• Title/Summary/Keyword: Periodic Maintenance Period

Search Result 59, Processing Time 0.023 seconds

Optimal Periodic PM Schedules Under $ARI_1$ Model with Different Pattern of Wear-Out Speed

  • Lim Jae-Hak
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.121-129
    • /
    • 2005
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate of amount proportional to the failure intensity, which increases since the last PM and slows down the wear-out speed to that of new one. And the proportion of reduction in hazard rate decreases with the number of PMs. Our model is similar to $ARI_1$ proposed by Doyen and Gaudoin(2004) in the sense of reduction of hazard rate. Our model has totally different wear-out pattern of hazard rate after PM's, however, and the proportion of reduction depends on the number of PM's. Assuming that the system undergoes only minimal repairs at failures between PM's, the expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

  • PDF

Development of Stochastic Decision Model for Estimation of Optimal In-depth Inspection Period of Harbor Structures (항만 구조물의 최적 정밀점검 시기 추정을 위한 추계학적 결정모형의 개발)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.2
    • /
    • pp.63-72
    • /
    • 2016
  • An expected-discounted cost model based on RRP(Renewal Reward Process), referred to as a stochastic decision model, has been developed to estimate the optimal period of in-depth inspection which is one of critical issues in the life-cycle maintenance management of harbor structures such as rubble-mound breakwaters. A mathematical model, which is a function of the probability distribution of the service-life, has been formulated by simultaneously adopting PIM(Periodic Inspection and Maintenance) and CBIM(Condition-Based Inspection and Maintenance) policies so as to resolve limitations of other models, also all the costs in the model associated with monitoring and repair have been discounted with time. From both an analytical solution derived in this paper under the condition in which a failure rate function is a constant and the sensitivity analyses for the variety of different distribution functions and conditions, it has been confirmed that the present solution is more versatile than the existing solution suggested in a very simplified setting. Additionally, even in that case which the probability distribution of the service-life is estimated through the stochastic process, the present model is of course also well suited to interpret the nonlinearity of deterioration process. In particular, a MCS(Monte-Carlo Simulation)-based sample path method has been used to evaluate the parameters of a damage intensity function in stochastic process. Finally, the present stochastic decision model can satisfactorily be applied to armor units of rubble mound breakwaters. The optimal periods of in-depth inspection of rubble-mound breakwaters can be determined by minimizing the expected total cost rate with respect to the behavioral feature of damage process, the level of serviceability limit, and the consequence of that structure.

Determination of Optimal Replacement Period for A Multicomponent System Consider with Failure Types (고장형태(故障形態)를 고려(考慮)한 다부품장비(多部品裝備)의 최적교환시기(最適交換時期) 결정(決定))

  • Lee, Seung-Jun;Gang, Chang-Uk;Hwang, Ui-Cheol
    • Journal of Korean Society for Quality Management
    • /
    • v.19 no.2
    • /
    • pp.117-124
    • /
    • 1991
  • In this paper, it is assumed that a system is composed of an essential unit and a nonessential unit. During the running of the system, an essential unit is replaced at periodic replacement time T or at nth failure of essential unit whichever occurs first. Nonessential unit is replaced at its failure and at the replacement of essential unit. This paper derive optimal replacement period which minmises the total expected cost for replacement. The unimodality of totoal maintenance cost function is proved under the assumption that hazard rate of each component is continuous and monotone increasing failure rate(IFR). Based on this condition, it is shown that the optimal replacement period is finite and unique.

  • PDF

A Study on the Effect of Design Reliability and Periodic Inspection Cycle on Storage Reliability : Focusing on One-shot Logistic Equipment System (설계신뢰도 및 정기검사주기가 저장신뢰도에 미치는 영향에 관한 연구 : 일회성 군수장비 시스템을 대상으로)

  • Chu, Yeon-Won
    • Journal of the Korea Convergence Society
    • /
    • v.9 no.7
    • /
    • pp.223-230
    • /
    • 2018
  • In the case of a one-shot logistic equipment system that has been stored for a long time, reliability changes with the passage of time. Therefore, when the time comes to use, the storage reliability of the product is an important quality characteristic, and the existing studies have focused on the research for calculating the optimal period inspection cycle to improve the storage reliability. In this study, we analyzed the influence of the two factors on the storage reliability at the convergence point by analyzing the design reliability as well as the periodic inspection cycle. To do this, we applied the existing Martinez storage reliability model to the missile, a representative product of a one-shot system, and analyzed the quantitative effects of the design reliability and the periodic inspection cycle. From the results of the analysis, it was confirmed that the maintenance of the periodic inspection cycle is more important for the improvement of the storage reliability than the design reliability in the design reliability category of the current product.

