• Title/Summary/Keyword: Performance evaluation Model

Search Result 3,602, Processing Time 0.033 seconds

A Study on the Evaluation Model of Government-funded Research Institutes Using AHP (AHP를 이용한 정부출연연구소 평가 모형 연구)

  • Son, Eun Il;Baek, Chang Hwa
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.4
    • /
    • pp.665-677
    • /
    • 2022
  • Purpose: The purpose of this study is to analyze the current status and investigate relevant indicators so that R&D performance evaluation suitable for government-funded research institutes can proceed. A suitable performance evaluation model was presented based on the surveyed indicators. Based on the presented performance evaluation model, the importance was analyzed to calculate the weight for each indicator of the performance evaluation model. Methods: The method applied in this study presented a performance evaluation model based on the organizational performance evaluation cases of advanced overseas countries. By using the AHP(Analytic Hierarchy Process) technique, the weight of each indicator of the performance evaluation model was studied. Results: As a result of examining the indicators necessary for the evaluation model, focusing on overseas cases, 13 evaluation items were derived. A weight was calculated for the importance of the study results. And the scientific/technical research results showed the highest excellence. Conclusion: Key indicators of performance evaluation suitable for government-funded research institutes were derived and presented through detailed modeling in three stages. A realistic model that can objectively evaluate the performance of government-funded research institutes was proposed using the AHP technique.

Development of Performance Evaluation Model for Optimal Soil Remediation Technology Selection (토양오염 최적정화기술 선정을 위한 성능평가모델 개발)

  • Kim, Sang-Tae;Koh, Woo-Chan;Lee, Seung-Woo;Kim, Heung-Rae
    • Journal of Soil and Groundwater Environment
    • /
    • v.20 no.7
    • /
    • pp.13-22
    • /
    • 2015
  • In this study, we have developed the performance evaluation model for the optimal soil remediation technology selection. Performance evaluation model is composed in the evaluation of two steps. In the first stage, the candidate technologies are derived according to the conditions of drilling, type and concentration of pollutants, and the saturated/unsaturated of target site. In the second stage, each individual candidate technology is evaluated by performance evaluation model. The performance evaluation model has 5 groups of evaluation items and 12 evaluation items which have their own evaluation index and their own weights through the AHP approach surveying 40 experts. From the case study of actual design cases, the applicability of the performance evaluation model was confirmed.

A Study on the Development and Application of Performance Evaluation Model for Defense Standard Improvement Projects (국방규격 개선사업의 성과평가모형 개발 및 적용방안 연구)

  • Lee, Min Cheol;Kim, Young Hyun;Ahn, Young Jun;Kim, Jun Su
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.185-202
    • /
    • 2023
  • Purpose: The purpose of this study is to identify key performance evaluation items and factors that are effective and practical for project management of defense standard standard improvement projects, and to develop a quantitative performance evaluation model. Methods: For the development of a performance evaluation model for defense standard improvement projects, we analyzed past major project performance and derived evaluation items and factors. To increase the objectivity and efficiency of project evaluation, we developed an evaluation index that enables relative evaluation of evaluation targets, and calculated the main importance of evaluation items using the Analytic Hierarchy Process (AHP) method based on the main opinions of expert groups. Results: The study resulted in the identification of main performance items for defense standard improvement projects, which were classified into defense standard conformity review performance and defense standard improvement performance items. We also simplified the evaluation model by integrating various evaluation items into similar evaluation factors. Additionally, we developed a quantitative evaluation index that enables relative evaluation of the targets and verified the objectivity and validity of the suggested performance evaluation model by reevaluating it using performance data from past commissioned professional institutions Conclusion: Developing a quantitative evaluation model for defense standard improvement projects is expected to provide a means of measuring the effectiveness of the project, and to be used as a tool to determine the appropriateness and effectiveness of medium and long-term project plans.

