서는 독일 GBU사로부터 중온/습식/이상 혐기성 소화 기술을 도입하여 HADS Pilot Plant를 설치하였고, 2008년 3월부터 국내 음폐수 및 음식물쓰레기에 적합한 최적의 운전기술을 확보하기 위한 Pilot Test를 실시하였다. 본 실험에 사용된 HADS Pilot Plant는 산발효조($6m^3$), 메탄발효조($50m^3$), 안정화조/가스저장조($40m^3$)그리고 가스 소각기로 구성되어 있다. 그리고 적용 음폐수 및 음식물쓰레기는 경기도 Y군에 위치한 사료화 시설에 반입되는 것을 이용하였는데 음폐수는 평균 TS 13.5%, VS 80%, pH $3.7{\pm}0.2$의 성상을 나타내었다. 이를 이용해 계단식으로 유기물 부하를 증가시키면서 $4kgVS/m^3/d$까지 적용하며 중온 상태에서 혐기성 소화를 실시한 결과, $0.8Nm^3/kgVS_{rem}/d$의 바이오가스 회수 및 85%의 VS 감량이 가능함을 확인하였다. 그리고 음식물쓰레기는 음폐수와 달리 1차 파쇄/선별기 및 배관상에 설치되는 2차 미세파쇄/선별기를 통한 전처리를 실시하였고, 1차 파쇄/선별 후 평균적으로 TS가 17.4%, VS는 81%, pH는 $3.85{\pm}0.2$의 성상을 나타내는 음식물쓰레기를 2차 미세파쇄/선별기를 거쳐 Pilot Plant의 산발효조에 투입하여 중온상태에서 혐기성 소화를 실시하였다. 음폐수 적용시와 마찬가지로 계단식으로 유기물 부하를 증량하면서 $4kgVS/m^3/d$까지 적용하여 운전하였고, 그 결과 약 $0.9{\sim}1.2Nm^3/kgVS_{rem}/d$의 바이오가스 회수와 85~87%의 VS 감량 효율을 확인하였다. 음폐수와 음식물쓰레기의 혐기성 소화 실험 결과, 제거된 VS량을 기준으로 보았을 때, 음식물쓰레기에서 더 많은 바이오가스 발생하였는데 이는 음식물쓰레기에 존재하는 고형물이 미생물들의 서식 공간으로 활용됨에 따라 혐기성 소화 과정에서 일어나는 혼합 발효 및 공영양 대사가 음폐수 대비 좀 더 수월하게 일어날 수 있게 된 데에 따른 결과라고 생각된다. 당사의 HADS Pilot Plant test에서는 계단식의 순차적인 유기물 부하 증량과 총VFA/총 알카리도 비율을 0.3~0.4 수준이하로 유지하며 운전함에 따라 음폐수와 음식물 모두에서 안정적으로 $4kgVS/m^3/d$까지의 유기물 부하 적용이 가능하였다. 또한, 생산된 바이오가스 내 메탄의 함량은 60~65%를 유지하였으며, 메탄발효조의 pH는 별도의 조절이 없이도 운전기간 동안 평균 7.8~7.9 수준을 유지하였다. 이처럼 pH 3.7~3.8의 음폐수 또는 음식물쓰레기의 투입에도 안정적인 완충능력을 보여준 것은 소화조 내에서 기질로부터 분해되어져 나오는 암모니아와 이산화탄소가 강력한 버퍼 시스템을 구축하고 있음에 따른 결과로 사료된다. 그리고 음폐수와 음식물쓰레기의 경우 모두 85%이상의 높은 VS 제거율을 보여주었는데 이는 당사의 HADS Pilot Plant 소화조의 구조가 내통과 외통으로 구분되어져 있음에 따라 plug flow + CSTR의 특징을 가짐에 따른 결과로 판단된다. 상기한 결과를 바탕으로 향후에는 $5kgVS/m^3/d$ 수준의 유기물 부하 적용운전도 계획하고 있다.

  • PDF

Design and Performance Test of SCR Pilot Plant($1,000Nm^{3}/hr$) ($1,000Nm^{3}/hr$급 SCR Pilot Plant의 설계 및 성능실험)

  • Kim, J.I.;Chang, I.G.;Seon, C.Y.;Kim, J.S.;Chon, M.H.
    • Proceedings of the KSME Conference
    • /
    • 2001.06d
    • /
    • pp.979-984
    • /
    • 2001
  • As a preceding process for developing design technology and establishing operation technology, the design procedure of the SCR(Selective Catalytic Reduction) pilot plant that can handle $1,000Nm^{3}/hr$ of flue gas was reported in this paper. And we also considered several factors that might cause abnormality of the plant in the designing process. The plant was designed and fabricated to test the $DeNO_{x}$ performances in variable operating conditions in the range of $3,000{\sim}36,000hr^{-1}/hr$ in space velocities, $1.67{\sim}6\;m/s$ in linear velocities, $200{\sim}500^{\circ}C$ temperatures, $300{\sim}1,000Nm^{3}/hr$ flow rates, and $0{\sim}1.4:1\;NH_{3}/NO$ ratios. In order to maintain the flow uniformity, the guide vanes and flow straightener were designed and constructed in the plant. The SCR pilot plant can be operated by the automatic control system, which enable to obtain performance data in real time and to set up the operating technology. The catalyst reactor consists of 4 catalyst layers and surface area of each layer can be adjusted to be of small size. Arrangement of catalysts per layer is $3{\times}6$ with the catalyst dimensions of $150{\times}150{\times}500mm(L{\times}W{\times}H)$.