• Title/Summary/Keyword: Phase-Based Benchmarking

Search Result 12, Processing Time 0.023 seconds

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

Uncertainty and sensitivity analysis in reactivity-initiated accident fuel modeling: synthesis of organisation for economic co-operation and development (OECD)/nuclear energy agency (NEA) benchmark on reactivity-initiated accident codes phase-II

  • Marchand, Olivier;Zhang, Jinzhao;Cherubini, Marco
    • Nuclear Engineering and Technology
    • /
    • v.50 no.2
    • /
    • pp.280-291
    • /
    • 2018
  • In the framework of OECD/NEA Working Group on Fuel Safety, a RIA fuel-rod-code Benchmark Phase I was organized in 2010-2013. It consisted of four experiments on highly irradiated fuel rodlets tested under different experimental conditions. This benchmark revealed the need to better understand the basic models incorporated in each code for realistic simulation of the complicated integral RIA tests with high burnup fuel rods. A second phase of the benchmark (Phase II) was thus launched early in 2014, which has been organized in two complementary activities: (1) comparison of the results of different simulations on simplified cases in order to provide additional bases for understanding the differences in modelling of the concerned phenomena; (2) assessment of the uncertainty of the results. The present paper provides a summary and conclusions of the second activity of the Benchmark Phase II, which is based on the input uncertainty propagation methodology. The main conclusion is that uncertainties cannot fully explain the difference between the code predictions. Finally, based on the RIA benchmark Phase-I and Phase-II conclusions, some recommendations are made.

Designing Processes for Ubiquitous-based Sport Business Model (유비쿼터스 기반 스포츠비즈니스모델 설계과정)

  • In, Sang-Woo
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.47-65
    • /
    • 2011
  • Business organizations are asked to create new business models utilizing current technological innovations such as ubiquitous computing technology for developing new domains of business to obtain a competitive advantage and achieve a sustainable development. This study was focused on the processes for developing new and practical business models. The purpose of this study was to propose ubiquitous sport business modeling processes from the modeling framework. In particular, this study focused on developing new, pragmatic, and effective sport business models, and this new type of business is defined as 'u-sport.' For design the business model, extensive literature reviews and case studies were conducted for benchmarking the cases and expert group review was conducted for developing u-sport business model framework. The suggested business modeling processes in this study were consisted of four phases; 1) organization strategy level setting phase, 2) business strategy level setting phase, 3) business structure level setting phase, and 4) service level setting phase. The modeling processes were verified to adapt ubiquitous sport business. This designing and modeling process is expected to play a significant role on enhancing the technology-based business environments as the process mainly focuses on the service and consumer oriented approach rather than technology and suppliers oriented approach. In conclusion, establishing sport business models by adapting the service modeling process will deliver an exponential growth and development of future ubiquitous based industry.

A Study on Reliability Program of the Armed Vehicles (무기체계 신뢰성 보증 방안 프로세스 구축 연구)

  • Lee, Chang Hee;Park, Du Il;Kim, Kyung Roo;Kim, Sang Boo
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.3
    • /
    • pp.221-238
    • /
    • 2015
  • Purpose: In this study, A reliability assurance model (or reliability program) is proposed to evaluate the reliability of an armed vehicle. The reliability assurance is performed through the reliability-centered activities during its life cycle of development/design, production, deployment, maintenance, and disposal. Methods: By reflecting the current situations of korea defense industry, a reliability assurance model is built up based on the benchmarking results of world leading companies' best practices in same fields. Results: The proposed reliability program of armed vehicles, which is based on the reliability program of ANSI/GEIA-STD 0009, uses DMAIC process of the six sigma methodology from design phase to testing and evaluation phase. Conclusion: This research is supposed to develop reliability program of armed vehicles by integrating DFSS, DFR and reliability growth process.