A Simulation Model Construction for Performance Evaluation of Public Innovation Project

  • Koh, Chan
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.87-109
    • /
    • 2006
  • The purpose of this paper is to examine the present performance evaluation methods and to make Monte Carlo Simulation Model for the IT-based Government innovation project. It is suggested the proper ways in applying of Monte Carlo Simulation Model by integration of present evaluation methods. It develops the theoretical framework for this paper, examining the existing literature on proposing an approach to the key concepts of the economic impact analysis methods. It examines the actual conditions of performance evaluation focusing on the It-based Government Innovation project. It considers how the simulation model is applied to the performance management in the public innovation project focusing on the framework, process and procedure of performance management.

  • PDF

A Study on the Information Technology Performance Evaluation Model (정보기술 성과 평가 모델에 관한 연구)

  • Choi, Gyun-Hyun;Nam, Ji-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.3
    • /
    • pp.121-132
    • /
    • 2005
  • Nowadays, Information Technology(IT) has become one of the most critical managerial decision areas, because its role in the business practice tends to be more important and hence the amount of the investment in growing. Since there is no dominant and promising measure to evaluate the IT performance, the managements have difficulties on the decision process for IT investment. In this paper, we propose an IT performance evaluation model. The proposed model starts with finding the business performance evaluation areas and the corresponding KPIs, and then concentrates on the IT performance evaluation areas corresponding to the business performance evaluation areas. To extract the specific and reliable KPIs for the IT performance measure, we map the business performance evaluation areas into the corresponding IT performance evaluation areas and then combine and adjust these KPIs with the KPIs obtained from the experiential field interview. Finally, We present the complete model which has 11 business performance indices and 48 IT performance indices are completed.

Theoretical Model of Performance Evaluation for Informatization Programs: Focusing on the Public Sector (정보화지원사업의 성과평가를 위한 이론적 모형: 공공부문을 중심으로)

  • Kim, Sang-Hoon;Choi, Jeom-Ki
    • Journal of Information Technology Services
    • /
    • v.6 no.1
    • /
    • pp.101-126
    • /
    • 2007
  • This study aims to construct the integrative performance evaluation model of informatization programs. In order to achieve the purpose of research, first of all, the three major theoretical paradigms (technical/functional, economic/financial, and interpretive/alternative paradigms) are comparatively analyzed concerning their philosophical and methodological perspectives. Also, a number of important studies and research model in the area of IS (Information Systems) evaluation are critically reviewed. And then actual problems and limitations on the process of implementing IS performance evaluation are sought through investigating domestic and foreign practices. Based upon theoretical and practical review of informatization evaluation and logical reasoning, the components of ideal performance evaluation scheme for informatization program are derived, and the integrative performance evaluation model which can comprehensively represent the relationship among the components is conceptually proposed. For researchers, this study provides the theoretical basis for reasonably deriving the performance variables of informatization programs and empirically validating the performance of managing informatization programs. And in real world, the results of this study are very likely to contribute to presenting the practical guideline for desirably implementing performance evaluation of informatization programs.

A Study on Establishing Finance Performance Evaluation Model in Each Clinical Department - Factors Influencing Operating Profit of Hospitals - (진료과별 재무성과 측정모형 구축 연구 -병원의 의료이익에 영향을 미치는 요소를 중심으로 -)

  • Lee, Youn-Tae;Ryu, Kie-Hyun
    • Korea Journal of Hospital Management
    • /
    • v.4 no.2
    • /
    • pp.162-191
    • /
    • 1999
  • This study was conducted to establish finance performance evaluation model for physicians in each clinical department, by using factors which determines financial outcome(performance) in each clinical department The ultimate aim of study is to develop effective performance-based pay system for physicians. The system, by motivating physicians, should increase their productivity. To do so, it is critical to establish finance performance evaluation model to achieve final goal of this study. 232 private hospitals were chosen from 693 hospitals which were subject to hospital survey by the Korea Institute of Health Services Management and their revenue and expense-related data during 1997 were collected. By adopting multiple regression method, the study shows that the evaluation model for each clinical department was statistically significant. The study suggest the effective performance-based pay system based on financial performance of each clinical department. The pay system includes the level of compensation, the way of how to allocate profits to each department, and criteria whether the compensation should provide or not. In conclusion, the study has following implications. First, the study suggest finance performance evaluation model for each clinical department Second, the study suggest guidelines and plans to establish qualitative measure of financial performance in each clinical department. Third, the study suggest that adopting performance-based pay for physicians could be impetus to achieve organizational goal by motivating them with fair compensation.

