Grouting Injection Effectiveness of a Permeable Compacting Grout using Permeable Compaction Type Packer (침투다짐형 팩커를 이용한 침투다짐 그라우트의 주입 효과)

  • Park, Sung-Yong;Shim, Houng-Gen;Kang, Hee-Jin;Lim, One-Bin;Kim, Yong-Seong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.2
    • /
    • pp.149-158
    • /
    • 2017
  • Permeating injection is commonly known as an ideal type of injection in grouting reservoir embankment, yet often-combined permeating and fracturing injection grouting operation can disturb the original soil. A grouting method has been regarded as effective and developed to ameliorate the possible disturbance problem. It involves compaction grouting with low expansive pressure near the injection hole and repetitive injection and compaction with grout material that allows ideal permeating injection. This thesis develops Hybrid Grout (ie. HG grout) that allows various application in any ground condition combined together, has high fineness and low viscosity, and expands permeation injection to silty sand. It researches on the injection effect of permeable compaction grout which is done with PC packer and is a combination of HG grout and expansion agent to obtain permeation compaction effect on the area near grout injection spot by developing Permeable Compaction Type Packer(ie. PC packer). As the developed PC packer, HG grout, and and expansion agent (HI-E) are applied to reservoir embankment reinforcement grouting, possibile permeation compaction effect that satisfies reservoir embankment grouting standard is confirmed according to the research.

Estimation of Reinforcement Effect of Superannuated Fill Dam Repaired by the Permeable Grouting Method (침투그라우팅이 시공된 노후필댐의 보수보강효과 평가)

  • Kim, Yungjin;Heo, Yol;Oh, Byunghyun
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.6
    • /
    • pp.45-52
    • /
    • 2007
  • Maintenance of structural and hydrological safety of the superannuated fill dam is very important subject on the viewpoint of disaster prevention. Mainly, the core of the superannuated fill dams have been damaged continuously by the various harmful external forces such as the typhoons, flash floods and earthquake, and these can be connected to the large scaled general dam failure. Therefore, the research on the repair, remediation and reinforcement of dam is necessary. In this study, the permeable grouting method for the remediation of fill dam was examined by the electrical resistivity survey and the change of permeability of core front. As a result, the permeable grouting method can be useful remediation method for the superannuated fill dam, the leakage from the core front decreased greatly before and after the construction of grouting. Furthermore, it can be said that the turbidity of fill dam may not be greatly increased by grouting.

  • PDF

A Study on the Ground Reinforcement and Impermeable Effect by McG (McG(맥) 주입공법에 의한 지반보강 및 차수효과에 관한 연구)

  • Jung, Jong-Ju;Do, Kyung-Yang;Shin, Tai-Wook;Park, Won-Chun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.581-590
    • /
    • 2005
  • The grouting method is widely used as the impermeable effect and ground reinforcement in construction. But, it has a problem that cement and grout material are not mixed well in the injection tip equipment and an opposite flow and interception state of the chemical grouting is happened. so, continuous work is difficult. McG method installed a special grouting and device, made possible go well mixing of grouting material and prevent flowing backward and block of nozzle also diversify powder rate of cement that is grouting material to select sutible material in layer conditions. YSS that lowered $Na_2O$ influencing durability and circumstance is developed by gel-forming reaction material. so eco-circumstance and durability is increased by minimizing dissolution of underground water. In this study, it is assumed that seepage state of the injection material using a special injection tip equipment and a unconfined compressive strenth by mixing a various injection material of various. And it is confirmed that strenth increase effect and permeable decrease of the improved body through the test execution and field execution.

  • PDF

The Impermeable Effect for Bedrock Constructed by Grouting (기반암에서 그라우팅에 의한 차수효과)

  • Yea, Geuguwen
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.2
    • /
    • pp.51-59
    • /
    • 2009
  • This study is based on field data obtained from rock grouting such as RQD value, Unit cement grout volume, Lugeon value(Lu), and Maximum grout pressure in four different dam sites. The relationship were analyzed and compared as follow. The cut-off effect after rock grouting in dam-foundation which are mostly consist of metamorphic rock is better than that of Sedimentary rock. And the impermeable effect after consolidation grouting is more efficiency than the impermeable effect after curtain grouting. The unit cement grout volume are increased as RQD value is higher in rock mass. But there is no relationship between RQD value and Lugeon value. In the sedimentary rock, which is more permeable than metamorphic rock, Lugeon value (Lu) is a linear function (Lu=0.22Vc) of unit cement grout volume (Vc). Cut-off effect of curtain grouting is less influential at each near holes which are already grouted than that of consolidation grouting. And the behavior characteristics of Lugeon value vs. the unit cement grout volume as the order of installations are almost the same.

