• 제목/요약/키워드: Payback Period

검색결과 135건 처리시간 0.029초

Environmental awareness and economical profits of replacing gas turbines in gas compressor stations: A case study of Polkalleh station in Iran

  • Sadrnejad, Amin;Noorollahi, Younes;Sadrnejad, Tohid
    • Environmental Engineering Research
    • /
    • 제21권2호
    • /
    • pp.132-139
    • /
    • 2016
  • In early 90s the worldwide awareness about the energy crisis and global warming had been increased and emission reduction (by improving energy efficiency), as well as increasing the capacity of clean and renewable energies, showed themselves as the most important steps towards the sustainable development approach. However, investigations on Iran's environmental situation show huge decline in recent decades and apparently there is no sense of urgency about these issues through the vision of Iranian politicians. In this article the idea of replacing the old gas turbines of Polkalleh natural gas compressor station - as one of the main compressor stations of Iran - with newer and more efficient gas turbines is evaluated, emphatically for reducing greenhouse gases emissions and their environmental costs and decreasing natural gas consumption as well. Clearly such idea is costly, but analyzing its economic impacts, huge declines in annual costs and greenhouse gases emissions can be seen as well. So an investment about $95 million can decrease 40% of Polkalleh compressor station annual costs, 25% of natural consumption and 30% of $CO_2$ and $NO_x$ emissions. Besides the simple payback period of this investment is about 2.5 years from the cut-expenses of annual costs.

모니터링 기반 건물 에너지 커미셔닝 기술 (Monitoring-Based Building Energy Commissioning Technology)

  • 이상학
    • 한국통신학회논문지
    • /
    • 제41권7호
    • /
    • pp.765-767
    • /
    • 2016
  • 건물 에너지 커미셔닝은 건축물의 계획, 설계, 시공, 시공 후 설비의 시운전 및 유지 관리를 포함한 전 공정을 효율적으로 검증하고 문서화하여 에너지의 낭비 및 운영상의 문제점을 최소화하는 공정 기술이다. 일반적인 커미셔닝은 설계 기준에 적합한 성능을 발휘할 수 있도록 설비의 교체를 추진한다. 이는 비용이 많이 들며 투자비 회수기간이 오래 걸리는 단점을 지니고 있다. 본 논문에서는 ICT(Information Communication Technology)를 기반으로 에너지 사용 데이터 분석을 통해 설비 교체를 최소화하며 최적 운용을 통해 에너지 효율을 높이는 모니터링 기반 커미셔닝에 대해 연구하였다. 건물 에너지 사용에 대한 모델링을 수행하고 이를 기반으로 에너지 사용 데이터와 비교, 효율 저하 감지 기술을 활용하여 운용 최적화를 통한 에너지 사용 절감을 이룬다.

해면 중간육성 생산방식의 경제성 분석 - 갯벌 참굴 산업을 중심으로 - (Economic Valuation for Nursery-Phase Production - Focusing on the tidal flat Oyster -)

  • 최종두
    • 수산경영론집
    • /
    • 제43권3호
    • /
    • pp.31-41
    • /
    • 2012
  • This paper was conducted to study the economic valuation for Nursery-Phase production of the tidal flat oyster in Korea. Benefit-cost(B/C) model used to indicate the effects of economic valuation. Using discounting rates(i.e., 4.5%, 6.5% and 8.5%), the model compared revenues and costs that occur at different times from 2012 to 2018. This study also estimated various submodels, which are Benefit Cost Ratio(B/C ratio), Net Present Value(NPV), Internal Ration of Return(IRR), to compare profit of Nursery-Phase production styles and analyzed returns to evaluate the scenarios. Sensitivity analysis were conducted for various scenarios. The results suggest as follows. First, the oyster spat to the shell height of 3~5cm was more profit than the shell height of 1~3cm. Second, all of sensitivity analysis with submodels were economic valuation such that B/C ratio > 1, NPV > 0 and IRR > discounting rate. Third, the payback period was about 3years after installed Nursery-Phase production system.

The Analysis of Life Cycle Cost and Cooling Water Circulating Pump Energy Saving According to Variable Speed Pressure Differential Setpoint Control Strategy

  • Kim, Seo-Hoon;Kim, Jong-Hun;Jang, Cheol-Yong;Song, Kyoo-dong
    • KIEAE Journal
    • /
    • 제15권4호
    • /
    • pp.37-43
    • /
    • 2015
  • Purpose : The study applied control strategy to reduce through optimal control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. The study has the purpose to review validity of control on variable speed as ESMs(Energy Saving Measures) and establish the control technology on variable speed pump. The study performed reduction analysis of building energy and economic evaluation of pump through energy effectiveness control strategy of HVAC system. Method: The study sought possible reduction through energy control strategy which can provide proper flow fitting to building load by applying control on variable speed pump. The study applied control strategy to reduce through pressure differential set-point control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. Result : The results showed that about 16-35% of pump energy could be saved by using these optimal control strategies. In the result of analysis on 10 years life cycle cost of analysis on payback period of initial investment pump, variable speed pump control showed 5.1 years.

수용가용 전자전력저장시스템의 경제성 분석 (Economic Assessment of Customer Owned Battery Energy Storage System (BESS))

  • 최준호;김재철;홍종석;손학식;임태훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 추계학술대회 논문집 학회본부 A
    • /
    • pp.180-183
    • /
    • 2000
  • The Battery Energy Storage System(BESS) has lots of advantages such as load levelling, quick response emergency power(spinning reserve), frequency and voltage control, improvement of reliability, and deferred generation and transmission construction. The economic feasibility requires justification from the customer side of meter to promoting the dissemination of BESS nationally. In this paper, we proposed the economic assessment model of customer owned Battery Energy Storage System(BESS) which is complemented and improved the existing model. The proposed model is applied to the typical customer type(light-industrial commercial, and residential) which are taken from the statistical analysis on the load profile survey of Korea Electric Power COmpany (KEPCO). The economic assessment performed for each customer type to justifying their economic feasibility of BESS installation from the economic measures such as payback period, overall benefits, ROI, and ROR. The results of this paper are useful to the customer investment decision making and the national energy policy & strategy.

