• 제목/요약/키워드: Pilot Projects

검색결과 244건 처리시간 0.031초

대규모 주민참여형 재생에너지 사업의 지역경제 활성화 평가지표 개발 연구 (Study on the Development of an Evaluation Index for the Local Economy Activation of Community Investment Renewable Energy Projects)

  • 임현지;윤성권;윤태환;김윤성
    • 신재생에너지
    • /
    • 제17권2호
    • /
    • pp.9-23
    • /
    • 2021
  • In Korea, various community investment renewable project models are being implemented to increase community acceptance of renewable energy. An important factor for enhancing local acceptance is that renewable energy projects have a positive effect on revitalizing the local economy such as income increase or job creation for residents and local companies. To maximize the local economic effect of large-scale community investment renewable energy projects, this study developed an evaluation index for local economy activation, whose indicators are the local return on investment, local companies' participation, local job creation, regional cooperation, transparency, and governance. Analysis of existing evaluation indicators and current renewable projects, financial analysis, and expert interviews were used in this research. The pilot evaluation determined that, the local economic effect was high in the following order: a fund investment wind project (Gangwon), benefit-sharing wind project (Jeju), and general wind project. In particular, residents' investment amount, the number of participating residents, and the amount and transparency of the regional cooperation fund were key factors to expand the effect of local economy activation. This evaluation index could be used in public bidding for renewable energy projects such as offshore wind zoning areas of local government.

저압원격검침시스템 구축현황 및 기술동향 (Present status of KEPCO's R&D of the PLC technology and AMI projects)

  • 이수묵;정강식;임기식;김명호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.488-489
    • /
    • 2011
  • This technical reports describes KEPCO's PLC technology and PLC AMI projects. KEPCO has developed PLC and PLC convergence technology. KEPCO's BPL(Broadband over PLC) standard was selected as an IEC International Standard (IEC 12139-1) in 2009. KEPCO conducted a project installing 550,000 smart meters to residential customers finishing in 2010. KEPCO will carry out a PLC-AMI project around country until 2020, as well as many pilot projects to test its PLC convergence technology.

  • PDF

용수로의 자연친화적 정비 및 설계 (Consolidation and Design of Naturally Favorable Irrigation Canals)

  • 김선주;양용석;안민우
    • 농촌계획
    • /
    • 제8권2호
    • /
    • pp.50-56
    • /
    • 2002
  • In 1980s, studies on the river environment and the management techniques to maintain the quality of water achieved actively. From the beginning of 1990s, the concept considering the river ecology and conservation in urban area have been introduced in Korea. Recently, some environment friendly projects on the rivers have been executed and some are under way. Many small rivers in rural areas have been maintained considering landscape and partly ecology. However until the pilot project named Songsam drainage channel project started in 1998, there were no studies and projects on the irrigation and drainage channels considering environment friendly maintenance. Korea Agricultural and Rural Infrastructure Corporation (KARICO) is going to introduce environment friendly and naturally favorable maintenance technique when the new projects to reform the irrigation and drainage channels are planned. Irrigation channel in O-dong project site in Yeomsan-myeon, Younggwang-gun was designed considering environment friendly consolidation and maintenance.

e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발 (A Qualitative Approach to eIT Project Management)

  • 정기호
    • 한국IT서비스학회지
    • /
    • 제1권1호
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

고혈압 및 당뇨병 관리를 위한 지역사회중심의 접근전략과 발전방향 (Community based strategies and directions for the management of hypertension and diabetes)

  • 이순영
    • 보건교육건강증진학회지
    • /
    • 제33권4호
    • /
    • pp.67-77
    • /
    • 2016
  • Objectives: The study was to propose strategies and directions how to manage the hypertension and diabetes in communities. Methods: The survey data from 606 patients with hypertension or diabetes based on Community Health Survey, 2013 were analyzed and the hypertension and diabetes projects in communities for last 10 years were reviewed. Results: The patients visiting the primary clinics had statistically significant lower rates than those of teaching hospitals in physician's recommendation experience, perception level of attention from doctors, self-efficacy and health habit practice level. Since the Hypertension and diabetes registration and management system in 2007, there have been several trials for management of hypertension and diabetes such as Chronic diseases management system on the primary clinics, Community based primary medical care pilot projects, Post-national health screening management, and Pilot project on reimbursement for chronic diseases care services. Conclusions: The upmost urgent task might be to have a support system for patients' self care affiliated with primary clinics. To achieve it, it is necessary to expand the current Hypertension and diabetes registration and management system into nation and to find a way to attract the active participation from primary clinics.