Long-term evaluation of teeth and implants during the periodic maintenance in patients with viral liver disease

  • Yoon, Da-Le;Kim, Yong-Gun;Cho, Jin-Hyun;Lee, Sang-Kyu;Lee, Jae-Mok
    • The Journal of Advanced Prosthodontics
    • /
    • v.8 no.4
    • /
    • pp.321-328
    • /
    • 2016
  • PURPOSE. This study was designed to investigate the maintenance of teeth and implants in patients with viral liver disease. MATERIALS AND METHODS. 316 patients without any significant systemic disease were selected as a control group. Liver disease group was consisted of 230 patients. Necessary data were collected using clinical records and panoramic radiographs. Then, the patients were subdivided into 2 groups based on the type of active dental therapy received before maintenance period (Pre-Tx). Analysis for finding statistically significant difference was performed based on the need for re-treatment of active dental therapy (Re-Tx) and change in the number of teeth (N-teeth) and implants (N-implants). RESULTS. Comparing to control group, the patients with liver disease showed higher value on N-teeth, N-implants, and Re-Tx. Statistically significant differences were found on N-teeth (P=.000) and Re-Tx (P=.000) in patients with non-surgical Pre-Tx. Analysis based on severity of liver disease showed that N-teeth and Re-Tx were directly related to severity of liver disease regardless of received type of Pre-Tx. Significant differences were found on N-teeth (P=.003) and Re-Tx (P=.044) in patients with non-surgical Pre-Tx. CONCLUSION. In this study, it was concluded that liver disease might influence the loss of teeth and cause the relapse of dental disease during maintenance period in patients. A significant positive relationship between tooth and implant loss and severity of liver disease seems to exist.

A Study on the Diagnosis of Thermal Performance in the Steam Turbine for Generation (발전용 증기터빈 열성능 진단에 관한 연구)

  • Kim, Kwang-Hong;Hong, Eun-Kee;Hwang, Kwang-Won;Jang, Chul-Ho;Kim, Si-Moon
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3236-3240
    • /
    • 2007
  • This paper describes the results of steam turbine performance tests. The objectives of performance test is to exactly evaluate the degradation(decrease in performance) of the coal-fired steam turbine generator in order to provide plant information to help performance engineers identify problems, improve performance, and make economic decisions about scheduling maintenance and optimizing operation. To achieve these goals, the periodic thermal performance tests have been carried out since the initial operation period, 1997. We made the calculation program and guidelines for the tests and developed the performance index of the turbine cycle on the basis of the ASME PTC. By comparing the performance changes throughout the whole operation period, we confirmed the performance reliabilities of the turbine and its conditions.

  • PDF

Determination of the Resetting Time to the Process Mean Shift based on the Cpm+ (Cpm+ 기준에서의 공정평균이동에 대한 재조정 기간 결정)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.1
    • /
    • pp.110-117
    • /
    • 2018
  • Machines and facilities are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. By the result of degeneration, non-conforming products and malfunction of machine occur. Therefore a periodic preventive resetting the process is necessary. This type of preventive action is called 'preventive maintenance policy.' Preventive maintenance presupposes that the preventive (resetting the process) cost is smaller than the cost of failure caused by the malfunction of machine. The process mean shift problem is a field of preventive maintenance. This field deals the interrelationship between the quality cost and the process resetting cost before machine breaks down. Quality cost is the sum of the non-conforming item cost and quality loss cost. Quality loss cost is due to the deviation between the quality characteristics from the target value. Under the process mean shift, the quality cost is increasing continuously whereas the process resetting cost is constant value. The objective function is total costs per unit wear, the decision variables are the wear limit (resetting period) and the initial process mean. Comparing the previous studies, we set the process variance as an increasing concave function and set the quality loss function as Cpm+ simultaneously. In the Cpm+, loss function has different cost coefficients according to the direction of the quality characteristics from target value. A numerical example is presented.

