• 제목/요약/키워드: Pavement Management System

검색결과 137건 처리시간 0.027초

QUALITY ASSURANCE IN ROADWAY PAVEMENT CONSTRUCTION

  • Myung Goo Jeong;Younghan Jung
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.596-601
    • /
    • 2013
  • In the current pavement construction practice, the state agencies traditionally determine the quality of the as-constructed pavement mix based on individual mixture material parameters (e.g., air voids, cement or asphalt content, aggregate gradation, etc.) and consider these parameters as key variables to influence payment schedule to the contractors and the present and future quality of the as-constructed mixture. A set of empirically pre-determined pay adjustment schedule for each parameter that was differently developed and being used by the individual agencies is then applied to a given project, in order to judge whether each parameter conforms to the designated specifications and consequently the contractor may either be rewarded or penalized in accordance with the payment schedule. With an improved quality assurance system, the Performance Related Specification, the individual parameters are not utilized as a direct judgment factor; rather, they become independent variables within a performance prediction function which is directly used to predict the performance. The quantified performance based on the prediction model is then applied to evaluate the pavement quality. This paper presents the brief history of the quality assurance in asphalt pavement construction including the Performance Related Specifications, statistical performance models in terms of fatigue and rutting distresses, as an example of the performance prediction models, and envisions the possibilities as to how this Performance Related Specification could be utilized in other infrastructures construction quality assurance.

  • PDF

국도 아스팔트 콘크리트 포장의 보수공법 결정 기준 연구 (Development of Rehabilitation Criteria of National Highway Pavement)

  • 김다혜;권수안;서영찬;임광수
    • 한국도로학회논문집
    • /
    • 제11권2호
    • /
    • pp.37-44
    • /
    • 2009
  • 현재 국도 PMS(Favement Management System)에서 적용하고 있는 보수공법결정체계는 소성변형과 균열의 기준치값에 대한 설정 근거가 명확하지 않다. 본 연구에서는 일반국도에서 아스팔트 콘크리트 포장의 보수 시 보수공법결정기준에 대한 근거를 제시하기 위한 것이다. 이를 위해 전국 일반국도 아스팔트 포장 구간을 대표할 수 있는 대표 구간을 선정하고, 포장전문가 패널(panel)을 선정하여 선정된 구간을 대상으로 패널이 대표구간을 평가하여 보수공법을 제안하였다. 포장전문가 패널이 대표구간을 평가한 결과를 분석하여 다음과 같이 보수공법 결정 기준의 근거를 마련하였다. 균열의 경우 절삭 덧씌우기를 요구하는 균열율은 35%, 덧씌우기 이상의 기준으로서 균열율 20%를 제안하였다. 소성변형의 경우 절삭 덧씌우기를 필요로 하는 소성변형 값은 13mm, 덧씌우기 이상을 요구하는 소성변형의 기준으로서 10mm를 사용할 것을 제안하였다.

  • PDF

Mean Profile Depth를 이용한 콘크리트 포장의 타이어-노면소음 산정 (Estimation of Tire-Pavement Noise for Concrete Pavement by using Mean Profile Depth)

  • 홍성재;현택집;이승우;김형배;권오선
    • 한국도로학회논문집
    • /
    • 제15권3호
    • /
    • pp.9-16
    • /
    • 2013
  • PURPOSES: There is a need to develop a method to incorporate tire-pavement noise in the pavement management system. Tire-pavement noise highly depends on the characteristics of pavement texture. Therefore, estimation of texture characteristics may give useful information to predict tire-pavement noise. This study aimed to find the relationship between tire-pavement noise and MPD(Mean Profile Depth) for concrete pavement. METHODS: MPD and tire-pavement noise were collected on the number of expressway sections including Central Inland Test Road in Korea. Statistical analysis was performed to find the correlationship between MPD and tire-pavement noise. In addition, multiple regression analysis to find the tire-pavement noise based on MPD and type of concrete pavement texture. RESULTS: Linear relationship between MPD and tire-pavement noise is observed for concrete pavement. Furthermore, a forensic equation to estimate tire-pavement noise based on MPD and texture types of concrete pavement is suggested. CONCLUSIONS: Tire-pavement noise on concrete pavement can be predicted based on the consideration of texture type and MPD estimation.

