• Title/Summary/Keyword: Peak operation

Search Result 806, Processing Time 0.026 seconds

Locally-Weighted Polynomial Neural Network for Daily Short-Term Peak Load Forecasting

  • Yu, Jungwon;Kim, Sungshin
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.16 no.3
    • /
    • pp.163-172
    • /
    • 2016
  • Electric load forecasting is essential for effective power system planning and operation. Complex and nonlinear relationships exist between the electric loads and their exogenous factors. In addition, time-series load data has non-stationary characteristics, such as trend, seasonality and anomalous day effects, making it difficult to predict the future loads. This paper proposes a locally-weighted polynomial neural network (LWPNN), which is a combination of a polynomial neural network (PNN) and locally-weighted regression (LWR) for daily shortterm peak load forecasting. Model over-fitting problems can be prevented effectively because PNN has an automatic structure identification mechanism for nonlinear system modeling. LWR applied to optimize the regression coefficients of LWPNN only uses the locally-weighted learning data points located in the neighborhood of the current query point instead of using all data points. LWPNN is very effective and suitable for predicting an electric load series with nonlinear and non-stationary characteristics. To confirm the effectiveness, the proposed LWPNN, standard PNN, support vector regression and artificial neural network are applied to a real world daily peak load dataset in Korea. The proposed LWPNN shows significantly good prediction accuracy compared to the other methods.

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • v.5
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF

DWT-Based Parameter and Iteration Algorithm for Preventing Arc False Detection in PV DC Arc Fault Detector (태양광 직렬 아크 검출기의 오검출 방지를 위한 DWT 기반 파라미터 및 반복 알고리즘)

  • Ahn, Jae-Beom;Lee, Jin-Han;Lee, Jin;Ryoo, Hong-Je
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.27 no.2
    • /
    • pp.100-105
    • /
    • 2022
  • This paper applies the arc detection algorithm to prevent the false detection in photo voltaic series arc detection circuit, which is required not only to detect the series arc quickly, but also not falsely detect the arc for the non-arc noise. For this purpose, this study proposes a rapid and preventive false detection method of single peak noise and short noise signals. First, to prevent false detection by single peak noise, Discrete wavelet transform (DWT)-based characteristic parameters are applied to determine the shape and the amplitude of the noise. In addition, arc fault detection within a few milliseconds is performed with the DWT iterative algorithm to quickly prevent false detection for short noise signals, considering the continuity of serial arc noise. Thus, the method operates not only to detect series arc, but also to avoid false arc detection for peak and short noises. The proposed algorithm is applied to real-time serial arc detection circuit based on the TMS320F28335 DSP. The serial arc detection and peak noise filtering performances are verified in the built simulated arc test facility. Furthermore, the filtering performance of short noise generated through DC switch operation is confirmed.

A Study on the DR program operation method based on the pattern analysis (사용량 패턴분석을 통한 패턴분석 DR 프로그램 운영방안에 대한 연구)

  • Kang, Jung-Chul;Lee, Hyun-Woo
    • Journal of the Korean Data and Information Science Society
    • /
    • v.20 no.2
    • /
    • pp.283-292
    • /
    • 2009
  • Recently the stable electric power supply is threaten by the rapid development of all the industries consuming a lot of electric power, thus KEPCO is trying to establish the countermeasures to cope with this circumstance of uprising power consumption by running the efficient and flexible 12-month s price policy for the base price and raisin the electric power price remarkably in peak power consumption period to suppress the maximal power demand of consumers. To resolve these problems, this study propose the method calculating hourly CBL based on the hourly amount at non-event using the pattern of the amount of power consumption and propose the operation method of DR Program.

  • PDF

Development of Measurement System of Cutter Conditions for Combine Diagnosis (I) - Analysis of Vibration and Load Signals - (콤바인 예취부 고장진단을 위한 예취 칼날부의 진단 시스템 개발(I) - 진동 및 부하 신호 분석 -)

  • Choi, Chang-Hyun;Kim, Yong-Joo;Kim, Jong-Hyuck;Mun, Joung-Hwan
    • Journal of Biosystems Engineering
    • /
    • v.32 no.3
    • /
    • pp.190-196
    • /
    • 2007
  • The purpose of this study is to develop a measurement system of cutter conditions for combine header diagnosis during rice harvesting. A load cell was installed at the locker-arm to measure load fluctuation and an acceleration senor was used to monitor vibration signal of cutter bar. The data were collected from a paddy field during harvesting. The tests were conducted with a normal cutter, a loosened cutter, a broken cutter, and a worn-out connecter pin at the field. The vibration signals converted by FFT (Fast Fourier Transformation), filtered, and normalized. The load data and peak values of vibration signals in four different frequency ranges were used to determine the cutting operation and the cutter conditions of combine. The multiple comparison tests showed that the load data and peak values of vibration signals were important to monitor the cutting operation and cutter conditions of combine header.