Reliability Analysis for Decoy using Maintenance Data (정비 데이터를 이용한 기만체계 신뢰도 분석)

  • Gwak, Hye-Rim;Hong, Seok-Jin;Jang, Min-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.82-88
    • /
    • 2018
  • The decoy defensive weapon system is a one-shot system. Reliability is maintained through periodic inspection and high reliability is required to confirm whether or not the functioning is normal after launch. The maintenance cycle of a decoy was set up without target reliability and reliability prediction during the development period. However, the number of operations in the military has been increasing, necessitating the optimization of the maintenance cycle. Reliability is analyzed using the maintenance data of a decoy operated for several decades and the optimal maintenance cycle is suggested. In chapter 2, data collection and classification methods are presented and analysis methodology is briefly introduced. In chapter 3, the data distribution analysis and fitness verification confirmed that applying the Weibull distribution is the most suitable for the maintenance data of the decoy. In chapter 4, we present the analysis result of percentile, survival probability and MTBF and the optimal maintenance cycle was derived from the reliability analysis. Finally, we suggest the application methods for this paper in the future.

Optimal Inspection Policy for One-Shot Systems Considering Reliability Goal (목표 신뢰도를 고려한 원-샷 시스템의 최적검사정책)

  • Jeong, Seung-Woo;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.96-104
    • /
    • 2017
  • A one-shot system (device) refers to a system that is stored for a long period of time and is then disposed of after a single mission because it is accompanied by a chemical reaction or physical destruction when it operates, such as shells, munitions in a defense weapon system and automobile airbags. Because these systems are primarily related with safety and life, it is required to maintain a high level of storage reliability. Storage reliability is the probability that the system will operate at a particular point in time after storage. Since the stored one-shot system can be confirmed only through inspection, periodic inspection and maintenance should be performed to maintain a high level of storage reliability. Since the one-shot system is characterized by a large loss in the event of a failure, it is necessary to determine an appropriate inspection period to maintain the storage reliability above the reliability goal. In this study, we propose an optimal inspection policy that minimizes the total cost while exceeding the reliability goal that the storage reliability is set in advance for the one-shot system in which periodic inspections are performed. We assume that the failure time is the Weibull distribution. And the cost model is presented considering the existing storage reliability model by Martinez and Kim et al. The cost components to be included in the cost model are the cost of inspection $c_1$, the cost of loss per unit time between failure and detection $c_2$, the cost of minimum repair of the detected breakdown of units $c_3$, and the overhaul cost $c_4$ of $R_s{\leq}R_g$. And in this paper, we will determine the optimal inspection policy to find the inspection period and number of tests that minimize the expected cost per unit time from the finite lifetime to the overhaul. Compare them through numerical examples.

Rhythmic Gene Expression in Somite Formation and Neural Development

  • Kageyama, Ryoichiro;Niwa, Yasutaka;Shimojo, Hiromi
    • Molecules and Cells
    • /
    • v.27 no.5
    • /
    • pp.497-502
    • /
    • 2009
  • In mouse embryos, somite formation occurs every two hours, and this periodic event is regulated by a biological clock called the segmentation clock, which involves cyclic expression of the basic helix-loop-helix gene Hes7. Hes7 expression oscillates by negative feedback and is cooperatively regulated by Fgf and Notch signaling. Both loss of expression and sustained expression of Hes7 result in severe somite fusion, suggesting that Hes7 oscillation is required for proper somite segmentation. Expression of a related gene, Hes1, also oscillates by negative feedback with a period of about two hours in many cell types such as neural progenitor cells. Hes1 is required for maintenance of neural progenitor cells, but persistent Hes1 expression inhibits proliferation and differentiation of these cells, suggesting that Hes1 oscillation is required for their proper activities. Hes1 oscillation regulates cyclic expression of the proneural gene Neurogenin2 (Ngn2) and the Notch ligand Delta1, which in turn lead to maintenance of neural progenitor cells by mutual activation of Notch signaling. Taken together, these results suggest that oscillatory expression with short periods (ultradian oscillation) plays an important role in many biological events.