• Title/Summary/Keyword: Performance Predictor

Search Result 439, Processing Time 0.028 seconds

Hybrid Value Predictor in Wide-Issue Superscalar Processor (슈퍼스칼라 프로세서에서 명령 윈도우 크기에 따른 혼합형 값 예측기)

  • Jeon, Byoung-Chan;Choi, Gyoo-Seok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.9 no.2
    • /
    • pp.97-103
    • /
    • 2009
  • In this paper, the performance of a hybrid value predictor according to the instruction fetch rate on window size superscalar processors is evaluated. In general, the data dependency relations of instructions are increased with the number of the fetched instructions. Therefore, it is expected that the performance of a value predictor will be higher when the instruction fetch rate is increased. The performance is studied for the machine with collapsing buffer and he one with trace cache as an instruction fetch mechanism. As a result of experiment, it is showed that the performance effect of a value predictor is higher as the instruction fetch rate of instruction window size, IPC, predict rate on apply with non-tc and tc is increased.

  • PDF

Smith-Predictor Controller Design Using New Reduction Model (새로운 축소 모델을 이용한 Smith-Predictor 제어기 설계)

  • Choi Jeoung-Nae;Cho Joon-Ho;Hwang Hyung-Soo
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.52 no.1
    • /
    • pp.9-15
    • /
    • 2003
  • To improve the performance of PID controller of high order systems by model reduction, we proposed two model reduction methods. One, Original model with two point $({\angle}G(jw)=\;-{\pi}/2,\;-{\pi})$ in Nyquist curve used gradient base method and genetic algorithm. The other, Original model without two point$({\angle}G(jw)=\;-{\pi}/2,\;-{\pi})$in Nyquist curve used to add very small dead time. This method has annexed very small dead time on the base model for reduction, and we remove it after getting the reduced model, and , we improved Smith-predictor for a dead-time compensator using genetic algorithms. This method considered four points$({\angle}G(jw)=0,\;-\pi/2,\;-\pi,\;-3\pi/2)$ in the Nyquist curve to reduce steady state error between original and reduced model. It is shown that the proposed methods have more performance than the conventional method.

Design of a Hybrid Data Value Predictor with Dynamic Classification Capability in Superscalar Processors (슈퍼스칼라 프로세서에서 동적 분류 능력을 갖는 혼합형 데이타 값 예측기의 설계)

  • Park, Hee-Ryong;Lee, Sang-Jeong
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.27 no.8
    • /
    • pp.741-751
    • /
    • 2000
  • To achieve high performance by exploiting instruction level parallelism aggressively in superscalar processors, it is necessary to overcome the limitation imposed by control dependences and data dependences which prevent instructions from executing parallel. Value prediction is a technique that breaks data dependences by predicting the outcome of an instruction and executes speculatively its data dependent instruction based on the predicted outcome. In this paper, a hybrid value prediction scheme with dynamic classification mechanism is proposed. We design a hybrid predictor by combining the last predictor, a stride predictor and a two-level predictor. The choice of a predictor for each instruction is determined by a dynamic classification mechanism. This makes each predictor utilized more efficiently than the hybrid predictor without dynamic classification mechanism. To show performance improvements of our scheme, we simulate the SPECint95 benchmark set by using execution-driven simulator. The results show that our scheme effect reduce of 45% hardware cost and 16% prediction accuracy improvements comparing with the conventional hybrid prediction scheme and two-level value prediction scheme.

  • PDF

The Performance evaluation of Data Value Predictor in ILP Processor (ILP 프로세서에서 데이터 값 예측기의 성능 평가)

  • 박희룡;전병찬;이상정
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.21-23
    • /
    • 1998
  • 본 논문에서 ILP (Instruction Level Parallelism)의 성능향상을 위하여 데이터 값들을 미리 예측하여 병렬로 이슈(issue)하고 수행하는 기존의 데이터 값 예측기(data value predictor)를 비교 분석하여 각 예측기의 예측율을 측정하고, 2-단계 데이터 값 예측기(Two-Level Data Value Predictor)와 혼합형 데이터 값 예측기(Hydrid Data Value Predictor)에서 발생되는 aiasing 을 측정하기 위해 수정된 데이터 값 예측기를 사용하여 측정한 결과 aliasing은 50% 감소하였지만 예측율에는 영향을 미치지 못함과 데이터 값 예측기의 예측율을 측정한 결과 혼합형 데이터 값 예측기의 예측율이 2-단계 데이터 값 예측기와 스트라이드 데이터 값 예측기(Stride Data Value Predictor)에서 평균 5.7%, 최근 값 예측기(Last Data Value Predictor)보다는 평균 38%의 예측 정확도가 높음을 입증하였다.

  • PDF

Optimal design of PID controllers including Smith predictor structure by the model identification (모델 동정에 의한 Smith predictor 구조를 갖는 최적의 PID 제어기 설계)

  • Cho, Joon-Ho;Hwang, Hyung-Soo
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.44 no.1
    • /
    • pp.25-32
    • /
    • 2007
  • In this paper, a new method for first order plus dead time(FOPDT) model identification is proposed, which can identity multiple points on a process step response in terms of classification of time response. The process input and output to the test are decomposed into the transient part and the steady-state part. The steady-state part express one FOPDT model and the transient part express variously FOPDT model using least square estimation method. The optimum parameter tuning algorithm for PID controller of the Smith Predictor is proposed through ITAE as performance index. The Simulation results show the validity and improvement of performance for various processes.

