Journal of Advanced Marine Engineering and Technology
/
제28권5호
/
pp.746-753
/
2004
In this paper, the Power Management System(PMS) which based on a decision making system according to power strategy is proposed and implemented. PMS is designed to have functions of power monitoring. controlling, synchronizing load sharing and monitoring of driving engine, etc. PMS consists of the internet communication system(ICS). Remote Management System(RMS) and Sensor Driver System (SDS) ICS transmits the monitoring and supervisory data via Internet to Remote Management System(RMS) in real-time SDS detects various power system data on local generator and utility via I/O interface system. I/O interface system receives various status data and outputs control signals. Implemented PMS is tested with dummy signal to verify proposed functions and shows good results. For future study implemented PMS will be tested under real load condition to merchandize.
A PMS (Power Management System) controls vessel's power systems to improve the system efficiency and to protect a blackout condition. The PMS should be developed with considering the type and the capacity of the vessel's power system. It is necessary to test the PMS functions developed for vessel's safe operations under various sailing situations. Therefore, the function tests in cooperation with practical power systems are required in the PMS development. In this paper, a hardware-in-the-loop (HIL) simulator is developed for the purposes of the PMS function tests. The HIL simulator can be more cost-effective, more time-saved, easier to reproduce, and safer beyond the normal operating range than conventional off-line simulators, especially at early stages in development processes or during fault tests. Vessel's power system model is developed by using a MATLAB/SIMULINK software and by communicating between an OPAL-RT's OP5600 simulator. The PMS uses a Modbus communication protocol implemented using LabVIEW software. Representative tests of the PMS functions are performed to verify the validity of the proposed HIL-based test platform.
In this paper, Power Management System(PMS) simulator for Liquid Nature Gas Carrier(LNGC) is developed. Major components of power system for LNGC, such as generator, diesel engine and governor, transformer, circuit breaker, and 3 phase loads models are built based on MATLAB/SIMULINK. With these designed major parts, PMS simulator modeling is carried out. Based on MATLAB/Graphical User Interface, PMS simulator control for LNGC, and Human Machine Interface for monitoring is designed. PMS simulator for LNGC carries out simulation according to sequence of characteristics analysis. By comparing results of predicted simulation for each sequence to that of characteristics analysis, the reliability of PMS simulator for LNGC will be verified.
The ESS is composed of Battery Package, PCS(Power Conditioning System) Package, BCU(BESS Control Unit). In Jeju smart grid test-bed, we have developed a business model by ESS power system, renewable energy, transportation, such as customers, and have demonstrated above things. We have analyzed the EMS(Energy Management System) model of KPX where manages supply and demand of domestic electrical power system. We modified and launched EMS for microgrid but the cost was expensive and the system was large size. For releasing this system from industry as a whole, it is imperative to develop PMS(Power Management System) for microgrid. However, the cost of EMS for microgrid is expensive, some systems because it is a large development of the all of the first fruits in urgent PMS(Power Management System) for microgrid to be used in industry in general. Therefore, in this paper, we propose the ESS model considering the power systems characteristics and extensibility in korea. and also we propose the PMS to manage the ESS systems.
The electric power industry have recently been building out Smart Grids, a two-way electricity grid that connects power consumers and producers to a network that enables one to respond quickly to any eventuality. The construction of a two-way electricity grid means that the power control process becomes unified, from what used to be separate processes that originate individually from the consumption phase and the production and supply phases. The role of power control that takes place within each section of the power system may be independent. However, this does not mean the independent control sections are operated individually, but are configured to meet a single target and purpose. Each control section possesses enough degree of independency to respond to eventualities that may occur within different stages of the power system, but at the same time, possesses unified system elements for the stability of the entire power system. From this perspective, Smart Grids are widely regarded as the most rational power industry operation plan. A variety of different control and communication systems can be applied for an effective deployment of Smart Grids. Recently, we have seen systems such as PMS(Power Management System) and PAS(Process Automation System) applied in the deployment of Smart Grids, which are developed from the techniques utilized in the industry. The PMS is attracting particular attention for its power operations management ability. In this study, we propose plans for improvement in the rational development of power system controls through case studies of live PMS operations.
