• 제목/요약/키워드: Pavement Construction

검색결과 538건 처리시간 0.028초

Application of Markov Chains and Monte Carlo Simulations for Pavement Construction Engineering

  • Nega, Ainalem;Gedafa, Daba
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1043-1050
    • /
    • 2022
  • Markov chains and Monte Carlo Simulation were applied to account for the probabilistic nature of pavement deterioration over time using data collected in the field. The primary purpose of this study was to evaluate pavement network performance of Western Australia (WA) by applying the existing pavement management tools relevant to WA road construction networks. Two approaches were used to analyze the pavement networks: evaluating current pavement performance data to assess WA State Road networks and predicting the future states using past and current pavement data. The Markov chains process and Monte Carlo Simulation methods were used to predicting future conditions. The results indicated that Markov chains and Monte Carlo Simulation prediction models perform well compared to pavement performance data from the last four decades. The results also revealed the impact of design, traffic demand, and climate and construction standards on urban pavement performance. This study recommends an appropriate and effective pavement engineering management system for proper pavement design and analysis, preliminary planning, future pavement maintenance and rehabilitation, service life, and sustainable pavement construction functionality.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

A Case Study of Asphalt Pavement Construction Quality Assurance Using the Quality Related Specification Software

  • Jeong, M. Myung;Jung, Younghan
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권3호
    • /
    • pp.14-21
    • /
    • 2016
  • One of the major issues in the material-based or acceptance quality characteristics asphalt pavement Quality Assurance (QA) is that the method does not have rationality to link between the individual materials and the projected performance of the pavement. A new asphalt mix QA method has been recently developed under a national research project using the probabilistic Performance Related Specification (PRS). This advanced PRS QA methodology integrates the AASHTOWare Pavement ME Design$^{(R)}$ technology with the simple performance test concept that bridges the material characteristics with the pavement performance. This paper presents a case study of asphalt pavement performance using the developed PRS QA computer program, named Quality Related Specification Software (QRSS), with an actual pavement project, to demonstrate the developed PRS procedure and to assess the robustness of QRSS in terms of the rationality of the distress predictions. The results of this limited case study show that the new PRS QA method reasonably predicts the pavement performance, properly applied the probabilistic methods, and produced rational pay adjustment.

QUALITY ASSURANCE IN ROADWAY PAVEMENT CONSTRUCTION

  • Myung Goo Jeong;Younghan Jung
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.596-601
    • /
    • 2013
  • In the current pavement construction practice, the state agencies traditionally determine the quality of the as-constructed pavement mix based on individual mixture material parameters (e.g., air voids, cement or asphalt content, aggregate gradation, etc.) and consider these parameters as key variables to influence payment schedule to the contractors and the present and future quality of the as-constructed mixture. A set of empirically pre-determined pay adjustment schedule for each parameter that was differently developed and being used by the individual agencies is then applied to a given project, in order to judge whether each parameter conforms to the designated specifications and consequently the contractor may either be rewarded or penalized in accordance with the payment schedule. With an improved quality assurance system, the Performance Related Specification, the individual parameters are not utilized as a direct judgment factor; rather, they become independent variables within a performance prediction function which is directly used to predict the performance. The quantified performance based on the prediction model is then applied to evaluate the pavement quality. This paper presents the brief history of the quality assurance in asphalt pavement construction including the Performance Related Specifications, statistical performance models in terms of fatigue and rutting distresses, as an example of the performance prediction models, and envisions the possibilities as to how this Performance Related Specification could be utilized in other infrastructures construction quality assurance.

  • PDF

성능 기준값 도출을 위한 재래식 도로절단기의 현장 절단성능 분석 (On-Site Cutting Performance Analysis of Conventional Pavement Cutter for Deriving Performance Standard Value)

  • 김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.243-244
    • /
    • 2023
  • Noise, dust, etc. caused by road pavement cutting work, which frequently occurs in new construction or reconstruction of buildings, construction of complexes, etc., are environmental hazards and cause civil complaints. Recently, an eco-friendly pavement cutter is being developed to make the work low in noise and dust, however, the on-site cutting performance of the equipment has not been quantified. In this study, in order to derive a standard value for comparing the cutting performance of the eco-friendly cutter under development, a conventional pavement cutter was applied to four residential sites in Seoul and Gyeonggi-do, and the cutting data was collected. As a result of analyzing the collected data, the conventional pavement cutter showed a cutting performance of 12.3 to 20.2 sec/m, and the average was 27.2 sec/m. In the future, additional cutting experiments with various mixing ratios, materials, and depths are planned to confirm the performance of conventional pavement cutter in more detail.

  • PDF

Introduction of PCC Pavement Sections and Associated Research in KHC Test Road

  • Kim, Ji-Won;Kwon, Soon-Min;Lee, Jae-Hoon;Kim, Do-Wan
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.197-203
    • /
    • 2003
  • Korea Highway Corporation(KHC) began the ambitious KHC Test Road construction project from 1997. It is 7.7km long two-lane highway next to the mainline of Jungbu Inland Expressway. The KHC Test Road construction was completed at the December 2002. It is composed of twenty-five PCC test pavement sections. Section design parameters are (1) concrete slab thickness, (2) base type, (3) base thickness (12, 15, and 18cm), and (4) pavement type. Twenty-five PCC test pavement sections contain 1241 sensors to evaluate the behavior of pavement system under traffic load and environmental change. The behavior of pavement systems will be identified by the observation of sensor measurement and pavement distress survey from test pavement sections. The Test Road research outcome will validate the Korean Pavement Design Guide which is develop by on-going funded research from the Ministry of Construction and Transportation.

