• Title/Summary/Keyword: PMS_GIS program

Search Result 4, Processing Time 0.019 seconds

The Study on PMS System Development for Effective Asphalt Pavement Maintenance & Rehabilitation (아스팔트포장 도로의 유지관리체계 개선에 관한 연구)

  • Jo, Byung-Wan;Han, Sang-Joo
    • International Journal of Highway Engineering
    • /
    • v.5 no.1 s.15
    • /
    • pp.19-34
    • /
    • 2003
  • In this study, developed economic and efficient Pavement Management System (PMS) that can produce suitable M/R method through estimation and analysis of pavement condition exactly, to overcome past unscientific pavement management limitations. First on the basis of data of the inside and outside of the country on PMS and pavement condition data of Seoul metropolitan, composed logical algorithm such as pavement condition investigation and analysis, detailed eye investigation whole system estimation etc, and it verified that this algorithm is suitable system through the inside and outside of the county PMS research examples and results of detailed eye investigation. Also, Considering user interface, developed PMS program and GIS program with such logical algorithm.

  • PDF

The Program Development for Building Pavement Maintenance and Rehabilitation System (포장도로 유지관리 시스템 구축을 위한 프로그램 개발)

  • 조병완;태기호;한재호;최혜미;권병철
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1009-1014
    • /
    • 2002
  • In this study, developed economical and scientific Pavement Management System(PMS) that can produce suitable maintenance method through judgement and analysis of pavement condition exactly, to overcome past unscientific pavement management limitations. First, on the basis of data of the inside and outside of the country on PMS, composed logical algorithm such as pavement condition investigation and analysis, detailed naked eye investigation, whole system estimation etc., and it verified that this algorithm is suitable system through the inside and outside of the country PMS research examples and results of detailed naked eye investigation. Also, developed easily usable PMS program and PMS_GIS program with such logical algorithm.

  • PDF

The Study on PMS Development for Effective Asphalt Pavement Maintenance and Rehabilitation (서울시 포장도로 유지관리체계(PMS) 개선에 관한 연구)

  • Tae Ghi Ho;Jo Byung Wan;Lee Doo Hwa;Park Jong Hwa
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.432-437
    • /
    • 2004
  • In this study, Pavement Management System(PMS) was developed to overcome the unscientific pavement management limitations of the past. PMS program is economic, efficient and scientific. Also, it produces the best maintenance method through exact judgement and logical analysis of pavement condition. First of all, the logical algorithm, that is such as investigation and analysis of pavement, detailed naked eye investigation and the estimation for whole system etc., was composed on the basis of the domestic and the outside data on PMS and pavement condition data of Seoul metropolitan. And then it was verified that this algorithm is suitable through the research examples of PMS data and the results of detailed naked eye investigation. Also, Geographic Information System(GIS) was integrated on PMS program. Therefore, PMS program was developed so as to use easily on the basis of the logical algorithm.

  • PDF

Optimization of Municipal Pavement Management System(PMS) Components (Development of a Prototype PMS for Ansan City) (시도로 포장관리체계(PMS) 구성요소 최적화 연구 (안산시 Prototype PMS 개발사례))

  • Park, Sang-Kyu;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.4 s.6
    • /
    • pp.111-122
    • /
    • 2000
  • PMS(Pavement Management System) has been developed and/or operated for the freeway and national highway systems in Korea. There is, however, no municipal PMS that is necessary in many cities for efficient management of their roadways. In this study, a municipal Prototype PMS is developed. The Prototype PMS is designed to be operated on PC base. It uses GIS interface for user friendliness that applies color graphics, text and distress pictures to display pavement conditions and rehabilitation information for both current and historical situations. The computer program of the prototype PMS consists of four major functions(inquiry, analysis, data management, and print). Especially, prioritization and M&R(Maintenance and Rehabilitation) alternative selection procedure is designed to be flexible so that the users can modify the decision criteria whenever it is necessary. Database items of the Prototype PMS is carefully selected for the objectives and size of municipal PMS. Reference point method is basically used for the location referencing in the Database. The unit section consists of each loom segment of the road for effective management.

  • PDF