모듈러주택 품질관리를 위한 BIM 적용 방안 (BIM Application Method for the Quality Management of Modular Houses)

  • 이동건;김진원;손정락
    • 토지주택연구
    • /
    • 제10권2호
    • /
    • pp.59-67
    • /
    • 2019
  • The recent paradigm shift in the construction industry has led to a growing demand for industrial construction. In particular, interest in modular housing, one of the areas of industrialization architecture, is soaring. Modular housing is a construction method for completing a building by transporting factory-built modules to the site and assembling them. However, modular housing in Korea has various problems such as errors in design books, lack of factory drawings, and lack of on-site construction plans. BIM is a tool for accumulating, producing and managing various information through 3D models and is a solution to solve various problems of modular housing. In this study, problems of modular housing and BIM utilization of modular housing were presented as ways to ensure the quality of modular housing. Therefore, this study analyzed the problems that are occurring in the construction process of modular housing. And, to address the problem of modular housing, BIM utilization measures were proposed for each modular process step. However, the application of BIM in domestic modular project is currently being carried out in pilot research project. Because of this, the BIM utilize method for modular housing is limited based on the BIM use for general projects and the examples for some modular pilot projects.

공공부문 시공책임형 CM 사업의 시공이전단계 성과분석 (Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector)

  • 박보성;김옥규
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.97-105
    • /
    • 2021
  • 발주제도 혁신을 통한 국내 건설산업의 글로벌 경쟁력 강화를 목적으로 시작된 시공책임형 CM 사업이 공공부문에서 시범사업의 형태로 시행되고 있다. 그러나 정식 발주제도로 나아가기 위한 관련 법령 제정까지는 시간이 필요해 보이며, 사업에 대한 성과분석도 아직까지 미진한 상황이다. 이에 본 논문에서는 현재 시행되고 있는 4개의 시범사업의 사업이전단계사업관리(Pre-Construction Service)에 대한 성과분석을 통해 사업의 효과와 신뢰성을 검증하고자 하였다. Team Building, 설계도서 정합성, 공기검토, VE, BIM 활용 등 총 5개의 분야에 대해 성과분석을 진행했으며, 참여자 면담조사를 통해 문제점을 확인하고 그에 대한 개선안을 제시하였다. 본 연구의 결과는 향후 이루어질 발주제도 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.

공연예술 영상화 제작과정 연구:NT Live 시네마 브로드캐스트 사례분석을 중심으로 (Study on the Production Process of Performance Arts Visualization Projects: Focused on a Case Analysis of NT Live Cinema Broadcasts)

  • 박진원;김가은
    • 한국콘텐츠학회논문지
    • /
    • 제21권7호
    • /
    • pp.45-58
    • /
    • 2021
  • 본 연구는 4차 산업과 글로벌시대에 걸맞는 공연예술문화의 가치 창출 및 활성화를 위해 현시대 공연예술 소비자의 문화향유방식 및 니즈 변화에 반응하고 있는 대표적인 공연예술 영상화사업을 선정, 공연산업의 새로운 문화가치 창출 가능성을 확인하고 제작과정의 중요한 제반사항과 주안점을 파악하고자 하는 데 목적이 있다. 이를 위해 NESTA에서 작성한 'NT Live-Digital broadcast of theatre Learning from the pilot season'(2011)보고서 분석을 중심으로 시네마 브로드캐스트 공연 영상화사업의 성공적 선도 모델인 영국 로열 내셔널 시어터의 "NT Live" 사업의 기획 의도, 제작 프로세스(저작권 협의, 인력구성, 촬영 및 중계), 마케팅 방식과 관객층을 면밀히 분석하여 기존 공연예술과 차별화되는 제작과정 및 문화 예술적 가치를 파악하고 공연 영상화 사업의 지속가능성을 위한 행·재정적 주안점을 정리하고자 한다. 이를 통하여 시네마 브로드캐스트(공연실황 중계) 공연 감상 방식이 새로운 공연예술 상품으로서 예술적·문화적·경제적 가치를 가지는 원천 창출의 가능성을 확인할 수 있을 것이다. 또 한 관객들의 문화 향유방식과 소비 형태에 반응하는 다양한 공연 접근 활로 개척이 공연예술 분야의 대중성 향상과 관객층 확대를 통한 공연예술 영상화 사업 활성화라는 결과를 가져올 수 있을 것이라 예상한다.

Critical Success Factors for Project Management Information System in Construction

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권1호
    • /
    • pp.25-30
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

CRITIAL SUCCESS FACTORS FOR PROJECT MANAGEMENT INFORMATION SYSTEM IN CONSTRUCTION

  • Jung Ho Yu;Seul Ki Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.498-503
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

  • PDF