Dowel bars in the jointed concrete pavement are used to both provide load transfer across pavements joints and prevent the joint faulting leading to longer service life. On the contrary, the misplacement of dowel bar can provide negative results including the joint freezing(locking) that may cause the joint spatting and unexpected mid-slab cracking. The dowel bar can be placed using the assembly or dowel bar inserter (DBI) during the concrete pavement construction. In the domestic practice of the concrete pavement construction, the dowel bar is placed using the assembly method. This study primarily focuses on the comparison of these two dowel placement methods using the field data from the KHC test road in which both dowel placement methods have been applied to a certain length of the concrete pavement. The field data regarding the alignment of the dowel bars placed by both methods was collected using MIT-SCAN2, a nondestructive measuring equipment, and processed to compute Joint Score and Running Ave. Joint Score which are used as indicators of the dowel bar performance. The comparison of the methods for the dowel bar placement using these indicators shows that the DBI method provided much better alignment of the dowel bars reducing the risk of joint freezing than the assembly method. In order to improve the quality of the dowel bar placement using the assembly method, the current weak points of the assembly method including the fabrication, storage, and installation of dowel bar assembly were investigated and the solution was suggested. The improved dowel bar sets based on the suggested solution have been applied to an actual practice of the concrete pavement construction. The field data shows that the improved assembly method suggested in this study can highly reduce the risk of joint freezing.
Park, Hee-Mun;Choi, Ji-Young;Lee, Hyun-Jong;Hwang, Eui-Yoon
International Journal of Highway Engineering
/
v.9
no.2
s.32
/
pp.51-62
/
2007
Recently, the pavement distresses in the bridge deck have seriously affected the durability of bridge deck and driver's safety. The existing asphalt materials have the limitations in reducing the pavement distresses of brides deck. To protect the bridge deck and withstand the high deflection, it is necessary to develop the asphalt materials with good fatigue resistance for bridge deck pavement. The asphalt binder combined with SBS and two other admixtures has been developed for improving the resistance to fatigue cracking, productivity, and workability for bridge deck pavement. Based on the various binder test results, the developed binder is found to be PG 70-34 indicating very higher resistance against fatigue cracking. Fatigue testing, wheel tracking testing, and moisture susceptibility testing have been conducted to evaluate the performance of asphalt mixtures developed in this study. Laboratory test results show that the developed asphalt material has three times higher fatigue lives than the typical modified asphalt mixture. Full scale accelerated testing was also performed on the typical asphalt mixture and newly developed asphalt mixture to evaluate the full scale performance of asphalt mixtures. Test results indicate that the length of cracking on the new materials is only 38% of the typical material at the 250,000 load repetitions.
The transformed field domain analysis method was developed in this study to investigate the aspects of the stress distribution in overlaid concrete pavement systems under multi-axle vehicle loads. The overlay was assumed to be perfectly bonded or perfectly unbonded to the existing concrete pavement. The loads considered included the dual tired single-axle, tandem-axle, and tridem-axle loads, and the effects of the overlay's thickness, elastic modulus, and Poisson's ratio on the stress distribution were investigated. Details of the analysis method in the transformed field domain to analyze the overlaid pavement was described in this paper and the analysis results were verified by comparing with those obtained using the finite element method. From the analysis, it was found that the maximum tensile stress in the existing slab decreased as the overlay's thickness, elastic modulus, and Poisson's ratio increased, and the bonded overlay showed more significant effects than the unbonded one. The overlay's Poisson's ratio did not much affect the stresses, and the features of the maximum stress reduction in the existing slab due to the increase of the thickness, elastic modulus, and Poisson's ratio of the overlay were investigated. The effects of the number of axles on the stress distribution and the maximum stress were also investigated.
