• 제목/요약/키워드: Performance Test Equipment

검색결과 998건 처리시간 0.027초

Design and Fabrication of Test Equipment for mass production of Automatic Test Equipment(ATE)

  • Kim, Dong-Il;Choi, Kyung-Jin
    • 한국컴퓨터정보학회논문지
    • /
    • 제22권8호
    • /
    • pp.1-7
    • /
    • 2017
  • In this paper, we proposed the test equipment that can perform separate performance tests to mass-produce the Automatic Test Equipment. Until now, the performance test of the ATE has been performed after it has been assembled perfectly. It is possible to perform the performance test only when the external device manufacturing and setting of measurement resources and the internal wiring work have been completed. So we have been studying test equipment that separately tested the switching devices that played a key role in the performance of the ATE. To build the test equipment, we reviewed the circuit card assemblies that make up the switching devices. We designed a test equipment that satisfies the performance test and apply the completed test equipment to the actual production process to analyze whether it was effective in improving the time and workability of the performance test. The test equipment has the advantage that it can be used universally in the mass production process of ATE with the same type of switching device.

전기철도 차량용 견인전동기 시험설비 (Test equipment of traction motor for electric train)

  • 장동욱;박현준;한문섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 B
    • /
    • pp.1103-1104
    • /
    • 2006
  • This paper is described about the test equipment of fraction motor for electric train. This test equipment was able to perform the performance test of traction motor which was operated in Korea. We explain performance and function of test equipment. In order to check the performance of test equipment, we conducted the performance test with 200 kW and 1100 kW traction motor.

  • PDF

레이다처리장치 시험장비의 데이터 처리방안 (Data Processing Method of Radar Processor Unit Test Equipment)

  • 이민철;김용민
    • 한국군사과학기술학회지
    • /
    • 제21권6호
    • /
    • pp.767-775
    • /
    • 2018
  • To develop and check a Radar Processor Unit, checking the function and performance of the requirement is very important factor in developing Radar. General methods for verifying the Radar is simulation test, environment linkage test and field operation test, firstly, in case of requirement analysis phase, verify Radar algorithm and design by using mathematical method based simulation test method, and secondly, in case of unit test and integrated test phase, Test Equipment is set to simulate radar environment in the lab to verify radar function and performance. Lastly, field operation test phase is carried out to confirm the function and performance after it is mounted on the actual equipment. To successfully develop Radar Processor Unit, using the method of field operation test method after sufficient test cases are tested in radar environmental interlocking method in order to save cost and testing period and because of this reason, development of the Radar Processor Unit Test Equipment is becoming very important factor. In this paper, we introduce the concept of test equipment development and important factors in test equipment, which are target simulation, data processing and device interlocking.

유압 디바이스 성능 검사 장비 자동화 공정 개발 (Development of Hydraulic Device Performance Test Equipment Automation Process)

  • 김홍록;정원지;설상석;박상혁;이경태
    • 한국기계가공학회지
    • /
    • 제19권10호
    • /
    • pp.74-80
    • /
    • 2020
  • Crawler-type hydraulic devices facilitate forward and backward driving of construction equipment by converting power into mechanical energy. The existing hydraulic device performance test process is time- and labor-intensive. This study aims to improve efficiency and productivity by automating the hydraulic device production performance test processes, which have been separately conducted so far. We also used SolidWorksⓇ, a 3D modeling program, and ANSYSⓇ, a structural analysis tool, for structural analysis and to verify the suitability of fixing pins required for connecting a hydraulic device to performance test equipment. Our results that employing an automated hydraulic device performance test process improves efficiency.

Seismic behavior of simplified electrical cabinet model considering cast-in-place anchor in uncracked and cracked concretes

  • Bub-Gyu Jeon;Sung-Wan Kim;Sung-Jin Chang;Dong-Uk Park;Hong-Pyo Lee
    • Nuclear Engineering and Technology
    • /
    • 제55권11호
    • /
    • pp.4252-4265
    • /
    • 2023
  • In the case of nuclear power plants near end of their design life, a reassessment of the performance of safetyrelated equipment may be necessary to determine whether to shut down or extend the operation of the power plant. Therefore, it is necessary to evaluate the level of performance decline due to degradation. Electrical cabinets, including MCC and switchgear, are representative safety-related equipment. Several studies have assessed the degradation and seismic performance of nuclear power plant equipment. Most of those researches are limited to individual components due to the size of safety-related equipment and test equipment. However, only a few studies assessed the degradation performance of electrical cabinets. The equipment of various nuclear power plants is anchored to concrete foundations, and crack in concrete foundations is one of the most representative of degradation that could be visually confirmed. However, it is difficult to find a study for analysis through testing the effect of cracks in concrete foundations on the response of electrical cabinet internal equipment fixed by anchors. In this study, using a simple cabinet model considering cast-in-place anchor in uncracked and cracked concretes, a tri-axial shaking table tests were performed and the seismic behavior were observed.