A study on motion prediction and subband coding of moving pictuers using GRNN (GRNN을 이용한 동영상 움직임 예측 및 대역분할 부호화에 관한 연구)

  • Han, Young-Oh
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.5 no.3
    • /
    • pp.256-261
    • /
    • 2010
  • In this paper, a new nonlinear predictor using general regression neural network(GRNN) is proposed for the subband coding of moving pictures. The performance of a proposed nonlinear predictor is compared with BMA(Block Match Algorithm), the most conventional motion estimation technique. As a result, the nonlinear predictor using GRNN can predict well more 2-3dB than BMA. Specially, because of having a clustering process and smoothing noise signals, this predictor well preserves edges in frames after predicting the subband signal. This result is important with respect of human visual system and is excellent performance for the subband coding of moving pictures.

A Branch Predictor with New Recovery Mechanism in ILP Processors for Agriculture Information Technology (농업정보기술을 위한 ILP 프로세서에서 새로운 복구 메커니즘 적용 분기예측기)

  • Ko, Kwang Hyun;Cho, Young Il
    • Agribusiness and Information Management
    • /
    • v.1 no.2
    • /
    • pp.43-60
    • /
    • 2009
  • To improve the performance of wide-issue superscalar processors, it is essential to increase the width of instruction fetch and the issue rate. Removal of control hazard has been put forward as a significant new source of instruction-level parallelism for superscalar processors and the conditional branch prediction is an important technique for improving processor performance. Branch mispredictions, however, waste a large number of cycles, inhibit out-of-order execution, and waste electric power on mis-speculated instructions. Hence, the branch predictor with higher accuracy is necessary for good processor performance. In global-history-based predictors like gshare and GAg, many mispredictions come from commit update of the branch history. Some works on this subject have discussed the need for speculative update of the history and recovery mechanisms for branch mispredictions. In this paper, we present a new mechanism for recovering the branch history after a misprediction. The proposed mechanism adds an age_counter to the original predictor and doubles the size of the branch history register. The age_counter counts the number of outstanding branches and uses it to recover the branch history register. Simulation results on the SimpleScalar 3.0/PISA tool set and the SPECINT95 benchmarks show that gshare and GAg with the proposed recovery mechanism improved the average prediction accuracy by 2.14% and 9.21%, respectively and the average IPC by 8.75% and 18.08%, respectively over the original predictor.

  • PDF

Analysis on the parameters of the controllers for time-delay systems (시간 지연이 존재하는 시스템에 대한 제어기의 매개변수에 관한 해석)

  • 박영일;이석원;정영창
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.65-68
    • /
    • 1997
  • 溜is paper is concerned with the controllers for time-delay systems which has an integrator. It is known that high performance can be obtained for the systems response and load disturbance rejection by adjusting the only three parameters of the modified Smith predictor. In the case of the time-delay systems with repeated poles, good performance cannot be obtained with the modified Smith predictor. But superior performance can be obtained through the intentional delay parameters mismatch. The calculating method for the approximation delay parameter values is proposed. Simulation results show the improved response characteristics with the proposed delay parameter values.

  • PDF

An Improved Load Operand Referencing Scheme Using A Hybrid Predictor (혼합 예측기를 사용하는 효율적인 적재 명령어의 오퍼랜드 참조 기법)

  • Choe, Seung-Gyo;Jo, Gyeong-San
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.7
    • /
    • pp.2196-2203
    • /
    • 2000
  • As processor's operational frequency increases and processors execute multiple instructions per cycle, the processor performance becomes more dependent on the load operand referencing latency and the data dependency. To reduce the operand fetch latency and to increase ILP by breaking the data dependency, we propose a value-address hybrid predictor using a reasonable size prediction buffer and analyse the performance improvement by the proposed predictor. Through the extensive simulation of 5 benchmark programs, the proposed hybrid prediction scheme accurately predicts 62.72% of all loads which are 12.64% higher than the value prediction scheme and show its cost-effectiveness compared to the address predition scheme. In addition, we analyse the performance improvement achieved by the stride management and the history of previous predictions.

  • PDF

Design of the Controllers for the Improved Response of Time Delay Systems (시간지연 시스템의 응답특성 개선을 위한 제어기 설계)

  • Lee, Suk-Won;Yang, Seung-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.7
    • /
    • pp.15-19
    • /
    • 2005
  • The practical control problems for the lime-delay system is considered. The delay-free characteristics of the Smith Predictor is available only when both the process and it's model are exactly matched. So it does not used widely in practical industrial processes. In this paper, using the 2nd-order plus dead time model in place of the plant model of the Smith Predictor, the proposed controller shows the improved performance in case of the very long time delay. And the range of integral constant of the PI controller is also proposed.