  • PDF

공조시스템용 지열히트펌프의 실증평가에 관한 연구 (In-situ Performance Evaluation of a Ground Source Heat Pump for an Air Conditioning System)

  • 박윤철;박성구
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제32권1호
    • /
    • pp.66-72
    • /
    • 2008
  • In this study, the ground source heat pump was installed at a research center in Jeju Island to verify the performance of the system and to give an information for a economic feasibility. The performance test was conducted until the heat storage tank temperature reached at $5^{\circ}C$ from $50^{\circ}C$ in the cooling operation, and until the storage temperature goes up to $50^{\circ}C$ from $10^{\circ}C$ in the heating mode. As results, the system performance shows that $2.2{\sim}3.5$ for the cooling operation and $2.5{\sim}3.5$ for heating operation. It is found that the underground is good heat source for the heat pump with $3{\sim}10^{\circ}C$ variation range. The ground source heat pump could be connected one of air conditioning system without any problem in system performance. Based on the economic analysis, the initial cost for the ground source heat pump will be compensated after 4 years operation. If the system runs 20 years, approximately 300 million Won will be saved when the air conditioning system adapt the ground source heat pump based on Life Cycle Cost analysis.

LCC 분석을 이용한 중앙공급식 공동주택의 수축열식 지열원 히트펌프시스템의 적용연구 (Application study of heat storage type GSHP system in Apartment building with central cooling and heating facilities using life cycle cost analysis)

  • 이상훈;박종우;조성환
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1497-1502
    • /
    • 2009
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) and central boiler system with individual air conditioning facility which are installed at the same building in the shared an apartment house. Cost items, such as initial construction cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,351,000,000won) is more profitable than central boiler system with individual air conditioning facility by 86.7% initial cost. And SPP appeared 8.0 year overcome the different initial cost by different annual energy cost.

  • PDF

Barrette 파일을 이용한 지열시스템의 채열 성능 예측 및 경제성 분석에 관한 연구 (An Economic Analysis and Performance Prediction for a Ground Heat Pump System with Barrette Pile)

  • 채호병;남유진;박용부
    • 설비공학논문집
    • /
    • 제25권11호
    • /
    • pp.600-605
    • /
    • 2013
  • Ground source heat pump systems (GSHP) can achieve higher performance of the system, by supplying more efficient heat source to the heat pump, than the conventional air-source heat pump system. But building clients and designers have hesitated to use GSHP systems, due to expensive initial cost, and uncertain economic feasibility. In order to reduce the initial cost, many researches have focused on the energy-pile system, using the structure of the building as a heat exchanger. Even though several experimental studies for the energy-pile system have been conducted, there was not enough data of quantitative evaluation with economic analysis and comprehensive analysis for the energy-pile. In this study, a prediction method has been developed for the energy pile system with barrette pile, using the ground heat transfer model and ground heat exchanger model. Moreover, a feasibility study for the energy pile system with barrette pile was conducted, by performance analysis and LCC assessment. As a result, it was found that the heat exchange rate of a barrette pile was 2.55 kW, and the payback period using LCC analysis was 8.8 years.

건물용 열병합발전 시스템의 적정규모 산정을 위한 최적 투자모형 (Optimal Sizing Evaluation Model of Building Cogeneration System)

  • 박종성;원선재;김정훈;박승호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 추계학술대회 논문집 학회본부
    • /
    • pp.117-119
    • /
    • 1995
  • For an effective application of the cogeneration system for commercial and industrial buildings, we need to develop a relevant model to determine the long-term based optimal sizing of the cogeneration system considering electrical and thermal load demands, buy and sell contracts with electric utility and the annual production cost. In assessing the optimal sizing of cogeneration, we have to consider both economic parameters and their capacity expansion for the increased electrical and thermals demand in the future. In this paper, we propose a mathematical model for the optimal sizing of cogeneration systems considering annual production costs and other economic parameter such as, lifetime of the equipment, time value of the capital, etc. In the case study, we thoroughly examine the effects of the economic parameters and determine the optimal size of the sample system. In addition, we calculate the payback period of the cogeneration investment.

  • PDF

신재생에너지원을 고려한 집단에너지 경제성평가 방법론에 관한 연구 (A Study on the Method about the Economic Feasibility Estimation Considering Renewable Energy)

  • 신혜경;최영준;최인선
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 추계학술대회 논문집
    • /
    • pp.372-374
    • /
    • 2008
  • Korea classified into a development country when UNFCCC was concluded in 1995. So Korea doesn't have a GHG reduction duty until 2012. As the UNFCCC is strengthened, recently there is a growing interest in renewable energy and energy usage efficiency improvement for reducing GHG emission. It is associated with CES and renewable energy. CES is a total energy (heat, cooling and power)supplier in aggregated demand zone like a hotel, building, hospital and redevelopment district using CHP and it improves energy usage efficiency. At present, renewable energy is needed for GHG reduction duty but renewable energy doesn't have economic feasibility. So renewable energy is needed various support system to popularize which is a FIT and RPS. Especially RPS is carrying out instead of FIT in many advanced country and it will be inroduced in Korea. RPS is a duty which electricity service provider must guarantee renewable energy as much as specific ratio of total capacity. Therefore this study conducts an economic feasibility estimation of CES considering renewable energy when RPS will introduced in the future.

  • PDF