The paper presents experimental results of Partial Discharge(PD) in Gas Insulated Switchgear(GIS), obtained using a computer-aided PD measurement system. Different discharge sources are simulated and identified. These included internal, interface, surface and protrusion. For internal discharge, it showed symmetrical discharge type between positive and negative cycle. Interface discharge showed smaller number and higher peak than internal discharge but symmetrical discharge as well. For surface discharge, it showed small number and high peak in positive half cycle but large number and low peak in negative half cycle. For protrusion discharge, small number and high peak of discharge were shown only in negative half cycle.
In this study is analysis which dams breach shapes are effect on peak discharge of dam-failure. The dam breach shapes and failure time are important peak discharge when dam failure. When dam failure times are 1hr, 2hr and 3hr condition for the ECRD and 0.1hr and 0.2hr for the CG and CFRD that breach shapes changed base length $B_b=1Hd,\;B_b=2Hd\;and\;B_b=3Hd$. As the results from DAMBRK(Dam Break model) peak discharge are increase base widths lengthen. As failure time is longer then peak discharge is decrease. So peak discharge is increase more short of dam failure time. Also peak discharge is increase become larger dam breach shapes.
This study is runoff analysis of the recently urbanized San Bon basin. The relationships between peak discharge and total discharge were examined by applying the ILLUDAS runoff analysis model to the measured data. In urbanized streams, it is found that channel adjustment had the most significant effect on the increase of peak discharge. Significant increases in the peak discharge occurred as rainfall duration or return period increases 10% and 7~16% increases in peak discharge were observed when the roughness coefficient were 0.04 and 0.015, respectively. When the natural river channel with n=0.04 was converted into a sewerage system of n=0.015 the peak discharge was greatly increased by 51~158%, Generally, flood peak discharge was increased during heavy rain, but in the case of urbanized basin, river stage was reduced owing to an increase of flow velocity by the adjustment of drainage system.
The change in discharge current of a glow discharge has been shown the potential sensitive detector for gas chromatography. To investigate the effect of carrier gas on the electrical characteristics of the discharge and the peak response, the discharge pressure, gas flow rate, and discharge gap have been studied. The discharge gas included the Ar, He, and N$_{2}$. The gas flow rate has been found one of the important parameters to affect both the electrical characteristics and the peak response.
The objective of this study was to determine the best representative synthetic unit hydrograph that is applicable to ungaged small watershed. A typical unit hydrograph was established with the actual data from a small watershed. Four currently well-known methods for analyzing ungaged small watershed, including Snyder's, Clark's S.C.S. and Nash methods, were evaluated with the data from the same small watershed. The following observations were noted from the analysis of four methods. The Snyder's method yielded the similar peak discharge value as the typical unit hydrograph. With co-ordinates of three discharge values, i.e. 25%, 50% and 75% of peak discharge, were not adequate for deriving a typical unit hydrograph in ungaged small watershed. With Clark's method there shall be some way of obtaining the exact base length of time area diagram and isochrone of each reach of the stream. With Nash method peak discharge and base flow time are affected by the storage constant and gamma function argument; therefore, for deriving a more reliable and workable unit hydrograph one needs to select for the better estimation of storage constant and gamma function argument. In S.C.S. method peak discharge is directly related to the watershed area and inversely related to the time of peak diacharge. Therefore area with faster peak discharge yielded the higer peak discharge value. Although the peak discharge value obtained frome the S.C.S. method higher than the value obtained from the unit hydrograph developed from the actual data, this method contains a number of advantageous factors. The peak discharge value and the time of peak discharge can be claculated easity from the morphological characteristics of the watershed, and in S.C.S method co-ordinates of the unit hydrograph can be calculated easily from that of the dimensionless unit hydrograph. When the four currently used methods were evaluated with a typical unit hydrograph obtained from the actual data, the S.C.S method was show to be the best method in deriving a synthetic unit hydrograph for ungaged small watershed.
In this study, the urban runoff models, ILLUDAS model and SWMM, are analyzed the probable peak discharge and discharge using rainfall distribution by Huff's method at Bum-uh chun area in Taegu city. The probability rainfall and intensity is analyzed by Pearson-III type. The rainfall duration, 90 minutes, is determined by the critical duration computed the maximun peak discharge for some rainfall durations. The peak discharge according to Huff's rainfall distribution types compute in order of type 3, type 4, type2, and type 1, so Huff's 3 type is selected as an adequate rainfall distribution in Bum-uh chun basin. ILLUDAS model and SWMM are shown as good models in Bum-uh chun, but SWMM is computed higher peak discharge than ILLUDAS model, so SWMM is shown as the adequate urban runoff model for the design of interior drainage in urban basin.
A representative unit hydrograph responding to a small basin is used to calculate the flood discharge in the basin. The peak discharge and the time to peak of the unit hydrograph are dealt with its characteristic values. In this study it is shown and analyzed the fluctuations at peak discharges and times to peak of unit hydrographs by rainfall storms in a small national basin $8.5\;km^2$ wide are no small. And on assumption that a major factor in the fluctuations of the unit hydrographs in a small basin be rainfall intensity of a rainstorm, both relations of peak discharge and time to peak with rainfall intensity are suggested as exponential functions respectively. In this result although it is a limit of the study in which its result is accompanied with not small dispersion in the peak values of unit hydrograph due to a defect in used data it is sure an averaging regression relation between peak discharge and time to peak with rainfall intensity as identified in this study has hydrological worth from the complementary viewpoint of the theory of unit hydrograph.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
1999.11a
/
pp.136-140
/
1999
Measurements of AE signals caused by partial discharges were performed by using an ultrasonic measurement technique to diagonise the electrical treeing deterioration in XLPE cable. We also examined the partial discharge magnitude and AE signals(peak-to-peak) with the increase of the deterioration time. From these results, it was found that AE signal due to partial discharge can be greatly detected at the peak value of positive polarities prior to the breakdown voltages, and the magnitude of AE signals was closely related to the current pulses by the increase of deterioration, and it appeared that AE signals(peak-to-peak) was proportional to partial discharge magnitude. Attenuation and time-delaying characteristics of ultrasonic signals propagated in various polymers sample by using ultrasonic oscillation and receiving systems are also reported as a basic data of ultrasonic measurements in XLPE cable.
Transactions of the Korean Society of Automotive Engineers
/
v.4
no.1
/
pp.123-133
/
1996
From the experimental study of wire-cut Electric Discharge Machining of alloyed tool steel and tungsten carbide, the characteristics such as cutting speed, surface roughness has been observed and evaluated for various conditions. Cutting speed is improved as peak discharge current and wire tension become increased, and gap voltage and spark cycle decreased. Surface roughness can be better when peak discharge current and gap voltage become smaller, or spark cycle and wire tension become larger. Secondary cut is recommended to obtain high precision and good quality.
Proceedings of the Korea Water Resources Association Conference
/
2010.05a
/
pp.346-349
/
2010
In this study several unit hydrographs by rainfall storms are derived and moving averaged unit hydrograph is extracted from them based on the rainfall-runoff data in a small basin 8.5 $km^2$ wide. And peak discharges and peak times of the unit hydrographs are investigated and reviewed. And then a representative unit hydrograph of the moving averaged one is applied to the linear convolution integration for obtaining the flood discharge hydrograph and peak discharge and time of its result are researched and inspected. Variance in application of the representative unit hydrograph in a basin on assumption of linearity is appeared and this is given as a counterevidence about that the runoff response from rainfall on a basin has nonlinear characteristics. And As a result of application of derived representative unit hydrograph the errors in peak discharge and time are investigated.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.