• 제목/요약/키워드: Percentage of arcing

검색결과 6건 처리시간 0.015초

팬터그래프와 전차선간 최소 이선아크 지속시간에 따른 이선율 변화량 분석 (Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc)

  • 박영;이기원;권삼영;박철민;김재광;최원석
    • 전기학회논문지
    • /
    • 제63권6호
    • /
    • pp.855-859
    • /
    • 2014
  • Quality criteria for interaction between a pantograph and overhead contact wire is a most important requirement to assess of the performance for the current collection system. Interaction performance between pantograph and catenary system is subject to approval by the infrastructure manager when a new design and contraction of overhead contact line and pantograph are installed. Among the various performance, percentage of arcing at maximum line speed is a simple test method compared with contact force of pantograph due to direct sensing of pantagraph, calibrations, installations of train, and etc. On the other hand, percentage of arcing is need to reliable arcing detector and general requirements with accordance with EN 50317. In this paper, percentage of arcing are investigated on the function of duration of arc and proposed which is satiable of percentage of arcing. As a results, we proposed which duration of arcs are unsuitable from infrastructures point of view as performance testing for quality of current collection.

전기철도 집전장치의 아크량에 따른 비디오 이미지 분석 (Video Image Analysis in Accordance with Power Density of Arcing for Current Collection System in Electric Railway)

  • 박영;이기원;박철민;김재광;전아람;권삼영;조용현
    • 전기학회논문지
    • /
    • 제62권9호
    • /
    • pp.1343-1347
    • /
    • 2013
  • This paper presents an analysis methods for current collection quality in catenary system by means of video image based monitoring system. Arcing is the sparking at the interface point between pantograph and contact wire when the electric trains have traction current values at speed. Percentage of arcing at maximum line speed is measurable parameters for compliance with the requirements on dynamic behaviour of the interface between pantograph and contact wire in accordance with requirement of IEC and EN standards. The arc detector and video is installed on a train aim at the trailing contact strip according to the travel direction. The arc detector presented and measured verity of value such as the duration and power density of each arc and the video image is measured a image when the arc is occurred in pantograph. In this paper we analysis of video image in accordance with power density of arcing from arc detector and compared with video image and power density of arcing so as to produce quality of arcing from image.

수서고속철도 전차선로의 설치조건의 따른 집전상태 분석 (Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line)

  • 나경민;박영;이기원;조용현;권삼영;박철민
    • 전기학회논문지
    • /
    • 제66권4호
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

250 km/h급 전철설비의 비전기반 검측 기술 구현 (An Implement of Vision based Measurement Technology for Traction Power System up to 250 km/h)

  • 박영식;나경민;박영
    • 전기학회논문지
    • /
    • 제67권7호
    • /
    • pp.976-980
    • /
    • 2018
  • The traction power system is configured to transmit electricity to the vehicles through mechanical contact between the OCL (Overhead Contact Line) and the pantograph. The system measures the current collection performance of the OCL, or the OCL installation condition is examined through maintenance for commercial operation. Maintenance continues to check the conditions through visual inspection by walking and inspection vehicles. The current collection performance is divided into the percentage of arcing(%), the contact force, and the uplift. The percentage of arcing is composed of a vision based system and used to verify the performance of a new OCL. However, it is not always possible to measure the current collection performance during commercial operation, and maintenance based on human resources can not be replaced. This paper presents the minimum performance condition of video devices in the current collection system of commercial vehicles. In addition, a continuous arcing was measured, and current collection performance was examined on the traction power system at the 250 km/h. It was analyzed with a minimum duration of arc of 1 ms. The frame rate is then shown by comparing the number of frames in the image at the time intervals of the number of the arcing. It is expected that the result of this study can be used for examining the minimum performance of video devices depending on their purpose.

전차선의 집전상태 판단 알고리즘 구현 (On the Implementation of an Advanced Judgement Algorithm for Contact Loss of Catenary System)

  • 박영;정호성;윤일권;김원하
    • 전기학회논문지
    • /
    • 제63권6호
    • /
    • pp.850-854
    • /
    • 2014
  • Analyzing dynamic performance between pantograph and contact wire depends on mechanical and electrical conditions such as contact force, currents, aerodynamics of pantograph and tension of overhead contact wire. For the characteristic of dynamic performance between pantograph and overhead contact wire, various evaluation systems are used to measuring of the interaction of the contact line and the pantograph. Among the various methods, the contact force and percentage of arcing are intended to prove the safety and the quality of the current collection system on the train. However, these methods are only capable of measuring on the train which are installed measurement systems. Therefore in this paper, a track-side monitoring system was implemented to measure electrical characteristics from active overhead contact wire systems in order to constantly estimate current collection performance of railway operation. In addition, a method to analyze loss of contact phenomena was proposed. According to simulation results, the proposed system was capable of measuring abnormal electrical behavior of pantograph and contact wires on the track-side. The advantage of the proposed system is possible to detect loss of contact or any other electrical abnormalities of all types of trains within sections from sub to sub without the need to install any on-board equipment on trains.

전차선로 동적특성에 따른 설치상태 분석 (Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System)

  • 박영;이기원
    • 전기학회논문지
    • /
    • 제65권9호
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.