  • PDF

A Study of the Compaction Effect of Expansive Admixture for the Development of an Expansive Compaction Packer

  • Kim, Jin-Chun;Park, Ki-Yeon;Lee, Dong-Ik;Lee, Gyu-Sang;Kim, Sang-Gyun;Yoo, Byung-Sun;Choi, Gi-Sung
    • The Journal of Engineering Geology
    • /
    • v.25 no.2
    • /
    • pp.179-188
    • /
    • 2015
  • Although permeating injection is ideal for grouting reservoir embankments, it is usually combined with fracturing injection for grouting, which can disturb the original soil. Compaction with low expansive pressure followed by grout injection can overcome this problem. An expansive compaction (EC) packer was developed in this work to easily apply sequential injection and compaction at a work site. Furthermore, to achieve compaction around the grouting hole, a mixture of expansive admixtures and grout was injected with the EC packer to trigger an increase in volume of the grout material. This work verifies the compaction effect of the EC packer and the expansive admixture. It reports the concepts of the EC packer, the range of expansive compaction, the effectiveness of injection, and the results of indoor tests performed to verify the effectiveness of the expansive admixtures. The indoor testing comprised a preparatory test and the main test. The preparatory test assessed the admixtures for their compaction effects, while the main test measured and analyzed the admixtures' expansive force, pressure, and compaction effect with a mold to verify the effectiveness of the compaction effect.

A Applicability Study on Single Grouted Column Method (C-RJP Grouting) for Buoyancy-Resistant Permanent Anchor in Highly Permeable Volcanic Clastic Zones (투수성이 높은 화산쇄설층에서 부력앵커 시공을 위한 단일공 차수공법 (C-RJP Grouting)의 적용성에 관한 연구)

  • Jung, Yonggun;Chae, Youngsu;Park, Byunghee;Kim, Jeongryeol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.8
    • /
    • pp.5-12
    • /
    • 2015
  • In this study, buoyancy-resistance permanent anchor was considered to prevent uplift pressure of a building structure. However, this test was failed to put anchor body in the boring hole because of the rapid outflow of ground water and coefficient of permeability. In addition, the hole where the anchor body was forcefully inserted constantly flew the sea water and cement. And it was found that anchor was not settled in the ground. In order to solve this problem, jet grouting method was applied to block the ground water and the single grouted column method was chosen to install the buoyancy-resistance permanent anchor. In this paper, the single grouted column method was applied with the general jet grouting methods and grout material was fixed by 3-field tests. These tests confirmed the effect of permeability and ground improvement with field permeability test by core sampling, Standard Penetration Test (SPT) and unconfined compression test. Confirming the stability of the buoyancy-resistance permanent anchor with installation and tension test, application of the single grouted column method in the volcanic clastic zones was verified.

Monitoring of grout material injected under a reservoir using electrical and electromagnetic surveys (전기비저항 및 전자탐사를 이용한 저수지 하부에 주입된 그라우트 재료의 모니터링)

  • Suzuki, Koichi;Oyama, Takahiro;Kawashima, Fumiharu;Tsukada, Tomoyuki;Jyomori, Akira
    • Geophysics and Geophysical Exploration
    • /
    • v.13 no.1
    • /
    • pp.69-79
    • /
    • 2010
  • In order to reduce leakage from a reservoir, a large amount of cement milk (grout) was injected from boreholes drilled around the shores of the reservoir, and monitored to establish the infiltration of cement milk into the bedrock under the reservoir. From laboratory tests using rock core samples, it was revealed that the resistivity of cement milk is much lower than that of the groundwater at this location. Therefore, it was expected that the resistivity of the zones filled with cement milk would be significantly reduced. Geophysical surveys are expected to be suitable methods to check the effectiveness of grouting in improving the water-retaining performance of a reservoir. DC electrical surveys (seven in total) and two Controlled Source Audio-frequency Magneto-Telluric (CSAMT) surveys were conducted along survey lines in the reservoir to monitor the infiltration of cement milk during the grouting. Extremely low resistivity zones ($10\;{\Omega}m$ or less) were observed in resistivity sections obtained by 2D inversion. The zones are inferred to be fractured zones filled with cement milk. In sections showing the rate of change of resistivity, three zones that showed significant change showed gradual expansion to deeper parts as the grouting progressed. These zones correspond to highly permeable zones detected by Lugeon tests at grout boreholes. We have confirmed that it is possible to measure the resistivity change by DC electrical and CSAMT surveys from the surface of the reservoir. It seems that such monitoring results could be reflected in future grouting plans.

