Kim, Kye Kyung;Kang, Sang Seung;Kim, Joong Bae;Lee, Jae Yeon;Do, Hyun Min;Choi, Taeyong;Kyung, Jin Ho
Journal of the Korean Society for Precision Engineering
/
v.30
no.9
/
pp.901-908
/
2013
The introduction of industrial intelligent robot using vision sensor has been interested in automated factory. 2D and 3D vision sensors have used to recognize object and to estimate object pose, which is for packaging parts onto a complete whole. But it is not trivial task due to illumination and various types of objects. Object image has distorted due to illumination that has caused low reliability in recognition. In this paper, recognition method of complex shape object has been proposed. An accurate object region has detected from combined binary image, which has achieved using DoG filter and local adaptive binarization. The object has recognized using neural network, which is trained with sub-divided object class according to object type and rotation angle. Predefined shape model of object and maximal slope have used to estimate the pose of object. The performance has evaluated on ETRI database and recognition rate of 96% has obtained.
The major components of an engine are the cylinder block, cylinder head, crankshaft, connecting rod, and camshaft, which are more popularly known as the 5 C's. Thus, the engine shop usually consists of six sub-lines, including five machining lines and one assembly line. The flow line is the typical concept of the layout when the engineer designs the engine shop. This paper introduces a simulation study regarding the new crankshaft machining line in a Korean automotive factory. The major factors for designing the machining line are considered, and their effects on the system performance are evaluated with a three-dimensional(3D) simulation model that is developed with $QUEST^{(R)}$. The initial layout is analyzed using the simulation model, and we suggest some ideas for improvement.
Lee, Hyun Ku;Hong, Sa Man;Kim, Moo Suk;Hur, Jin Wook;Yoo, Dong Kyu
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.26
no.5
/
pp.559-566
/
2016
This study shows a development procedure and results of noise reduction for a new developed FF 8th speed automatic transmission. Based on planetary gear operating frequency analysis using PTA(planetary transmission analysis) program developed in 2012, It is expected that gear noise of the rear planetary gear set could be recognized easily in the concept design stage. Therefore, pRMC (planetary run many cases) analysis program that is developed in 2012 was applied to minimize the planetary gear noise level and noise distributions versus torque. To minimize noises coming from oil pump and final gears of a new transmission, several changes were applied, such as changing the clearance of double angular ball bearing, the oil pump rotor tooth number from 9 to 11 and the oil pump type from parachoid to megafloid and so on. Besides, stiffness values of the transmission case and the mount bracket were measured and reinforced properly. Finally, The total noise of the new FF 8th speed automatic transmission was developed successfully. Furthermore, E.O.L. testers also have been adapted to control the noise quality of automatic transmission assembly in the manufacturing factory. This paper could provide practical solutions to the automatic transmission NVH problems.
Journal of the Institute of Electronics Engineers of Korea CI
/
v.45
no.6
/
pp.18-26
/
2008
In this paper, dynamic GTS scheduling method based on IEEE 802.15.4 is proposed for wireless control system considering reliability and real-time property. The proposed methods can guarantee a transmission of real-time periodic and sporadic data within the limited time frame in factory environment. The superframe of IEEE 802.15.4 is used for the dynamic transmission method of real-time mixed traffic (periodic data, sporadic data, and non real-time message). By separating CFP and CAP properly, the periodic, sporadic, and non real-time messages are transmitted effectively and guarantee real-time transmission within a deadline. The simulation results show the improvement of real-time performance of periodic and sporadic data at the same time.
Journal of the Korean Society of Manufacturing Process Engineers
/
v.3
no.4
/
pp.73-80
/
2004
A dual purpose robot automation system is developed for both arc welding and spot welding by one robot within a cell. The need for automation of both arc welding and spot welding processes is urgent while the production volume is not so big as to accommodate separate station for the two processes. Also, space is too narrow for separate station to be settled down in the factory. A spot welding robot is chosen and the function for arc welding are implemented in-house at cost of advanced functions. For the spot welding, a single pole type gun is used and the robot has to push down the plate to be welded, which causes the robot positioning error. Therefore, position error compensation algorithm is developed. The basic functions for the arc welding processes are implemented using the digital I/O board of robot controller, PLC, and A/D conversion PCB. The weaving pattern is taught in meticulously by manual teach. A fixture unit is also developed for dual purpose. The main aspects of the system is presented in this paper especially in the design and implementation procedure. The signal diagrams and sequence logic diagrams are also included. The outcome of the dual purpose welding cell is the increased productivity and good production stability which is indispensable for production volume prediction. Also, it leads to reduction of manufacturing lead time.