  • PDF

Using Support Vector Machine Method to Improve Company Performance Management

  • Yuanhao LI;Xin LI;Han XIA
    • Asian Journal of Business Environment
    • /
    • v.13 no.4
    • /
    • pp.1-6
    • /
    • 2023
  • Purpose: To explore the application prospect of support vector machine (SVM) in supply chain management and its practical application in supply chain performance evaluation practice. Research design, data and methodology: This paper establishes the performance evaluation index system of supply chain management according to the balanced scorecard (BSC) theory, and establishes the SVM model of supply chain management performance evaluation based on the SVM principle. Results: The performance evaluation results of the supply chain of an electric power equipment Co., Ltd. in Harbin established by using the model are consistent with the actual situation, which indicates the nature and accuracy of the possible reflection of the established supply chain performance evaluation model. Conclusions: The results show that SVM model can be used to evaluate enterprise supply chain management performance indicators, and can improve enterprise supply chain management performance, thus demonstrating the effectiveness of the model.

The Performance Evaluation on Service Organization using the Priority-Constrained DEA Model (우선순위제약 DEA모델을 이용한 서비스조직의 성과평가)

  • Seo, Sang-Beom;Park, Myung-Sub
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.93-107
    • /
    • 2006
  • This paper attempts to improve the typical DEA model that is often used as a performance evaluation method for service firms. The after-sales service system in a Korean electronic company is chosen as a sample case. The performance evaluation method currently practiced in the firm was reviewed and some critical issues of the current method were discussed. DEA model would be considered a solution for solving those Issues. However, typical DEA models has various drawbacks in determining the weights over evaluation criteria. Proposed is the priority-constrained DEA model that accommodates the strategic Importance of each evaluation criterion. The results of the proposed model are compared with those of typical DEA models. It is shown that the priority-constrained DEA model is superior to the others in terms of evaluation quality.

Performance Evaluation Model for Public-Private Partnership Projects - with Reference to BTO (Build-Transfer-Operate) Road Projects - (민간투자사업 성과평가 모델 개발 및 적용 - 도로 부문 사업을 중심으로 -)

  • Park, Hyeon;Park, Inseok;Lee, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.83-95
    • /
    • 2018
  • The aim of this paper is to develop a performance evaluation model for PPP (Public-Private Partnership) projects that appropriately reflects the important traits that are unique to PPP projects. To this end, 1) it defines a set of distinct perspectives involved in the PPP projects and their associated success factors that might differ amongst the perspectives; 2) it identifies the key performance indicators and suggests the performance evaluation criteria for each indicator; and 3) it builds a performance evaluation model by matching the success factors from each perspective with performance measure criteria as well as applies the model to the two selected BTO road projects in Korea. The process of model construction and its application confirms significant differences between the main stakeholder perspectives typically involved in PPP projects, which highlights the need for an evaluation model tailored for PPP projects by taking into account the distinct perspectives. The results from the PPP evaluation model developed in the study is compared against the results from the existing ex-post evaluation model for construction projects in general. The former shows a closer match with the results from the user satisfaction survey conducted. This new evaluation framework and the performance indicators entailed in it permits a balanced evaluation of PPP projects as it takes into account different perspectives involved in PPP projects as well as an understanding of the factors affecting the success of PPP projects. While the construction of the model is based on transport projects, it is applicable to different types of PPP projects through variation with the weight allocation amongst different success factors and/or additions or other adjustments to the performance evaluation criteria as required.