Numerical Simulation for the Subsurface Temperature Distribution Disturbed by Heat-Pump Operation (지열펌프 구동에 의한 지중 온도 분포 변화 모델링 연구)

  • Shin, Ji-Youn;Bae, Gwang-Ok;Lee, Kang-Kun
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.40-43
    • /
    • 2006
  • Public demand for the heat pump system as a next generation energy equipment is increasing for its eco-friendly and cost-effective advantage. Many researches have been concentrated on how to calculate and develop its own efficiency, while the possible effect of the heat pump operation on the whole subsurface temperature distribution is relatively less considered, During the current study, subsurface temperature disturbance caused by seasonal surface temperature cycle in Busan area and general W-tube heat pump operation is simulated in 3-dimensional heterogeneous medium. It shows that subsurface deeper than 10m from the surface remains nearly unchanged throughout the 4 seasons and groundwater convect ion in highly permeable layer near the surface acts like a main path of heat plume from heat pump system, This implies the significance of detail descript ion in shallow sedimentary layer or highly permeable layer which plays an important role on the regional flow advection and heat transfer. Also, the effect of groundwater convection increases when the arrangement of the 2 injection pipes and 2 extract ion well is maintained parallel to groundwater flow. Therefore, more careful and detail investigation is required before installation and operation of heat pump system that it may not cause any possible change of microbial ecosystem in the shallow subsurface environment or 'contamination of temperature' for groundwater use as well as the loss of efficiency of the equipment itself. This can also help to design the optimized grouting system for heat pump.

  • PDF

Thermal Response Property of Grout Materials from In-situ Test and Temperature Variation of Ground Heat Exchanger (그라우트 재료별 열응답 특성 및 열교환기 운전온도 변화)

  • Kim, Kap-Duk;Lee, Soung-Ju;Yun, Yeo-Sang
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.769-775
    • /
    • 2008
  • The objective of this report is to determine the difference of thermal response that grouted two different materials, and compare the simulation result of the length of total ground heat exchanger length that using the ground thermal conductivity. And also to know heat exchange variation of ground heat exchanger temperature that measured with various test depth. The result shows that the test hole grouted with water permeable material got better thermal response than grouted with water impermeable material. However, with consideration of ingnore for the initial 12 hour data, the test hole grouted with impermeable material has larger thermal conductivity than the other. By former thermal conductivity, simulated data by engineering program shows only 3.4% difference or less. This result shows that ground thermal conductivity is not the main variables for the design program of ground heat exchanger. At the cooling or heating mode, base on the depth of -150m, the ground heat exchanger has best temperature at $-90{\sim}-60m$ and than getting worse because of entering water heat exchanged with leaving water in the same hole.

  • PDF

Critical face pressure and backfill pressure of shield TBM considering surface settlements of saturated clayey ground (쉴드 TBM 굴진에 따른 포화 점성토 지반의 침하거동을 고려한 한계 굴진면압과 한계 뒤채움압)

  • Kim, Kiseok;Oh, Ju-Young;Lee, Hyobum;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.433-452
    • /
    • 2018
  • The shield tunneling method can minimize surface settlements by preventing the deformation of tunnel face and tunnel intrados due to tunnel excavation. For this purpose, it is very important to control the operating conditions of shield TBM. The face pressure and backfill pressure for tail void grouting should be the most important and immediate measure not only to restrain surface settlement, but also to influence the effective stress and pore water pressure around the circumstance of tunnel during excavation. The reaction of the ground to the application of face pressure and backfill pressure relies on the stiffness and permeability of ground. Especially, the reaction of saturated clayey ground formations, which shows the time-dependent deformation, is different from the permeable ground. Hence, in this paper it was investigated how the TBM operating conditions, ground stiffness, and permeability impact on the surface settlement of saturated clayey ground. For this purpose, a series of parametric studies were carried out by means of the stress-pore water pressure coupled FE analysis. The results show that the settlement of soft clayey ground is divided into the immediate settlement and consolidation settlement. Especially, the consolidation settlement depends on the ground stiffness and permeability. In addition, the existence of critical face pressure and backfill pressure was identified. The face pressure and backfill pressure above the critical value may cause an unexpected increase in the ground settlement.