• Title/Summary/Keyword: PLANT SOCIETY

Search Result 40,784, Processing Time 0.063 seconds

Characterization of DRL1 and AtELPs gene

  • Cho, Kiu-Hyung;Choi, Hoon-Sung;Jun, Sang-Eun;Yi, Young-Byung;Hirokazu, Tsukaya;Kim, Gyung-Tae
    • Proceedings of the Korean Society of Plant Biotechnology Conference
    • /
    • 2005.11a
    • /
    • pp.196-196
    • /
    • 2005
  • PDF

The Quest for Plant Nematode Biological Control-Facts and Hypotheses

  • Zuckerman, Bert M.;Esnard, Joseph
    • Proceedings of the Korean Society of Plant Pathology Conference
    • /
    • 1994.06a
    • /
    • pp.62-74
    • /
    • 1994
  • The current status of the development of commercial products for the biological control of plant-parasitic nematodes is discussed. an example is given of problems encountered by our program in patenting biocontrol agents in the United Stats. Two hypothetical approaches to the control of plant nematodes are considered. First recent experimental results relating to the theory on intervention with host-finding by plant nematodes are reviewed. Second, a newer hypothesis considering the possibilities for genetic approaches to modifying molecular signals between nematodes and their parasites is described.

  • PDF

The establishment of R&D management system for Gas Plant R&D Center (가스플랜트 사업단에서 연구관리스템 구축)

  • Hwang, Seong Ha;Yoo, Sun Il;Nam, Tae Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.1
    • /
    • pp.19-29
    • /
    • 2008
  • Traditionally gas plant R&D has had a world-wide weak position in terms of high technology. Especially System engineering did not exactly apply to gas plant construction. So, Gas Plant R&D Center is determined to make the establishment of the system engineering for the standard of gas plant. Gas Plant R&D Center has two projects. Firstly, the establishment of the R&D management system. Secondly, the system engineering which is included in the VE concept of EPC parts. But Gas Plant R&D Center exists in the particular conditions for successful development of the new process and core equipments. Now we will describe the establishment of R&D management system and particular conditions(Risk Conditions) for gas plant.

  • PDF