• Title/Summary/Keyword: Permit & License System

Search Result 13, Processing Time 0.017 seconds

A Study on the Application of the Regulation of the Interior Materials in Entertainment Occupancy (다중이용업소의 내장재 규정의 적용에 관한 연구)

  • 이주헌;윤명오;김운형
    • Fire Science and Engineering
    • /
    • v.15 no.1
    • /
    • pp.100-107
    • /
    • 2001
  • A Interior material, a main cause of fire-growth and generating toxic gas when it burns, should be dealt with great care in life safety design. Nonetheless, it has been used recklessly with undue attention to its contribution to fire in particular in entertainment occupancy and causes many victims in fire. Therefore, this study attempts to examine the current use of interior material in Korea and find out what to be improved and enhanced in terms of related regulations. Based on the comparison and analysis of the Korea regulation with those of advanced nations, suggestions are made for an effective and efficient improvement and complement to the current system. What can be suggested from this study are as follows. The use of interior material should be controlled under the unified regulation of fire-safety codes. Code should be set up so that the current construction enforcement should be applied in retroactive to those entertainment buildings that obtained a license prior to the implementation of the system certifying that the building is fire-resistant and fire-protective. The legislation should be made to control the fire-protection facilities of small-sized, underground entertainments. It should be obliged to present the blueprint displaying the use of interior material at the time of changing occupancy. Or, it should be compelled to report changes that go way without permit to the administrative office. A compulsory provision should be set up to have a fire-resistant performance to movable furniture. The classification index designating the fire hazard of interior material by flame spread rate and smoke toxicity and its test method should be established.

  • PDF

A Study on the first inventor defense in the US patent law (미국에서의 선발명자 항변에 관한 연구)

  • Chang, Eun-Ik
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.6
    • /
    • pp.1319-1336
    • /
    • 2006
  • The successive round of talks oil Korea-USA Free Trade Agreement (FTA) has continued, and it also has the Intellectual property(IPR) unit. Until now, tile one of most disputing concerns in IPR unit through talks is the limitation of compulsory license of claimed invention. The US is urging to establish a safeguard for IPR, as similar measure of the US, to protecting the profit of the US enterprises through these on-going talks, it is more likely expected to take the offensive about infringement of the patent seriously. Based on the current circumstances, the provision strategy study is needed to obtain Korea inventors the first inventor defense under the US patent law system as well as understand the current Korea's patent law and its revision against that in the US. In patent Law, both nations with first to file system and first to invent system permit a prior user of an invention to continue to use the invention notwithstanding its subsequent patenting by another under being subject to certain qualifications and limitations, even though a patent by a later inventor is granted. Normally, the first inventor defense has been used to compensate the drawbacks of the first to file system. The US patent Law, however, adopting the first to invent system admits the first inventor defense. Therefore, pursuing counteract provision under consideration with Korean patent Law system and research environment along with investigating the reason why the US adopted its patent law system, the scope of right, and the new reform of Act. 2005 of the institute, which promotes the first Korean inventor to possess the defense right of the US, provides certain preparations for Korean companies against the expected offensive from the US ones under the US patent Law system.

  • PDF

A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project (공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究))

  • Kim Ki-Dae;Kim Byung-Ho
    • The Journal of Fisheries Business Administration
    • /
    • v.37 no.1 s.70
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF