International conference on construction engineering and project management
/
2009.05a
/
pp.1340-1345
/
2009
Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.
A performance measurement system for safety management was suggested with which performance of a company's safety activities can be expressed rationally, and analysis of impact with performance improvement. A key of the measurement system is performance index of the safety management activities, which consists of 3 perspectives; an external perspective, an internal perspective, and a innovation & learning perspective. Every perspective consists of 18 performance indices and each indices consist of activity unit a such planning, support, implementation, evaluation and review.
Journal of the Korean Operations Research and Management Science Society
/
v.40
no.1
/
pp.185-198
/
2015
This study drew performance management factors analyzed a causal link between acceptance and satisfaction of performance management to present the method for promoting acceptance on the performance management system that most of the public enterprises, government-affiliated organizations are implementing. To achieve this, qualitative analysis and quantitative analysis were conducted in parallel through in-depth case studies and surveys. The results of this study are as follows. First, the analysis of the performance management factors with preceding studies shows that performance management indicators, performance management operations and performance management communications. Second, from the causal relationship of performance management factors affecting performance management acceptance reveals that performance management operation has statistical significance. Third, the analysis of the effect of performance management factors on the management satisfaction shows that operation and indicator of the performance management have statistical significance and reflecting the performance indicators to business, adequacy of target level, training, system support and CEO's Leadership have been revealed as important variables to the management satisfaction. Fourth, the result of the analysis on casual connection between acceptance and satisfaction of the performance management shows that improving management acceptance has a direct impact on satisfaction because performance management receptiveness were deemed statistically significant. Fifth, the result of the in-depth case studies on improving performance management acceptance shows that public enterprises have been putting in an effort to design indicators and try to encourage internal member's involvement during the monitoring and evaluation. The quantitative analysis based on survey has turned out that performance management operation and performance management indicators have statistical significance. The qualitative analysis by in-depth analysis shows that public enterprises put a lot of effort to performance management indicators and communication between internal members. As a result, commitment to performance management operation is required to improve the performance management acceptance. In other words, a detailed implementation plan for training, information system support, and CEO's leadership has to be established and ought to be pushed.
Proceedings of the Korea Society for Industrial Systems Conference
/
1997.11a
/
pp.303-320
/
1997
In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.
Journal of Korean Society of Industrial and Systems Engineering
/
v.2
no.2
/
pp.39-51
/
1979
In introducing and applying the budget management system, the question of how to establish management structure(skelton) representing budget management responsible unit is significantly related to the degree of accuracy and analysis on the performance measurement of standard work unit. We have the following rational process of establishing performance measurement of budget management System ; 1) Standardization of work method 2) Establishment of management structure 3) Institution of budget management system. Especially, this system is based on a premise of efficiency of objectives management, it is assumed that performance measurement in the standard work unit must be enforced according to the basis and categories of performance evaluation based on the evaluating work unit. Therefore, most of all, the following three detail questions(subjects) are to be determined in order to rationalize these above principles to a maximum possible extent of performance measurement system. First, we established respective performance standard unit with respect to such detailed work unit, performance standard unit of which were accurately applicable directly from using the budget ana objectives account data and their supplementary data of the work measurement techniques. Second, by using the above mentioned question, over all evaluation and suggestion are made based on the study of the recording for each work unit development, budget management and production nit (volume of production) Third, the measurement of performance of budget management system is based on the principle of standard work unit, compared with the standard basis and actual work unit by period and activities unit and calculated percentage effectiveness according to the above procedure. and so evaluated the efficiency of performance measurement on the budget management system.
The purpose of this research is to identify a mediating effect of change management activity(CMA) on the relationships between the role of participants of ERP implementation and system performance. In this paper the role of participants are composed of top's management, user's participation, project manager's skill. Also this research organized ERP system performance into the three dimensions(adaptation to the end-user's ERP system, system usage, individual's performance). The major results of this research can be summarized as follow; project manager's role, top management's involvement, and users' participation in ERP project directly affect CMA of system implementation process and have influence system performance through CMA too. CMA also has a positive effect on a series of system performance, that is, adaptation to the end-user's ERP system, system usage, and individual's performance. In conclusion, the role of participants have an considerable influence upon system performance through CMA. This research makes certain that a mediating effect of CMA between the role of participants and system performance exists. Therefore, the companies implementing ERP must consider CMA.
Journal of Korea Society of Digital Industry and Information Management
/
v.18
no.1
/
pp.163-177
/
2022
The purpose of this study is to analyze the impact of quality management system requirements, which are techniques for management innovation to secure competitiveness of small and medium-sized manufacturers, on management performance as economic uncertainties increase and non-face-to-face culture spread. To this end, a survey was conducted on small and medium-sized manufacturing companies that maintain ISO certification. As a result of the study, first, it was found that planning had a positive effect on management performance among the requirements of the quality management system. Second, it was found that improvement among the requirements of the quality management system had a positive effect on management performance. Third, in the relationship between the requirements of the quality management system and management performance, leadership was found to have a complete mediating effect on planning. This means that the CEO plays a large role in establishing strategies for companies to gain a competitive advantage and will contribute to establishing all measures.
Journal of Information Technology Applications and Management
/
v.24
no.1
/
pp.63-79
/
2017
This study is a subsequent research results of Lee and Hwang (2015) and presents results of the case in which an information system is developed and applied for the performance management scheme proposed by the early study. This study aims to provide the organizations that want to implement and apply an effective IS operational performance management scheme with the practical alternatives that they may consider. This study first summarize the major contents of the performance management scheme proposed by the early study. Then, the processes and detailed contents in which an information system is developed in order to operate and improve the performance management scheme. The specific contents provided by the study include the system development environments and methods, system architecture, and application structure. Finally, this study summarizes the major results of the study and suggests future research directions.
Journal of Korean Society of Industrial and Systems Engineering
/
v.35
no.1
/
pp.93-100
/
2012
The purpose of this study is to present the green management requisites effect on corporate performance. Corporate performance consists of customer and green performance, work satisfaction and financial performance. In order to carry out this research we obtained 175 survey sheets, inspect the twelve assumptions focused on reliability, appropriateness of the model. Validation results of hypothesis are summarized as follows. First, the green management components : system, resource/energy affect significantly to the customer and green performance. Second, the green management components : system, resource/energy influence significantly to work satisfaction. Finally, the strategy has on effect to the financial performance. This paper shows that the green management requisites have an effect on the corporate performance directly and significantly.
Supply chain performance management is the essential part of various business activities in supply chain management area, and integrating it with general business management improves the supply chain performance. Although supply chain performance management is important and expected of market growth, there are few researches on this area and lack of practical applications. To resolve these problems, this paper presents a new performance management methodology for a supply chain integrating SCOR (Supply Chain Operational Reference) model and Balanced Scorecard (BSC). And we develop a framework of the Supply Chain Performance Management System (SCPMS) based on this methodology, and implement a prototype system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.