• 제목/요약/키워드: Phasor measurement units (PMUs)

검색결과 18건 처리시간 0.031초

A Multi-objective Placement of Phasor Measurement Units Considering Observability and Measurement Redundancy using Firefly Algorithm

  • Arul jeyaraj, K.;Rajasekaran, V.;Nandha kumar, S.K.;Chandrasekaran, K.
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권2호
    • /
    • pp.474-486
    • /
    • 2015
  • This paper proposes a multi-objective optimal placement method of Phasor Measurement Units (PMUs) in large electric transmission systems. It is proposed for minimizing the number of PMUs for complete system observability and maximizing measurement redundancy of the buses, simultaneously. The measurement redundancy of the bus indicates that number of times a bus is able to monitor more than once by PMUs set. A high level of measurement redundancy can maximize the system observability and it is required for a reliable power system state estimation. Therefore, simultaneous optimizations of the two conflicting objectives are performed using a binary coded firefly algorithm. The complete observability of the power system is first prepared and then, single line loss contingency condition is added to the main model. The practical measurement limitation of PMUs is also considered. The efficiency of the proposed method is validated on IEEE 14, 30, 57 and 118 bus test systems and a real and large- scale Polish 2383 bus system. The valuable approach of firefly algorithm is demonstrated in finding the optimal number of PMUs and their locations by comparing its performance with earlier works.

페이저 측정기 치적배치를 위한 초기 배치 전략 (An Initial Placement Strategy for Optimal Placement of Phasor Measurement Units in Power Systems)

  • 조기선;신중린;박종배;채명석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.342-344
    • /
    • 2002
  • This paper presents a new strategy to find starting points for placing optimally Phasor Measurement Units(PMUs). The performance of the starting point, initial placement set of PMUs, affect critically the computational burden and/or time, because the Optimal PMU Placement (OPP) problem is formulated the combinatorial optimization. By analyzing the properties of OPP solutions on IEEE sample systems in detail, a new strategy for initial PMU placement, in this paper, is proposed. To verify the performance of the suggested strategy, the comparison with the existing strategy and the new one, on IEEE sample systems. is performed. By using the new strategy, the numbers of search spaces to solve the OPP problem is drastically decreased.

  • PDF

A Substation-Oriented Approach to Optimal Phasor Measurement Units Placement

  • Bao, Wei;Guo, Rui-Peng;Han, Zhen-Xiang;Chen, Li-Yue;Lu, Min
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권1호
    • /
    • pp.18-29
    • /
    • 2015
  • State Estimation (SE) is the basis of a variety of advanced applications used in most modern power systems. An SE problem formed with enough phasor measurement units (PMUs) data is simply a linear weighted least squares problem requiring no iterations. Thus, designing a minimum-cost placement of PMUs that guarantees observability of a power system becomes a worthy challenge. This paper proposes an equivalent integer linear programming method for substation-oriented optimal PMU placement (SOOPP). The proposed method uses an exhaustive search to determine a globally optimal solution representing the best PMU placement for that particular power system. To obtain a more comprehensive model, contingencies and the limitation of the number of PMU measurement channels are considered and embodied in the model as changes to the original constraints and as additional constraints. The proposed method is examined for applicability using the IEEE 14-bus, 118-bus and 300-bus test systems. The comparison between SOOPP results and results obtained by other methods reveals the excellence of SOOPP. Furthermore, practical large-scale power systems are also successfully analyzed using SOOPP.

Extreme Learning Machine Approach for Real Time Voltage Stability Monitoring in a Smart Grid System using Synchronized Phasor Measurements

  • Duraipandy, P.;Devaraj, D.
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권6호
    • /
    • pp.1527-1534
    • /
    • 2016
  • Online voltage stability monitoring using real-time measurements is one of the most important tasks in a smart grid system to maintain the grid stability. Loading margin is a good indicator for assessing the voltage stability level. This paper presents an Extreme Learning Machine (ELM) approach for estimation of voltage stability level under credible contingencies using real-time measurements from Phasor Measurement Units (PMUs). PMUs enable a much higher data sampling rate and provide synchronized measurements of real-time phasors of voltages and currents. Depth First (DF) algorithm is used for optimally placing the PMUs. To make the ELM approach applicable for a large scale power system problem, Mutual information (MI)-based feature selection is proposed to achieve the dimensionality reduction. MI-based feature selection reduces the number of network input features which reduces the network training time and improves the generalization capability. Voltage magnitudes and phase angles received from PMUs are fed as inputs to the ELM model. IEEE 30-bus test system is considered for demonstrating the effectiveness of the proposed methodology for estimating the voltage stability level under various loading conditions considering single line contingencies. Simulation results validate the suitability of the technique for fast and accurate online voltage stability assessment using PMU data.

송전선로 파라메터 정밀 예측을 위한 페이저 측정기의 응용 (Estimation Technique of Power Transmission Line Parameter by Phasor Measurement Units)

  • 조기선;박종배;신중린
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.193-195
    • /
    • 2003
  • This paper presents an approach to estimate the power transmission line parameter by phasor measurement units(PMUs), which are synchronized to 1 pps signal of GPS. Existing approaches to estimate power transmission line parameter, are mainly off-line ones, based on faults or switching events on other neighboring lines. In this paper, to obtain static and dynamic properties of power transmission line parameter in service, the prototype of pmu-based Transmission Line Parameter Monitoring System (TLPMS) is proposed. Also, an technique to estimate parameters of transmission line described as 2-port network model and the soundness of estimated parameters are addressed.