Equipment Fan Filter Unit (EFFU)의 Particle 제거 성능평가 방법 (Test Method for Particle Removal Characteristic of Equipment Fan Filter Unit (EFFU))

  • 이양우;안강호
    • 반도체디스플레이기술학회지
    • /
    • 제11권2호
    • /
    • pp.59-62
    • /
    • 2012
  • This test method covers a procedure for measuring particle removal characteristic of equipment fan filter unit(EFFU) installed inside of semiconductor process equipments, FPD manufacturing equipments and so on. Since EFFU is a combination of air filter and the assembly of fan, motor and frame, the integrity of these parts is very important for the performance of EFFU. So a conventional particle removal test method for air filters is not suitable for EFFU particle removal performance. This test method defines an evaluation method for EFFU which is installed inside an enclosed space to remove particles that are generated inside process equipment. The particle removal performance of EFFUs is usually depending on the performance of filter media and air flow rate. To understand a performance of an EFFU, the filter media characteristic, air flow rate and the integrity of EFFU parts should be considered simultaneously. This test method is intended to demonstrate the system performance of an EFFU and successfully evaluated EFFU performance characteristics.

비행 데이터 계측장비를 위한 점검 시스템 성능 개선 (Improved Performance of the Test System for Flight Data Instrumentation Equipment)

  • 김상범;이순영;남영호
    • 스마트미디어저널
    • /
    • 제10권3호
    • /
    • pp.54-59
    • /
    • 2021
  • 항공기 개발과정 중 비행 계측장비를 통하여 획득된 비행 데이터는 항공기 개발 및 성능 개선에 중요한 역할을 한다. 따라서 비행 계측장비의 신뢰성 확보가 요구됨에 따라 비행 계측장비의 건전성을 점검하기 위한 점검 시스템이 매우 중요하다. 본 논문에서는 비행 데이터 계측장비의 기존 점검 시스템을 분석하여 점검 시스템의 하드웨어 및 소프트웨어 측면의 개선점을 제시한다. 이를 바탕으로 성능이 개선된 점검 시스템을 설계 및 구현하고, 시험 결과를 제시한다. 성능이 개선된 점검 시스템은 기존 점검 시스템보다 비용 절감과 유연한 적용, 그리고 유지보수성이 향상되었다. 따라서 계측장비의 건전성을 확보할 수 있어 비행 데이터의 신뢰성 향상을 기대할 수 있다.

30kW급 ESS용 이동형 성능평가 시험장치의 구현 및 특성분석 (Characteristic Analysis and Implementation of 30kW Portable Test Equipment for Performance Evaluation in Energy Storage System)

  • 박재범;김미성;노대석
    • 전기학회논문지
    • /
    • 제67권6호
    • /
    • pp.715-723
    • /
    • 2018
  • The energy storage system consists of batteries, power conditioning system and energy management system. If ESS is installed and operated in the field, SAT(Site Acceptance Test) of ESS is being essentially required for the safety and performance of ESS. Furthermore, in order to more accurately and reliably validate the performance of the ESS in advanced countries, it has been required to perform not only performance testing by H/W equipments but also performance verification by S/W tool. Therefore, this paper proposes the modeling of portable test equipment in order to evaluate the performance and reliability of ESS by using the PSCAD/EMTDC S/W. And also, the prototype of 30[kW] scaled portable test equipments is implemented based on the S/W modeling. From the results of various simulations and testings such as power quality, LVRT and anti-islanding tests, it is confirmed that 30[kW] scaled portable test equipment is useful for SAT of ESS, because the simulation results of PSCAD/EMTDC are identical to them of 30[kW] test equipment at the same test conditions.

The Performance Analysis to Identify the Reuse and Assembly Impact of Temporary Equipment

  • Bae, Sung-Jae;Park, Jun-Beom;Kim, Jung-Yeol;Kim, Young-Suk;Kim, Jun-Sang;Jo, Jae-Hun
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1252-1252
    • /
    • 2022
  • Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.

  • PDF

조명기기의 임펄스내전압 성능의 분석 (Analysis of Impulse Withstand Voltage Performance of Lighting Equipment)

  • 이복희;방평호
    • 조명전기설비학회논문지
    • /
    • 제28권3호
    • /
    • pp.91-96
    • /
    • 2014
  • Modern electronic circuits are becoming more vulnerable to damage by surges, and it is required to improve the impulse withstand voltage performance of electrical and electronic equipment. This paper presents the impulse withstand voltage performance of lighting equipment connected to power lines, and the impulse withstand voltage tests for fluorescent lamp, LED lamp and halogen lamp were carried out according to the reference standards under normal service conditions. To conduct performance tests against lightning surge, a combination wave ($1.2/50{\mu}s$ voltage - $8/20{\mu}s$ current) was employed. The test surge was applied between lines or between line and ground of the specimen to be measured. The test surge was applied synchronized at the peak value of the positive and negative AC voltage waves. As a consequence, some specimens satisfied the impulse withstand voltage test criteria, but lighting equipment such as 36W fluorescent lamps, 5W and 5.5W LED lamps and 50W halogen lamp were damaged at the test voltage levels between power lines. It is needed to improve the qualities of lighting equipment to satisfy EMC immunity requirements of equipment for general lighting purposes.