International Journal of Aeronautical and Space Sciences
/
제17권4호
/
pp.631-640
/
2016
A dual-mode power management for a hybrid-electric UAV with a cruise power of 200W is proposed and empirically verified. The subject vehicle is a low-speed long-endurance UAV powered by a solar cell, a fuel cell, and a battery pack, which operate in the same voltage bounds. These power sources of different operational characteristics can be managed in two different methods: passive management and active management. This study proposes a new power management system named PMS2, which employs a bypass circuit to control the individual power sources. The PMS2 normally operates in active mode, and the bypass circuit converts the system into passive mode when necessary. The output characteristics of the hybrid system with the PMS2 are investigated under simulated failures in the power sources and the conversion of the power management methods. The investigation also provides quantitative comparisons of efficiencies of the system under the two distinct power management modes. In the case of the solar cell, the efficiency difference between the active and the passive management is shown to be 0.34% when the SOC of the battery is between 25-65%. However, if the SOC is out of this given range, i.e. when the SOC is at 90%, using active management displays an improved efficiency of 6.9%. In the case of the fuel cell, the efficiency of 55% is shown for both active and passive managements, indicating negligible differences.
액화천연가스운반선(LNGC) 건조 시 증가하는 리스크로 인해 시스템 통합 및 안전 운용에 다양한 시나리오의 사전 시뮬레이션이 필요하다. 특히, LNGC에서 전력관리시스템은 중요한 장비이고, 전력 제어 시스템과의 오류없는 통합이 이루어져야 기대하는 성능 및 안전성이 보장된다. 본 논문에서는 LNGC에서 발생하는 오류를 개선하기 위해 Software-In-the-Loop(SIL) 기반의 PMS 테스트용 전력 발생원과 소모원에 대한 시뮬레이션 모델을 구현하였다. PMS 제어 및 검증을 위해 MATLAB/Simulink를 활용하여 수치적 물리 시뮬레이션 모델링을 수행하였고, 시뮬레이션 모델을 검증하기 위하여 시운전 시나리오를 대상으로 부하 분배 테스트를 하였다. PMS SIL 시뮬레이션은 고부가가치 선박 및 해양플랜트의 시운전, 설치, 유지보수 시장 진출에 크게 기여할 것으로 사료된다.
최근 정부의 에너지 정책에 힘입어 ESS(: Energy Storage System) 설비가 증가하고 있으며 이로 인해 화재 폭발 등 다양한 사건사고가 발생하고 있다. 현재 ESS는 PMS(: Power Management System) 포함하여 모든 시스템이 현장에 설치되어있는 통합형 ESS로 구축되어 있다. 이 시스템은 사고 발생 시 산화되어 데이터의 부재 가능성이 매우 높을 뿐만 아니라 외부에 존재하는 관리자가 사고 발생 시 신속하게 대응할 방법이 없는 상황이다. 이에 본 논문에서는 별도의 WAS 및 데이터 스토리지 구축을 통해 기존 시스템에서의 주요 기능을 분리하여 외부에서 EMS(: Energy Management system) 운용이 가능함과 동시에 사고 발생 시 원인 및 신속한 대응이 가능한 독립형 PMS 개발을 제안하고자 한다.
전력 관리 시스템인 PMS는 선박 통합 제어 시스템에서 중요한 역할을 한다. 본 연구에서는 액화 천연가스선의 PMS를 검증하기 위해서 실시간 HIL 시뮬레이션을 구현한다. 시뮬레이터는 터빈 발전기 디젤발전기, 차단기, 주요 3상 부하로 구성되고, 이들 모델은 MATLAB/Simulink로 구현한다. 더불어 FPGA 기반 제어 콘솔과 메인 스위치보드를 구축하여 선박에 탑재 되어 있는 LNGC PMS 제어 환경을 모사 한다. PMS 기능 검증을 위해 LNGC 내 주요 전력소모원 대비 두 가지 전력 분배 모드를 테스트 케이스로 수행한다. 그 결과 본 연구에서 제안한 시스템은 PMS 시뮬레이터로써 시운전 테스트뿐만 아니라 오류 주입 검증용으로 사용될 것이다.
HIL 시뮬레이션은 복잡한 실시간 임베디드 시스템을 개발하고 테스트하는 데 사용되는 기법이다. HIL 테스트는 해양플랜트와 같은 고부가가치 선박인 LNGC의 PMS 성능 검증을 위한 효율적인 플랫폼이 된다. 그러나 국내 조선소를 비롯한 연구기관에서 스스로 HIL 테스트를 수행하기에는 시간이 필요하다. 이 문제를 해결하기 위해, 본 연구는 전력 공급 장치 / 소비 장치, 제어콘솔, MSBD 로 구성된 FPGA 기반의 PMS-HIL 시뮬레이터를 제안한다. 제안된 HIL시뮬레이션 플랫폼은 실제 장비 데이터를 사용하였고, PMS의 부하 공유 테스트를 수행하였다. 제안된 시스템은 대칭, 비대칭 및 고정 부하분배를 통해 검증하였고 공장수락시험 대체 가능성을 보여 준다. 또한 향후 에너지관리시스템 개발을 비롯한 선박 자동화 및 자율운항을 위한 추가 시스템 개발 시 많은 도움을 줄 것으로 사료된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.