• Title/Summary/Keyword: Pile bent system

Search Result 3, Processing Time 0.017 seconds

A Case Study on the Design and Construction of the Pile Bent System (단일현장타설말뚝을 이용한 교량기초의 설계 및 시공 사례)

  • Cho, Sung-Han;Kim, Hyung-Wook;Kim, Zu-Cheol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.357-367
    • /
    • 2010
  • In this study, several design and construction cases of the pile bent system for bridges were introduced. The lateral displacement of the pile bent system is larger than the displacement of pile cap system, due to the smaller bending stiffness and the longer unsupported length. So, the analysis of the lateral pile displacement is main factor for the design of pile bent system and superstructure. For the accurate estimation of the pile displacement, an iterative analysis method was developed. The superstructure was analyzed regarding the pile foundation as $6{\times}6$ spring and the substructure was analysed using non-linear load transfer curves (p-y, t-z, q-z curve). And, to verify this analysis method, the estimated displacements are compared with the results of lateral load test. This analysis method is expected to be a viable alternative approach for the design of bridge foundation hereafter.

  • PDF

Estimation of Appropriate Reinforcement Length of Casing for the Pile of Pile Bent System through Numerical Analysis (수치해석을 통한 단일형 현장타설말뚝 외부강관의 적정 보강길이 산정)

  • Yang, Wooyeol;Kim, Wanho;Lee, Kangil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.6
    • /
    • pp.5-15
    • /
    • 2021
  • One of the construction methods applied as a pier foundation type is a single type cast-in-place pile. In applying a pile bent system as a foundation type, the main concern in designing can be said to secure the lateral bearing capacity of pile structure in system. In addition, to increase the rigidity of the pile structure, a method of increasing the lateral bearing capacity by reinforcing the pile structure with a casing has been used. However, although the reinforcing effect and appropriate reinforcing length of casing may vary depending on the soil conditions, there is insufficient studies on this, and for this reason, the entire pile structure in a pile bent system is reinforced with a casing, in the field. In addition, if the length of the entire pile is reinforced with a casing, it may lead to delays in construction and increase in construction costs. That is, in order to more effectively reinforce the pile structure with a casing, it is necessary to study the lateral bearing characteristics of the reinforced pile structure in system. And it should be determined the appropriate reinforcing length of the casing from the evaluated bearing characteristics. Therefore, in this study, the lateral bearing characteristics of piles applied with the reinforcing length of casing for each condition were evaluated through a numerical analysis. And, based on the analysis results, the appropriate reinforcing length of casing was proposed. As a result of the study, it was found that in order to effectively increase the lateral bearing capacity of pile structure, the reinforcing length of casing should be applied twice the influence range of the bending behavior of the pile, 1/β.

Design of Dang-San Steel Railway Bridge (당산철교의 설계)

  • 유동호;김선일
    • Computational Structural Engineering
    • /
    • v.12 no.4
    • /
    • pp.69-69
    • /
    • 1999
  • Design of Dangsan Steel Railway Bridge(a part of Seoul Subway Line NO. 2), which is supposed to be replaced after its 15years survice, was done, and the reconstruction has begun in Dec. 1997. The design include new superstruc-ture and bridge piers, retrofitting of the foun-dation, rail system, electric and signal, etc. In this paper, design of the structure is mainly summarized. The main span superstructure, across Han river, is composite section which is com-posed of steel box and reinforced concrete deck slab with 9 span continuous. The superstructure for the approaches is bottom througth type 2-cell steel box girder with steel floor system and concrete deck slab with 3 or 4 span continuous. The bridge piers was planned to be reconstructed based upon the result from the various investi-gations, while the foundation(cassion and pile foundation) was planned to be retrofitted. For superstructure erection, the method of combination of barge bent and heavy lifting and the launching truss method was investigated for the main span and approach spans, respectively.

  • PDF