• 제목/요약/키워드: Performance verification device

검색결과 164건 처리시간 0.026초

날개의 전개성능 확인을 위한 공압식 시험장치 성능 해석 (Performance Analysis of Pneumatic Device for Verification of Canard Deployment Performance)

  • 이동훈
    • 한국군사과학기술학회지
    • /
    • 제19권2호
    • /
    • pp.145-154
    • /
    • 2016
  • In this paper, a pneumatic device for the deployment performance verification of canards deployed by inertia has been designed and the performance of the pneumatic device has been proven through analysis and tests. The pneumatic conveying process, orifice opening process and piston movement process of the pneumatic device were investigated by using numerical methods. The orifice diameter, pressure in a pressure tank and type of gas were regarded as the main design parameters of the pneumatic device. The error rate between analysis and test results under the same conditions was within 4 %. The accuracy of numerical methods used in this study were validated.

터널 숏크리트 응력계의 성능검증과 신뢰성 시험 연구 (Performance Verification and Reliability Test of Tunnel Shotcrete Stressmeter)

  • 김영배;박영배;이성원;이강일
    • 한국지반공학회논문집
    • /
    • 제40권4호
    • /
    • pp.113-126
    • /
    • 2024
  • NATM 터널에서 숏크리트의 응력측정은 계측기기의 신뢰도를 검증할 방법, 절차, 규정 등에 관한 연구 부족으로 인해 터널현장에서는 성능검증 없이 숏크리트 응력계가 설치 및 관리되고 있다. 본 연구에서는 일체형 및 셀타입 숏크리트 응력계의 외관검사, 구조·기능검사를 통해 불량 원인 및 문제점을 파악하고, 성능검사는 1차 시험으로 센서에 직접 하중을 재하하는 방식으로 하고, 셀타입 숏크리트 응력계는 KOLAS인증을 받은 성능검증장치를 국내 최초로 개발하여 성능검사를 실시하였다. 2차 시험으로 콘크리트 몰드시험을 통하여 일체형 및 셀타입 숏크리트 응력계의 구조적인 문제점을 파악하고 개선방안과 성능검증 절차를 제시하였다. 본 연구는 향후 숏크리트 응력계의 성능검증을 위한 규정 마련과 현장에서 계측기기를 선정하는 데 도움이 될 것으로 판단된다.

GIS용 피뢰기 누설전류 측정장치 성능개선 (The Performance Improvement of Lightning Arrester Leakage Current Measuring Device for GIS)

  • 김원규;김민수;백영식
    • 전기학회논문지
    • /
    • 제63권12호
    • /
    • pp.1726-1731
    • /
    • 2014
  • This paper shows the developed new lightning arrester LCM (Leakage Current Measuring device) which is important element of GIS (Gas Insulated Switchgear) Preventive & Diagnostic system and verify its performance though strengthened test standards. The existing lightning arrester LCM was modified to solve measuring errors which happened frequently. At first, we explained the principle of measuring leakage current. Through analyzing some problems which the existing LCM have. we got some improvable items. For the performance verification of the improved LCM, we manufactured prototype LCM which is applied some improvable items such as improving LCM circuit, adding protection circuit, optimizing inner structure of LCM and changing ground design. After then we carried out the performance test. Accredited testing laboratory carried out the performance verification test according to performance test criteria and procedure of reliability test standards, IEC-60225, 61000 and 60068 etc. We confirmed the test results which correspond with the performance test criteria. Also, we confirmed the performance of the improved LCM installed & being operated at G Substation through the immunity test against the normal noise and open/close surge etc.

Verification for the design limit margin of the power device using the HALT reliability test

  • Chang, YuShin
    • 한국컴퓨터정보학회논문지
    • /
    • 제23권11호
    • /
    • pp.67-74
    • /
    • 2018
  • The verification for the design limit margin of the power device for the information communication and surveillance systems using HALT(Highly Accelerated Life Test) reliability test is described. The HALT reliability test performs with a step stress method which change condition until the marginal step in a design and development phase. The HALT test methods are the low temperature(cold) step stress test, the high temperature(hot) step stress test, the thermal shock cyclic stess test, and the high temperature destruct limit(hot DL) step stress test. The power device is checked the operating performance during the test. In this paper, the HALT was performed to find out the design limit margin of the power device.

프리페치 요구를 지원하는 PCI 2.2 타겟 컨트롤러 설계 및 검증 (Design and Verification of PCI 2.2 Target Controller to support Prefetch Request)

  • 현유진;성광수
    • 정보처리학회논문지A
    • /
    • 제12A권6호
    • /
    • pp.523-530
    • /
    • 2005
  • PCI 2.2 마스터 디바이스가 타겟 디바이스로부터 데이터를 읽어 오고자 할 때 타겟 디바이스는 내부적으로 데이터를 준비해야 함으로 인해 PCI 버스가 데이터 전송 없이 점유되는 상황이 발생한다. 이를 위해 PCI 2.2 사양에서는 지연전송을 제안하여 전송 효율을 향상시켰지만 이 역시 타겟 디바이스가 얼마의 데이터를 미리 준비 해둘지를 알 수 없어 버스 사용 및 데이터 전송 효율을 떨어뜨리는 원인을 제공한다. 이에 앞선 연구에서는 이를 해결하기 위한 프리페치 요구를 이용하는 새로운 방법을 제안하였다. 본 논문에서는 이 방법을 지원하는 PCI 타겟 컨트롤러와 로컬 디바이스를 설계하였다. 설계된 PCI 타겟 컨트롤러는 간단한 로컬 인터페이스를 가질 뿐 아니라 PCI 2.2를 전혀 모르는 사용자도 쉽게 PCI 인터페이스를 지원할 수 있도록 설계되었다. 또한 설계된 하드웨어를 효과적으로 검증하기 위한 방법으로 기본 동작 검증, 설계 기반검증, 그리고 랜덤 테스트 검증을 제안하였다 이러한 검증을 위해 테스트 벤치와 테스트 벤치를 동작시키는 위한 명령어를 제안하였다. 그리고 랜덤 테스트를 위해 참조 모델, 랜덤 발생기, 비교 엔진으로 구성된 테스트 환경을 구축하였으며 이를 이용해 코너 케이스를 효과적으로 검증할 수 있다. 또한 제안된 테스트 환경을 통해 시뮬레이션 한 결과, 프리페치 요구를 이용한 제안된 방법이 지연 전송에 비해 데이터 전송 효율이 평균 $9\%$ 향상되었다.