  • PDF

Modified Transmission Line Protection Scheme in the Presence of SCC

  • Naeini, Ehsan Mostaghimi;Vaseghi, Behrouz;Mahdavian, Mehdi
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.533-540
    • /
    • 2017
  • Distance relay identifies the type and location of fault by measuring the transmission line impedance. However any other factors that cause miss calculating the measured impedance, makes the relay detect the fault in incorrect location or do not detect the fault at all. One of the important factors which directly changes the measured impedance by the relay is series capacitive compensation (SCC). Another factor that changes the calculated impedance by distance relay is fault resistance. This paper provides a method based on the combination of distance and differential protection. At first, faulty transmission line is detected according to the current data of buses. After that the fault location is calculated using the proposed algorithm on the transmission line. This algorithm is based on active power calculation of the buses. Fault resistance is calculated from the active powers and its effect will be deducted from calculated impedance by the algorithm. This method measures the voltage across SCC by phasor measurement units (PMUs) and transmits them to the relay location via communication channels. The transmitted signals are utilized to modify the voltage signal which is measured by the relay. Different operating modes of SCC and as well as different faults such as phase-to-phase and phase-to-ground faults are examined by simulations.

Optimal WAMS Configuration in Nordic Power System

  • Mohamed A.M. Hassan;Omar H. Abdalla;Hady H. Fayek;Aisha H.A. Hashim;Siti Fauziah Toha
    • International Journal of Computer Science & Network Security
    • /
    • 제23권3호
    • /
    • pp.130-138
    • /
    • 2023
  • The Smart grids are considered as multi-disciplinary power systems where the communication networks are highly employed. This paper presents optimal wide area measurement system (WAMS) configuration in Nordic power system. The transition from SCADA to WAMS becomes now trend in all power systems to ensure higher reliability and data visibility. The optimization applied in this research considered the geographical regions of the Nordic power system. The research considered all the devices of WAMS namely phasor measurement units (PMUs), phasor data concentrators (PDCs) and communication links. The study also presents two scenarios for optimal WAMS namely base case and N-1 contingency as different operating conditions. The result of this research presents technical and financial results for WAMS configuration in a real power system. The optimization results are performed using MATLAB 2017a software application.

Two Terminals Numerical Algorithm for Distance Protection, Fault Location and Acing Faults Recognition Based on Synchronized Phasors

  • Lee Chan-Joo;Park Jong-Bae;Shin Joong-Rin;Radojevic Zoran
    • Journal of Electrical Engineering and Technology
    • /
    • 제1권1호
    • /
    • pp.35-41
    • /
    • 2006
  • This paper presents a new numerical algorithm for fault location estimation and for faults recognition based on the synchronized phasors. The proposed algorithm is based on the synchronized phasor measured from the synchronized PMUs installed at two-terminals of the transmission lines. In order to discriminate the fault type, the arc voltage wave shape is modeled numerically on the basis of a great number of arc voltage records obtained by transient recorder. From the calculated arc voltage amplitude it can make a decision whether the fault is permanent or transient. The results of the proposed algorithm testing through computer simulation are given.

Preventive and Emergency Control of Power System for Transient Stability Enhancement

  • Siddiqui, Shahbaz A.;Verma, Kusum;Niazi, K.R.;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권1호
    • /
    • pp.83-91
    • /
    • 2015
  • This paper presents preventive and emergency control measures for on line transient stability (security) enhancement. For insecure operating state, generation rescheduling based on a real power generation shift factor (RPGSF) is proposed as a preventive control measure to bring the system back to secure operating state. For emergency operating state, two emergency control strategies namely generator shedding and load shedding have been developed. The proposed emergency control strategies are based on voltage magnitudes and rotor trajectories data available through Phasor Measurement Units (PMUs) installed in the systems. The effectiveness of the proposed approach has been investigated on IEEE-39 bus test system under different contingency and fault conditions and application results are presented.

An Improved Technique for Fault Location Estimation Considering Shunt Capacitance on Transmission Line

  • Kim Hyun-Houng;Jeong Yun-Won;Lee Chan-Joo;Park Jong-Bae;Shin Joong-Rin
    • Journal of Electrical Engineering and Technology
    • /
    • 제1권3호
    • /
    • pp.295-301
    • /
    • 2006
  • This paper presents a new two-terminal numerical algorithm for fault location estimation using the synchronized phasor in time-domain. The proposed algorithm is also based on the synchronized voltage and current phasor measured from the PMUs (Phasor Measurement Units) installed at both ends of the transmission lines. In this paper, the algorithm is given without shunt capacitance and with shunt capacitance using II -model and estimated using DFT (Discrete Fourier Transform) and LES (Least Error Squares Method). The algorithm uses a very short data window and classification for real-time transmission line protection. To verify the validity of the proposed algorithm, the Electro-Magnetic Transient Program (EMTP) and MATLAB are used.