  • PDF

도로품질 향상을 위한 야간 도로공사 시간확대의 영향분석 (Effects of Extending Duration of Nighttime Road Construction)

  • 이동민;최준성;박제진;박용진
    • 한국도로학회논문집
    • /
    • 제19권5호
    • /
    • pp.153-162
    • /
    • 2017
  • PURPOSES : This study was conducted to analyze the effects arising from extending the duration of nighttime road construction on improving road quality and durability. METHODS : Most previous studies estimating the social cost of various construction conditions did not consider road pavement cooling time as a factor in improving road pavement quality. This study investigated the feasibility of achieving higher road quality and durability by extending the duration of nighttime road construction time extension. For this investigation, the effects of such an extension on traffic conditions were analyzed based on micro-simulation studies and scenario-based cost-benefit analyses, using factors including traffic volume, delay, construction cost, and road pavement cooling time. RESULTS : The results of the traffic simulation studies and cost-benefit analyses indicate that the current road construction method that emphasizes completing nighttime road construction by 6 a.m. reduces pavement life while causing relatively little traffic delay. If the night construction time is instead extended to 2 p.m., road pavement lifetime is increased, reducing road re-construction cost. These savings are greater than the cost of congestion arising from extending the duration of nighttime construction. CONCLUSIONS : The current nighttime construction durations need to be extended in order to efficiently manage roads and reduce road management costs.

비산먼지 저감을 위한 슬러지 흡입식 도로절단기의 현장 작업 데이터 분석 (Field Working Data Analysis of Sludge Suction Type Pavement cutter to Reduce Scattered Dust)

  • 김균태;전영훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.231-232
    • /
    • 2022
  • Pavement cutting work frequently occurs in new building construction, reconstruction, and complex construction, and this work causes a lot of noise and dust. Eco-friendly pavement cutters are being developed to reduce noise and dust in this work, however the on-site cutting performance of the equipment under development has not been quantified. In this study, the eco-friendly pavement cutter was applied to four residential areas in Seoul and Gyeonggi-do, and its cutting performance was quantified. As a result of the analysis, the eco-friendly pavement cutter showed cutting performance of 20.1~46.9sec/m, and the average was 33.5sec/m. In the future, we plan to conduct additional cutting experiments with various mixing ratios, materials, and depths to confirm the performance of eco-friendly road cutters in more detail.

  • PDF

스톤 블럭을 이용한 보.차도 포장의 적용성 평가 (A Study on Evaluation of Sidewalk / Roadway Pavement Using Stone Block)

  • 윤원섭;김종국;박상준;조철현;채영수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.259-266
    • /
    • 2008
  • Recently, the maintenance period of sidewalk pavement proposed in Ministry of Construction & Transportation to be extended by more than 10 years. Therefore it takes many interests in Durability and the maintenance. Beside sidewalk pavement, block pavement happened problems in parking and road less than 20km/hr about bearing capacity and durability, the maintenance. It interests about importance of environmentally friendly sidewalk pavement. It compared engineering characteristics about strength and durability through general pavement comparison with stone block pavement. It estimate bearing capacity in actual si-tu site and test site. It experimented plate bearing test and field density test. It verified about durability of pavement by construction availability of geosynthetics that is constructed by purpose of filter. Stone block pavement evaluated about application of sidewalk/road pavement on the basis of result.

  • PDF

AR을 이용한 아스팔트 포장 다짐공사 지원 시스템 구축 및 교육과정 제안 (Development of AR System for Asphalt Pavement Compaction Operation and Suggestion for Accompanying Education Program)

  • 김남호;조남준;김노아
    • 실천공학교육논문지
    • /
    • 제11권1호
    • /
    • pp.33-41
    • /
    • 2019
  • 도로포장공사는 시방규정에 맞는 재료를 포설하고 다짐장비를 가동하여 이를 적절한 강도를 가질 수 있도록 다짐하는 공정이 큰 부분을 차지한다. 지난 15년간 유럽 및 미국에서 도로포장공사용 다짐장비 및 시공법의 비약적인 발전이 있었다. GPS 및 각종 센서가 부착된 지능형 다짐 장비가 가동하면서 지반/포장 구조체의 반응 및 다짐장비의 위치 등을 실시간으로 구할 수 있게 되어, 이를 공사품질관리에 이용할 수 있게 된 것이다. 국내에서도 이러한 시공체계를 도입하기 위한 기초연구가 진행되고 있다. 본 연구를 통하여 증강현실기반의아스팔트 포장 다짐공사 지원체계를 제안하고 이를 공사담당자가 적절히 활용할 수 있는 교육과정 및 내용을 제안하였다. 세계적으로 아직 시도된 바 없는 AR환경에서의 IC 다짐장비 시공관리를 통하여 아스팔트 포장 다짐공사의 시공품질을 극대화할 수 있을 것으로 판단된다.