Performance Analysis of a Mixed-Flow Pump for Waterjet Propulsion

  • Ahn Jong-Woo;Kim Ki-Sup;Park Young-Ha;Kim Kyung-Youl;Oh Hyoung-Woo
    • Journal of Ship and Ocean Technology
    • /
    • 제9권2호
    • /
    • pp.11-20
    • /
    • 2005
  • A mixed-flow pump is largely applied for waterjet propulsion in high-speed vessels because of excellent cavitation performance. For the present study, we analyze the performance of mixed-flow pump, which is composed of impeller and stator. The test device for a mixed-flow pump was installed in the test section in the KRISO cavitation tunnel. The performance tests of two mixed-flow pumps were carried out with the test device at various flow rates using various nozzles. The test results agree fairly well with the predicted results by commercial CFD code. The test device is available for verification of impeller performance together with CFD analysis

축소모형 방음벽 상단장치의 성능예측 및 평가에 관한 연구 (A Study on the Performance Prediction and Evaluation of Scale Down Noise Reducing Device on the Top of Noise Barrier)

  • 윤제원;김영찬;장강석;홍병국
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2844-2851
    • /
    • 2011
  • The purpose of this study is to set up an acoustic prediction technique and to perform the IL test of scale down noise reducing device for the development of the noise reducing device as the development of 400km/h class high speed train. First of all, the IL prediction of noise reducing device was performed with the 2D BEM method. And the noise test of scale down noise reducing device in anechoic chamber was performed for the verification of acoustic prediction technique and IL performance evaluation. As the results, the acoustic prediction technique for the development of noise reducing device was verified because the averaged IL difference between prediction and test is in 2dB(A). And the measured IL value of noise reducing device is less than 2dB(A), and additional IL with polyester absorption material is increased about 0.5dB(A).

  • PDF

분산전원이 연결된 22.9[kV] 배전계통의 양방향 보호기기 실증시험 연구 (The Study on the Actual Examination of the Bidirectional Protection Device in the 22.9[kV] Distribution Power System Interconnected with the DG)

  • 이흥재;최명호
    • 조명전기설비학회논문지
    • /
    • 제25권10호
    • /
    • pp.102-108
    • /
    • 2011
  • The existing power flow has a single direction to the line end but the bidirectional power flow will possibly occur depending on the output capacity in the 22.9[kV] distribution power system connected with the dispersed generation(DG). So these characteristics would influence the power system management. The DG have many advantages such as assistance source, Load share etc. So the utility must apply the bidirectional protection system so as to maximize an advantage of DG. This paper describes the field test case of bidirectional protective device in order to investigate the device performance when applied to bidirectional power system. We have tested in the power system test site of KEPCO and these tests provide the basis for performance verification test of bidirectional protective device in the power system.

조합기법을 이용한 다중생체신호의 특징추출에 의한 실시간 인증시스템 개발 (Development of Real-Time Verification System by Features Extraction of Multimodal Biometrics Using Hybrid Method)

  • 조용현
    • 한국산업융합학회 논문집
    • /
    • 제9권4호
    • /
    • pp.263-268
    • /
    • 2006
  • This paper presents a real-time verification system by extracting a features of multimodal biometrics using hybrid method, which is combined the moment balance and the independent component analysis(ICA). The moment balance is applied to reduce the computation loads by extracting the validity signal due to exclude the needless backgrounds of multimodal biometrics. ICA is also applied to increase the verification performance by removing the overlapping signals due to extract the statistically independent basis of signals. Multimodal biometrics are used both the faces and the fingerprints which are acquired by Web camera and acquisition device, respectively. The proposed system has been applied to the fusion problems of 48 faces and 48 fingerprints(24 persons * 2 scenes) of 320*240 pixels, respectively. The experimental results show that the proposed system has a superior verification performances(speed, rate).

  • PDF

철도 소프트웨어 개발 및 검증을 위한 지침 (The guideline for development and verification of railway software)

  • 이영준;최종균;차경호;천세우;이장수;권기춘;정의진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.659-664
    • /
    • 2008
  • The Railroad Safety Act's regulation reads as follows. "The Minister of Construction and Transportation may qualify and authorize the product to guarantee performance and safety of parts, machine, and device used in Railway fields." Another regulation reads as follows."“The guidelines about targets, standards, and procedures of Quality and Authority in first provision are decided as Ministry of Construction and Transportation Decree." The software used in rail cars and facilities is considered as a railway product. Therefore, it is qualified and authorized for acquiring the safety of rail cars and facilities. The software businesses shall again a Quality and Authority for applying a software to the rail cars and facilities. This paper regulates some guidelines that are needed to develop a software. The procedures that a software developer performs are divided by plan, requirement, design, implementation, and maintenance. The procedures that a software verification person performs are classified by verification plan, requirement verification, design verification, implementation verification, testing verification, maintenance verification, and safety activity. The entire processes and detailed activities to develope and verify a software are described as new guidelines.

  • PDF