Journal of the Korean Association of Geographic Information Studies
/
v.10
no.1
/
pp.35-46
/
2007
In the study digital imagery was used to examine asphalt concrete pavements. With digitally mastered-image information that was filmed with a video camera fixed on a car travelling on road at a consistent speed, a road surface management system that can gain road surface information (Crack, Rutting, IRI) was developed using an object-oriented language "Delphi". This system was designed to improve visualized effects by animations and graphs. After analyzing the accuracy of 3-D coordinates of road surfaces that were decided using multiple image orientation and bundle adjustment method, the average of standard errors turned out to be 0.0427m in the X direction, 0.0527m in the Y direction and 0.1539m in the Z direction. As a result, it was found to be good enough to be put to practical use for maps drawn on scales below 1/1000, which are currently producted and used in our country, and GIS data. According to the analysis of the accuracy in crack width on 12 spots using a digital video camera, the standard error was found to be ${\pm}0.256mm$, which is considered as high precision. In order to get information on rutting, the physically measured cross sections of 4 spots were compared with cross sections generated from digital images. Even though a maximum error turned out to be 10.88mm, its practicality is found in work efficiency.
Park, Kyung-Il;Lee, Hyun-Jong;Lee, Kwang-Ho;Rhee, Suk-Keun
International Journal of Highway Engineering
/
v.3
no.3
s.9
/
pp.119-133
/
2001
The stiffness of chemcrete modified asphalt mixtures increase rapidly with time in the presence f oxygen and high temperature, Sometimes the asphalt pavements that have chemcrete modified asphalt mixture applied on the surface none show premature cracking because of the excessive increase in the stiffness f the asphalt mixtures. To mitigate this premature cracking, the chemcrete modified mixtures have been used as a base course material. In this study, the performance of the chemcrete modified asphalt binder and mixtures are investigated through a course of various laboratory tests including dynamic shear rheometer and bending beam rheometer tests for binders and uniaxial tensile fatigue, wheel tracking, and moisture damage tests for the mixtures. And also the resilient modulus of the conventional and chemcrete modified mixtures are compared based on the test results conducted on the specimens obtained from various in-situ test sections. It can be concluded from the tests results that the chemcrete modified mixtures show better rutting resistance than conventional mixtures. The chemcrete modified mixtures may have low temperature cracking when it is applied in the cold region. The stiffness of chemcrete modified mixtures is approximately 50 percent higher than that of conventional mixtures more than two years after the chemcrete modified mixture was applied in the base course.
The use of Polymer Concrete (PC) is growing very rapidly in many structural and construction applications such as box culverts, hazardous waste containers, trench lines, floor drains and the repair and overlay of damaged cement concrete surfaces in pavements, bridges, etc. However, PC has a defect economically because resin which be used for binder is expensive. Therefore the latest research is being progressed to replace existing resin with new resin which can reduce the high cost. Here, Polymer concrete using the recycled PET(polyethylene terephthalate) has some merits such as decrease of environmental destruction, decrease of environmental pollution and development of new construction materials. The variables of this study are amount of resin, curing condition and maximum size of coarse aggregate to find out mechanic properties of this. Stress-strain curve was obtained using MTS equipment by strain control. The results indicated that modulus of elasticity was increased gradually in an ascending branch of curve, as an increase of resin content. Compressive strength was the highest for resin content of $13\%$. And Compressive strength was increased as maximum size of coarse aggregate increases. The strain at maximum stress increases with an increase of resin content and size of coarse aggregate. For the descending branch of stress-strain curve the brittle fracture was decreased when it was cured at the room temperature compared to high temperature.
The Alkali-Silica Reaction(ASR) may cause a serious failure in the concrete pavements and structures. Several researches in some nations have conducted the continuous studies to prevent failure of the concrete structures by the ASR distress as well as the studies to manifest the mechanism. The researches on the ASR have not been performed affluently in Korea because the distress due to ASR has seldom been reported literarily. In this study, we tried to set up the systematic scheme practically for verifying the cause of distress due to ASR by using the visual inspections in field, the chemical method, petrographic analysis, and Electron Dispersive X-ray Spectrometer(EDX) method of Scanning Electron Microscopy(SEM) in laboratory. The chemical method, petrographic method using SEM, and X-ray method were used to verify the cause of pattern crack on the surface and internal crack in the plain concrete pavement. It can be concluded that the distress of a specific site in plain concrete pavement was mainly due to ASR. The chemical method, the petrographic method and EDX method using SEM may be the effective tools for verifying the cause of AAR distresses.