공공부문 성과관리를 위한 도로포장의 서비스수준과 서비스비용 함수 추정 (Estimation of a Level of Service and Cost of Service Function for Road Pavements for Performance Management in the Public Sector)

  • 한대석;이수형;이상혁;유인균
    • 한국도로학회논문집
    • /
    • 제18권4호
    • /
    • pp.9-18
    • /
    • 2016
  • PURPOSES : This study aimed to evaluate the performance of pavement management works and to develop a function for estimating the level of service (LOS) and cost of service (COS) for the systematic and quantitative management of pavement performance in the public sector. METHODS : The International Roughness Index (IRI) was used as the performance index for pavement management. Long-term pavement performance data for a period of 7 years (2007-2014) collected by the National Highway Pavement Management System and historical maintenance budget data published by the South Korean government were used to develop the LOS-COS function. Based on the function, a model for estimating the appropriate budget as well as the network conditions was suggested. RESULTS : There was high degree of correlation between pavement performance and the investment level (R = - 0.74). The developed LOS-COS function suggested that the unit cost to improve the network IRI to 1 m/km was 32.6 billion KRW. Further, the maintenance costs normalized with respect to the LOS levels were LOS-A = 88.2 billion KRW, LOS-B = 55.6 billion KRW, and LOS-C = 23.0 billion KRW. CONCLUSIONS : This study proposes a simple way of developing a LOS-COS function. It also shows how to develop a network budget demand and condition estimation model using the LOS-COS function. In addition, it is the first attempt to evaluate the road maintenance budget in South Korea. It is expected that these results will help in the negotiations between the road managers and budget makers.

수치사진측량기법을 이용한 도로노면정보 추출 (The Extration of Road-Surface Information using Digital photogrammetry)

  • 이종출;차성렬;김대현;김진수
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2004년도 춘계학술발표회논문집
    • /
    • pp.227-232
    • /
    • 2004
  • In this study, we extracted road surface information which are required highway pavement management system from the obtained digital imagery and these digital image data were analyzed. Thus, this paper says the higyway surface management system and information of surface conditions which are required to management of highway pavement

  • PDF

성능보증제도를 적용한 일반국도 유지보수공사 시범사업 (Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance)

  • 임재규;김용주;김명일;이재준
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.

Fractal evaluation of the level of alligator cracking in pavements

  • Vallejo, Luis E.
    • Geomechanics and Engineering
    • /
    • 제4권3호
    • /
    • pp.219-227
    • /
    • 2012
  • Pavement management systems require systematic monitoring of pavement surfaces to determine preventive and corrective maintenance. The process involves the accumulation of large amounts of visual data, typically obtained from site visitation. The pavement surface condition is then correlated to a pavement distress index that is based on a scoring system previously established by state or federal agencies. The scoring system determines if the pavement section requires maintenance, overlay or reconstruction. One of the surface distresses forming part of the overall pavement distress index is the Alligator Crack Index (AC Index). The AC Index involves the visual evaluation of the crack severity of a section of a pavement as being low, medium, or high. This evaluation is then integrated into a formula in order to obtain the AC Index. In this study a quantification of the visual evaluation of the severity of alligator cracking is carried out using photographs and the fractal dimension concept from fractal theory. Pavements with low levels of cracking were found to have a fractal dimension equal to 1.051. Pavements with moderate levels of cracking had a fractal dimension equal to 1.1754. Pavements with high degrees of cracking had a fractal dimension that varied between 1.5037 (high) and 1.7111 (very high). Pavements with a level of cracking equal to 1.8976 represented pavements that disintegrated and developed potholes. Thus, the visual evaluation of the state of cracking of a pavement (the AC Index) could be enhanced with the use of the fractal dimension concept from fractal theory.