A Study on ESS Optimal Operation Strategy Using Two Stage Hybrid Optimization (Two Stage Hybrid Optimization을 사용한 ESS 최적 운전 전략에 대한 연구)

  • Gong, Eun-Kyoung;Sohn, Jin-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.7
    • /
    • pp.833-839
    • /
    • 2018
  • This paper presents an analysis and the methodology of optimal operation strategy of the ESS(Energy Storage System) for reduce electricity charges. Electricity charges consist of a basic charge based on the contract capacity and energy charge according to the power usage. In order to use electrical energy at minimal charge, these two factors are required to be reduced at the same time. QP(Quadratic Programming) is appropriate for minimization of the basic charge and LP(Linear Programmin) is adequate to minimize the energy charge. However, the integer variable have to be introduced for modelling of different charge and discharge efficiency of ESS PCS(Power Conversion System), where MILP(Mixed Integer Linear Programming) can be used. In this case, the extent to which the peak load savings is accomplished should be assumed before the energy charge is minimized. So, to minimize the electricity charge exactly, optimization is sequentially performed in this paper, so-called the Two Stage Hybird optimization, where the extent to which the peak load savings is firstly accomplished through optimization of basic charge and then the optimization of energy charge is performed with different charge and discharge efficiency of ESS PCS. Finally, the proposed method is analyzed quantitatively with other optimization methods.

Decision of Backwashing frequency and method on the GAC adsorber (입상활성탄 흡착지 운영에서 역세척 주기와 팽창률의 영향 평가)

  • Chae, Seon-Ha;Cho, Chang-Hyun;Lee, Hee-Dae;Wang, Chang-Keun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.753-762
    • /
    • 2010
  • The objective of this study was to evaluate the backwashing frequency and method on the Granular Activated Carbon (GAC) in G WTP. A backwashing period was determined as 50 days and 60 days, respectively. Prior to Backwashing by head loss build, biomass concentration in effluent as constant and DO concentration was maintained more than 11.5 mg/L in GAC bed. Peak turbidity of backwashing water was 73.6~303 NTU. Mean turbidity of backwashing water at initial 9 minute of backwash operation was 50.7~82.8 NTU. After 30 minute backwashing operation, final turbidity reaches approximately 10 NTU. The frequency of backwashing and turbidity of backwashing water overtime were evaluated. At 20days of backwashing frequency, the peak turbidity was 73 NTU and 42 NTU respectively when 10% and 25% of expansion of GAC were applied. At 14 minute of backwashing time, it was observed that turbidity of 10% expansion of GAC was higher than that of 20% expansion.

A Study on the Rise for Rate of Operation in Utility Interactive Photovoltaic System (계통연계형 PV시스템의 가동률 향상에 관한 연구)

  • Han Seok-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2004.07a
    • /
    • pp.97-100
    • /
    • 2004
  • Our country has depended on fossil fuel very much according to the Increasing of the demand of the electric power. For instance, if the reduction and freezing caused by the warm gas in earth by the regulation of international environment happen in Korea it will bring about the result of weakness in industrial activity. As a result, it will cause many problems to compete an advanced country which wants to connect environment with the activity of industrial product in their country. The photovoltaic system outputs have peak about a half past 13 o'clock(before and after) mainly in a good weather. The output decreases rapidly from a half past 17 o'clock and PV output doesn't work at six o'clock before the sun rises. The outputs of PV system stops at that time. The frequent degree of harmonics in dwelling house which lots of people live has peak from 19 o'clock to 22 o'clock Harmonics mainly happens at least at night. In recent, many researches about power quality has been studying very hard in order to solve the question, the voltage fluctuating and harmonics as one compensator. In this paper, I suggest the algorithm which can increase the power quality as a rate of operation of this system. This algorithm proves to have effectiveness through computer simulation.

  • PDF

Diode and MOSFET Properties of Trench-Gate-Type Super-Barrier Rectifier with P-Body Implantation Condition for Power System Application

  • Won, Jong Il;Park, Kun Sik;Cho, Doo Hyung;Koo, Jin Gun;Kim, Sang Gi;Lee, Jin Ho
    • ETRI Journal
    • /
    • v.38 no.2
    • /
    • pp.244-251
    • /
    • 2016
  • In this paper, we investigate the electrical characteristics of two trench-gate-type super-barrier rectifiers (TSBRs) under different p-body implantation conditions (low and high). Also, design considerations for the TSBRs are discussed in this paper. The TSBRs' electrical properties depend strongly on their respective p-body implantation conditions. In the case of the TSBR with a low p-body implantation condition, it exhibits MOSFET-like properties, such as a low forward voltage ($V_F$) drop, high reverse leakage current, and a low peak reverse recovery current owing to a majority carrier operation. However, in the case of the TSBR with a high p-body implantation condition, it exhibits pn junction diode.like properties, such as a high $V_F$, low reverse leakage current, and high peak reverse recovery current owing to a minority carrier operation. As a result, the TSBR with a low p-body implantation condition is capable of operating as a MOSFET, and the TSBR with a high p-body implantation condition is capable of operating as either a pn junction diode or a MOSFET, but not both at the same time.

A study on the Effective Operation of Pump Stations (빗물펌프장 운영합리화 방안 연구)

  • 한국원자력연구소
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.2
    • /
    • pp.133-144
    • /
    • 1998
  • Recent development booms in urban watersheds have increased impermeable areas and brought about an increase of peak flood. Eventually, some people living in the lower area of an urban watershed, very often and seriously, have suffered form inundation. In this study, for minimization of inundation in urban watersheds, the operational criteria for pump stations are suggested. At first, ILLUDAS has been selected as a runoff model which can explain the past precipitations. Secondly the operational criteria for pump stations could be suggested by working out an operational criteria for pump stations could be suggested by working out an operation program from the relationship between pumping capacity and accumulative hydrographs, and from the Intensity-Duration-Frequency relationship.

  • PDF