This research was conducted to analyze the features of the critical tensile stresses at the top and bottom of the concrete slab in the jointed concrete pavement (JCP) when subjected to both the environmental and vehicle loads. First, the stress distribution in JCP was analyzed when the system was subjected to only the environmental loads or the vehicle loads by using the finite element model of JCP. Then, the stresses were analyzed when the system was subjected to the environmental and vehicle loads at the same time. From this study, it was found that the critical tensile stresses at the slab bottom under the vehicle loads were almost constant regardless of the loading positions once the loads were applied at the positions having some distance from the transverse joint. The critical tensile stresses at the slab bottom could be obtained using the model consisting of normal springs for underlying layers by adding the critical stresses due to the environmental loads and the vehicle loads for the curled-down slab, and by subtracting the critical stress due to the environmental loads from that due to the vehicle loads for the curled-up slab. The critical tensile stresses at the top of the slab could be obtained using the model consisting of tensionless springs for underlying layers by adding the critical stress due to the environmental loads and the stress at the middle of the slab under the vehicle loads applied at the joint for the curled-up slab. An alternative to obtain the critical stresses at the top of the slab for the curled-up slab was to use the critical stresses under only the environmental loads obtained from the model having normal springs for underlying layers.
An, Ji-Hwan;Yang, Sung-Lin;Park, Hee-Mun;Kwon, Su-Ahn
International Journal of Highway Engineering
/
v.6
no.3
s.21
/
pp.17-26
/
2004
The in-situ California Bearing Ratio (CBR) test has been widely used for evaluating the subgrade condition in asphalt concrete pavements. However, because the in-situ CBR test is expensive and takes plenty of time for operation, it is very difficult to figure out the in-situ characteristics of subgrade strength in detail. For faster and economical operation, the Dynamic Cone Penetrometer (DCP) has been often utilized for estimating the subgrade strength in the field. The relationship between the CBR value and DCP index obtained from the DCP testing has been studied using the laboratory and in-situ testing by other foreign researchers. The objective of this study is to determine the relationship between in-situ CBR value and DCP index of the subgrade materials used in Korea. The DCP index for evaluating the strength of subgrade materials produced in Korea is presented in this paper. Research results propose the regression equation to explain the relationship between the CBR and DCP tests. The in-situ CBR values of subgrade materials range from 20 to 45% indicating the good and sound subgrade condition.
Kim, Seung-Won;Jang, Young-Jae;Park, Young-Hwan;Park, Cheol-Woo
Journal of the Korea Concrete Institute
/
v.24
no.5
/
pp.543-551
/
2012
Road pavements in Korea generally show shorter service life than the predicted one. There are many reasons for this phenomenon including increased traffic load and other attacks from exposure conditions. In order to extend a service life and upgrade the pavement, a new multi-functional composite pavement system is being developed in Korea. This study is to investigate the performances of fiber-reinforced lean concrete for pavement base. This study considered mineral admixtures of fly ash and reject ash. The reject ash is defined as ash that does not meet the specifications for fly ash so that it cannot be used as a supplemental material for cement replacement. Due to the inherent property of lean concrete, compaction during the fabrication of specimens is a key factor. Therefore, this study suggests an appropriate compaction method. From the test results, the compressive strengths of the concrete satisfied the required limit of 5 MPa at 7 days. When a compaction roller was used to mimic actual field conditions, the strength development seemed to be influenced by the compaction energy rather than hydration of cement itself.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.