국도 아스팔트포장의 특수포장 적용을 위한 교통량 기준 제안 연구 (A Study on Decision Criteria of traffic volumes for Choosing of Modified Asphalt Pavement in Korea National Highway)

  • 권수안;정경영;서영찬
    • 한국도로학회논문집
    • /
    • 제4권3호
    • /
    • pp.25-33
    • /
    • 2002
  • 국가 기간산업의 중추 역할을 수행하는 일반 국도는 대부분 일반 아스팔트 포장으로 되어 있으며, 최근 들어 고온 및 중차량의 증대로 인해 포장의 수명이 급격히 줄어들고 있는 실정이다. 이런 이유로 많은 경우 신설포장에 대해서는 SMA. 개질아스팔트 등 특수포장이 적용되고 있다. 그러나 어떤 경우에 특수 포장을 채택할 것인가에 대한 적용 기준이 명확히 제시되어 있지 않아 설계 실무자들이 포장형식 선정을 위한 의사 결정에 많은 어려움이 있다. 본 연구에서는 이에 대한 부분적인 해결책으로 과거 10여 년 동안 수행된 국도 포장유지관리시스템의 자료를 이용하여 교통량에 따른 일반 아스팔트포장의 수명을 분석하였다. 분석결과 신설포장은 9.5년, 덧씌우기 포장은 5.6년으로 나타났다. 또한 현재의 포장 수명에 대한 분포 자료를 이용하여 설계 수명인 10년을 공용하기 위한 교통량을 신뢰수준에 따라 제시하였다. 그 결과 90%의 신뢰수준에서는 8.2ton 표준 축하중 2,300 ESAL, 80% 신뢰수준에서는 8.2ton 표준 축하중 1,500 ESAL로 나타났다 즉, 여기서 제시된 교통량보다 많은 구간에 대해서는 특수 포장의 적용을 검토할 것을 제안한다.

  • PDF

시단위 포장도로의 포장평가지수개발 (Development of Pavement Condition Index for the Municipal Pavements)

  • 문형철;서영찬
    • 한국도로학회논문집
    • /
    • 제10권3호
    • /
    • pp.221-230
    • /
    • 2008
  • 우리나라는 1987년 국도 PMS가 도입된 이래 국도 및 고속도로의 경우 그동안 도로포장의 상태를 평가할 수 있는 포장상태 평가기준을 마련하여 이를 바탕으로 유지보수를 시행하고 있다. 반면, 시단위 도로의 경우 비교적 많은 교통량이 통행하며, 가장 많은 연장을 차지하고 있으나 서울시의 경우를 제외하고는 포장상태를 평가할 수 있는 마땅한 시스템이 거의 없는 실정이다. 따라서 본 연구에서는 서울시 사례 및 기타 시단위 도로포장상태 조사자료를 토대로 아스팔트포장의 일반적 평가요소인 균열, 소성변형, 종단평탄성 등 3가지 요소에 대한 포장상태를 분석하였으며, 시단위 도로의 유지관리 의사결정에 필요한 포장평가지수를 개발하였다. 본 연구의 포장평가지수 개발방법은 현장조사와 샘플구간에 대하여 전문가 그룹을 구성하여 설문조사를 실시한 후 통계적 처리를 거쳐 시단위 포장평가지수(MPCI)를 제시하였다. 또한 개별결함 지수에 대한 민감도 분석을 실시하였으며, 평가지수를 실제 현장에 적용하여 타 기관에서 사용중인 포장평가지수와의 비교를 통하여 그 적정성을 검증하였다.

  • PDF

혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구 (Optimal Road Maintenance Section Selection Using Mixed Integer Programming)

  • 조건영;임희종
    • 한국도로학회논문집
    • /
    • 제19권3호
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.