The ultimate goal of flow control in the semiconductor fabrication process, one of the most equipment-intensive and complex manufacturing process, is to reduce lead time and work in process. In this paper, we propose stand alone layout in the form of job shop using group technology to improve the Productivity and eliminate the inefficiency in FMS (flexible manufacture system). The performance of stand alone layout and in-line layout are analyzed and compared while varying number of device variable chanties. The analysis of in-line layout is obtained by examining its adoption in the memory products of semiconductor factory. The comparison is performed through simulation using ProSys; a window 95 based discrete system simulation software, as a tool for comparing performance of two proposed layouts. The comparison demonstrates that when the number of device variable change is small, in-line layout is more efficient in terms of production Quantity. However, as the number of device variable change is more than 14 times, stand alone layout prevails over in-line layout.
Journal of the Korea Institute of Information and Communication Engineering
/
v.19
no.10
/
pp.2396-2402
/
2015
Air compressor, as an essential equipment used in the factory and plant operations, accounts for around 30% of the total electricity consumption in U.S.A, thereby being proposed advanced technologies to reduce electricity consumption. When the fluctuation of the compressed airflow rate is small, the system stability is increased followed by the reduction of the electricity consumption which results in the efficient design of the energy system. In the statistical analysis, the normal distribution, log normal distribution, gamma distribution or the like are generally used to identify system characteristics. However a single distribution may not fit well the data with long tail, representing sudden air flow rate especially in extremes. In this paper, authors decouple the compressed airflow rate into two parts to present a mixture of distribution function and suggest a method to reduce the electricity consumption. This reduction stems from the fact that a general pareto distribution estimates more accurate quantile value than a gaussian distribution when an airflow rate exceeds over a large number.
The automated visual inspection system (machine vision system) for quality assurance is important factory automation equipment in the manufacturing industries, such as display, semiconductor, etc. There is a lot of demand for the machine vision engineers. However, there are no technical training courses for machine vision technologies in vocational schools, colleges and universities. In this paper, we present the implementation of line scan camera based equipment for technical training of the automated visual inspection system. The training system consists of the X-Y stage which is widely used in machine vision industries and its variable image resolution are set to $10-30{\mu}m$. Additionally, this training system can attach the industrial illumination, either the direct illuminator or coaxial illuminator, for verifying the effect of illuminations. This means that the trainee can have a practical training in various equipment conditions and the training system is similar to the automated visual inspection system in industries.
Information lead time is defined as the time spent by processing orders from some buyers, whereas order lead time is defined as producing and supplying the products. The information lead time significantly serve to magnify the increase in variability due to demand forecasting. This paper models a decentralized supply chain composed of cascade type which has four type phases (or divisions) such as retailer, wholesaler, distributor, and factory. Each phases is managed by different centers individually with their own local inventory information. We investigate whether each phase's Information lead time affects companies networked a value chain. In particular, on several experiments performed with a programmed simulation (like a MIT beer game), we study the following question ; Can information lead times do better than material lead times in cost-benefit perspective\ulcorner Can more much Information lead times in downstream reasonably do worser than in upstream when playing the simulation\ulcorner In the conclusion, we show the importance of information lead time on a SC and, besides, guarantee that improvement of information lead time in upstream do more effective than one in downstream in cost-benefit perspective.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.628-631
/
2006
Modular Construction is a method, which factory-produced units are transferred to on-site and assembled to form complete buildings. It is expected that its demand will increase gradually. Because it has some advantages such as duration reduction, movement, reuse and environmental friendliness etc. For the Modular Construction to be introduced and applied, we needs the objective and reasonable performance criteria. This study presents the acoustic performance criteria of the modular building. For this one, this paper reviews legal standard related to performance, analyzes the performance evaluation and survey on pilot projects. The presented performance criteria can be specifically asked the demand by owner in a design guideline. In addition, it makes designer and general contractor accomplish target performance. Eventually, it can improve the performance of Modular Building.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.