Optimization of Early-phase Ship Design using Set-Based Design and Genetic Algorithm (집합기반설계와 유전자알고리즘을 이용한 초기단계 함정설계 최적화)

  • Park, Jin-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.10
    • /
    • pp.486-492
    • /
    • 2019
  • The system-based approach is needed to select an optimal mix of weapon systems and ship platform among a variety of design alternatives with the uncertainties of the initial required operational capability. In the early-phase design, which included a feasibility study and concept design, it is possible to cause problems when a review of the operational concept, database development, and systematic design are not done, thereby producing uncertain and unstable requirements. To select the best solution without trial-and-error, the U.S. navy has applied the set-based method for the early-phase design of a new ship-to-shore connector. The ship synthesis model plays an important role in applying the set-based method, but only a few countries possess this model and have prohibited this model from being transferred to other countries. This paper suggests a set-based method using a genetic algorithm and decision-making theory through benchmarking existing ship data. The algorithm was verified using the DDG-51 class ship synthesis model to optimize the weapon system design, which has been released for research purposes.

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

Development of Meshless Method Using Least-Squares Method with Geometric Conservation Law for Structural Dynamic Analysis (기하학적 보존을 만족하는 최소제곱법을 활용한 무격자 구조해석 기법 개발)

  • Sang Woo Lee;Jin Young Huh;Kyu Hong Kim
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.1
    • /
    • pp.67-74
    • /
    • 2023
  • A meshless technique using the geometric conservation least-squares method (GC-LSM) was devised to discretize the governing equation of linear elasticity. Although the finite-element method is widely used for structural analysis, a meshless method was developed because of its advantages in a moving grid system. This work is the preliminary phase for developing a fully meshless-based fluid-structure interaction solver. In this study, Cauchy's momentum equation was discretized in strong form using GC-LSM for the structural domain, and the Newmark beta method was used for time integration. The solver was validated in 1D, 2D, and 3D benchmarking problems. Static and dynamic results were obtained. The results are more accurate than those of analytic solutions.

A Study on the Improvement for Design VE Job Plan through the Benchmarking (벤치마킹을 통한 설계VE 추진절차 개선에 관한 연구)

  • Um Ik-Jun;Jung Young-Il;Kim Chul-Woong;Hyun Chang-Teak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.88-95
    • /
    • 2001
  • To convert the construction industry from 'the high cost, the low efficiency' to 'the low cost, the high efficiency and value-added industry' and to enhance the performance and quality of products while reducing the cost, the related law and guideline were established and promulgated, which regulate that value engineering workshop during the preliminary design and the detail design stage should be a mandatory process. But VE practitioners are still confusing in choosing the proper value engineering process, because processes those are described in the various references use the different terms, steps and activities, even though they have their own specific characteristics. To resolve these confusions, the existing steps and activities of three kinds of the literature, four kinds of the organization's policy and other four kinds of study examples relating to the design VE were examined. And then, the differences and expecting problems were extracted through the comparison and analysis of those materials. After that, VE specialists' opinion through the questionnaire survey were grasped. Based on those studies the improved design VE Job Plan and activity statements were suggested.

  • PDF

Hybrid Techniques for Standard Cell Placement (표준 셀 배치를 위한 하이브리드 기법)

  • 허성우;오은경
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.30 no.10
    • /
    • pp.595-602
    • /
    • 2003
  • This Paper presents an efficient hybrid techniques for a standard cell placement. The prototype tool adopts a middle-down methodology in which an n${\times}$m grid is imposed over the layout area and cells are assigned to bins forming a global placement. The optimization technique applied in this phase is based on the Relaxation-Based Local Search (RBLS) framework [12]in which a combinatorial search mechanism is driven by an analytical engine. This enables a more global view of the problem and results in complex modifications of the placement in a single search“move.”Details of this approach including a novel placement legalization procedure are presented. When a global placement converges, a detailed placement is formed and further optimized by the optimal interleaving technique[13]. Experimental results on MCNC benchmarking circuits are presented and compared with the Feng Shui's results in[14]. Solution Qualifies are almost the same as the Feng Shui's results.

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.