• 제목/요약/키워드: Periodic Safety Review (PSR)

검색결과 14건 처리시간 0.075초

고리 1호기 주기적안전성 평가 (PERIODIC SAFETY REVIEW ON KORI UNIT 1)

  • Kim, Tae-Ryong
    • 한국에너지공학회:학술대회논문집
    • /
    • 한국에너지공학회 2003년도 춘계 학술발표회 논문집
    • /
    • pp.403-414
    • /
    • 2003
  • Periodic safety review on Kori Unit 1 has been successfully done for the first time in Korea. 11 safety factors of the review were fully evaluated in accordance with the domestic legal system. Although it is the oldest nuclear power plant in Korea, Kori Unit 1 was found to have maintained good operating conditions and continuously enhanced its safety by implementing post-TMI action plans and other safety issues, such as replacing steam generators and process/control system. It can be therefore confirmed that safe operation of Kori Unit 1 is guaranteed until next periodic safety review. Nevertheless, some corrective action items were recommended to enhance further its safety level, such as equipment qualification, additional ageing management program, strengthening of some procedures related to administration and human factor. The results of PSR can be utilized for the continued operation beyond the design life as long as the plant safety is maintained and improved. Experiences of the PSR on Kori Unit 1 can be also applied to PSR on other plants.

  • PDF

원자로내부구조물 주기적 안전성평가 심사지침 개발 배경 (Development of Safety Review Guide for Periodic Safety Review of Reactor Vessel Internals)

  • 이기형;박정순;고한옥;정명조
    • 한국압력기기공학회 논문집
    • /
    • 제9권1호
    • /
    • pp.20-24
    • /
    • 2013
  • Reactor Vessel Internals(RVIs), which are installed within the reactor pressure vessel and support the fuel assembly, take responsibility for safety of reactor core. In operating Nuclear Power Plants(NPPs), the RVIs have been exposed to severe conditions such as neutron irradiation, high temperature, high pressure, and high velocity of coolant flow and have degraded by materials aging with long-term operation. Therefore, the effective aging management plan and the appropriate regulatory requirements are necessary to maintain the integrity of RVIs. The purpose of this paper is to provide a review guide for Periodic Safety Review(PSR) of RVIs in presurized water reactor. The review guide is developed based on the revised review guides and reports established from IAEA and USNRC, and the analysis results of design characteristics, aging mechanisms, and operating experiences of RVIs in domestic and international NPPs. Consequently, the developed review guide for PSR of RVIs is expected to contribute an overall strategy and standard for the PSR of RVIs.

CURRENT STATUS AND PROSPECT FOR PERIODIC SAFETY REVIEW OF AGING NUCLEAR POWER PLANTS IN KOREA

  • Jin, Tae-Eun;Roh, Heui-Young;Kim, Tae-Ryong;Park, Young-Sheop
    • Nuclear Engineering and Technology
    • /
    • 제41권4호
    • /
    • pp.545-548
    • /
    • 2009
  • Korean utility has utilized a Periodic Safety Review (PSR) that assesses the cumulative effects of plant aging, modifications, operating experience, technical developments, and site characteristics since 2000. In particular, the assessment and management of plant aging is one of the major areas in PSR. It includes identification of critical Systems, Structures, and Components (SSCs) for aging, assessment of aging effects, and implementation of aging management programs. Since the PSR system was introduced based on the atomic energy acts and related laws, PSRs of eight sets for 12 Nuclear Power Plants (NPPs) that have been operating more than 10 years have been completed. PSRs of two sets for 4 NPPs are currently being carried out. The utility has confirmed that domestic NPPs have been operated safely through these PSRs and have implemented the follow-up corrective activities to increase the nuclear safety. In this paper, the status of PSR implementation is discussed and improvement programs to conduct PSR follow-up corrective activities efficiently for NPPs are suggested based on experiences with aging assessments.

월성 1호기 주기적안전성평가 - 기체 및 액체 방사성폐기물에 의한 환경영향 (Periodic Safety Review of Wolsong Unit 1 - Environmental Impact as gaseous and liquid effluents)

  • 김성민;이은미;김미자;이갑복;정양근;엄희문
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2003년도 가을 학술논문집
    • /
    • pp.455-462
    • /
    • 2003
  • 원자력법에 의해 국내 모든 가동원전은 10년마다 주기적안전성평가를 이행하고 있다. 원자력법 시행규칙 제19조의 2에 제시된 환경영향 분야의 평가는 원자로시설의 환경영향 감시계획이 적절히 수립되어 이행되고 있는지를 확인하는 것이다. 평가결과 월성 1호기 가동에 따른 환경영향은 전반적으로 기술기준을 만족하였으며, 평가기준일까지 월성 1호기 운영으로 인해 주변 주민이 받는 방사선량은 제한치 이내에서 안전하게 관리되는 것으로 확인하였다.

  • PDF

중수로형 원자력 발전소 비상디젤발전기 주기적 안전성 평가 (Periodic Safety Review of EDG for CANDU Type Nuclear Power Plant)

  • 하체웅;한성흠;임우상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.666_667
    • /
    • 2009
  • 원자력발전소의 비상전력계통은 소외정전 시 발전소 안전정지에 필요한 안전관리 설비에 비상전력을 공급하는 계통으로 비상전력계통 모선에 비상디젤발전기(Emergency Diesel Generator : EDG)가 설치되어 있다. 본 논문에서는 국내 중수로형 원자력 발전소에 대해서 최초로 주기적 안전성 평가(Periodic Safety Review : PSR)을 수행한 결과를 기술하였다.

  • PDF

Cs-137 distribution around Kori Nuclear Power Plant

  • Lee, H.;Kang, H.S.;Choi, H.J.;Yu, D.H.;Lim, K.M.;Choi, Y.H.
    • Journal of Radiation Protection and Research
    • /
    • 제28권4호
    • /
    • pp.349-351
    • /
    • 2003
  • To ensure the safety of the currently operating nuclear power plant, the Periodic Safety Review program has been conducted. In PSR program, the cumulative behavior of the radionuclide that might be released from the power plant is addressed. The Cs-137 in soil around Kori nuclear power plant was investigated. The soil sample was analyzed and compared with the reference area. The model calculation explained the depth profile of Cs-137.

TECHNICAL EVALUATION OF THE CONTINUED OPERATION OF NPP

  • Kim, Tae-Ryong;Jin, Tae-Eun
    • Nuclear Engineering and Technology
    • /
    • 제40권4호
    • /
    • pp.277-284
    • /
    • 2008
  • Recently, the long-term operation of a nuclear power plant beyond its licensed term has become a worldwide trend as long as the safety of the plant is maintained in the extended period. Kori Unit 1, the oldest PWR in Korea, is the foremost example of this type of long-term operation in Korea. Comprehensive technical evaluation of the long-term operation of this plant was completed to confirm the overall safety of the plant. The technical evaluation included a review of PSR results, an assessment on aging management programs and time limited aging analyses, and a statement of radiological impact on the environment. Based on all of the results of the technical evaluation activities, Kori Unit 1 was approved to operate for an additional 10 years beyond its original design life of 30 years.